Nirvana Project at Malad East by B-Right (P51800033952)
  • Rating: 3.3
  • (50)

Nirvana - Malad East

B-Right
Project Details, Configuration & Prices
1 BHK460 Sq.ft. Carpet ₹ 1.08 Cr++
2 BHK555 Sq.ft. Carpet ₹ 1.30 Cr++
2 BHK657 Sq.ft. Carpet ₹ 1.54 Cr++
Project overview
Nirvana Project at Malad East by B-Right (P51800033952) is a RERA approved Under Construction Project with RERA ID P51800033952 slated to be ready for possession by Dec 2025 with 1/2 BHK apartments / Flats starting from ₹ 1.08 Crs onwards

Nirvana is a Residential Project Developed by B-Right Developers. It is located at Malad East. It is well-connected to various parts of Mumbai through a network of roads, highways, and public transportation. The Western Express Highway, which runs along the eastern border of Malad East, provides easy access to other parts of the city. The Malad railway station is a major suburban railway station on the Western Line, offering convenient train services for commuters. Nirvana is a multi storey tower offering 1 and 2 bHK Residences with modern amenities and facilities which includes rooftop amenities like swimming pool, jacuzzi, kid's play area etc.
Nirvana QR Code
Nirvana
MahaRERA - P51800033952

Raheja Residency

₹ 1.95 Crs. onwards
Malad East
2 BHK apartments
View Details

Center Plaza

₹ 72.21 Lacs. onwards
Malad East
Office BHK apartments
View Details
Malad East
Office BHK apartments
View Details

Alta Monte Tower B

₹ 2.6 Crs. onwards
Malad East
2/3/4 BHK apartments
View Details

Omkar Signet

₹ 95 Lacs. onwards
Malad East
1/2 BHK apartments
View Details

Highland 1978

₹ 1.11 Crs. onwards
Malad East
1/2 BHK apartments
View Details

Tower 28 - F

₹ 96.75 Lacs. onwards
Malad East
1/2/3 BHK apartments
View Details

DGS Sheetal Shree Ramkunj

₹ 88.97 Lacs. onwards
Malad East
1/2/3 BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    Nirvana
  • Location:
  • Malad East, Next to St. George High School
  • Const. Stage:
    Under Construction
  • Possession:
    Dec 2025
Developer Details

B-Right

  • Developer:
    B-Right
  • Phone:
  • Website:
  • Address:
  • 702, 7th floor, Shah Trade Center, Rani Sati Road, Malad East, Mumbai- 400 097
Project Ratings
Project Amenities
Amenities offred in Nirvana
LIFESTYLE AMENITIES
Outdoor GamesIndoor GamesKid's play areaJogging TrackHigh speed elevatorsGrand entrance lobbyGymnasiumHealth ClubClub HouseSwimming PoolIntercom/CCTVVideo Door PhonesPOP finished wallsImported Sanitary FittingsVitrified flooringPiped GasKitchen CabinetsModular KitchenGranite PlatformReception DeskMulti Purpose Hall
Project RERA Details
RERA Project Status New
Proposed Possession 31 Dec 2025
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800033952
RERA Project Name Nirvana
RERA Location 453, 452, 454, 452 1 To 12, 278/E/3, 451
RERA Developer Siddhivinayak Developers Kurar
Architect Rasik P Hingoo Associates
Project RERA Details
Project Type Others
Funding Bank YES BANK
Last Modified 09 Apr 2022
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Malad East

Facilities & Amenities
Facilities, Amenities & Common areas details of Nirvanalast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
During Structure Work Will Be Done
Energy management
Na
Fire Protection And Fire Safety Requirements
During Structure Work Will Be Done
Landscaping & Tree Planting
After Completion Tree Planting Will Be Done
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Na
Solid Waste Management And Disposal
During Structure Work Will Be Done
Storm Water Drains
During Structure Work Will Be Done
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
During Structure Work Will Be Done
Water Supply
During Structure Work Will Be Done
Buildings / Wings in Nirvana
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Nirvanaby B-Rightlast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

28599 Sq. ft.

Project Area

5242 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

100 apartments in total
Total
100
Booked
0
Available
100

Saleable Area Statistics (Sq. ft.)

47471 Total
Total
47471
Booked
0
Available
47471
Total 100 apartments in project. 0 apartments booked. 0% apartments booked.
Total 4410.15 saleable area. 0 apartments booked.
0% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingDec 20252310600060
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Work Description in Building A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress40% done
40% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress20% done
20% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress70% done
70% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress95% done
95% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress70% done
70% Booked
Stilt Floor
work-in-progress95% done
95% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingDec 20252310610061
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK42.07 Sq.mts. ( 453 Sq.ft. )76
None Booked0% Booked
0% Booked
2 BHK43.54 Sq.mts. ( 469 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK45.74 Sq.mts. ( 492 Sq.ft. )3
None Booked0% Booked
0% Booked
2 BHK48.5 Sq.mts. ( 522 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK51.15 Sq.mts. ( 551 Sq.ft. )10
None Booked0% Booked
0% Booked
2 BHK60.23 Sq.mts. ( 648 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK41.91 Sq.mts. ( 451 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop18.64 Sq.mts. ( 201 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop32.46 Sq.mts. ( 349 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop60.76 Sq.mts. ( 654 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop124.12 Sq.mts. ( 1336 Sq.ft. )1
None Booked0% Booked
0% Booked
100 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress40% done
40% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress20% done
20% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress70% done
70% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress95% done
95% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress70% done
70% Booked
Stilt Floor
work-in-progress95% done
95% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Project Consultants
Channel Partners Registered by Developer
B-Right
for Project
Nirvana
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About B-Right

B-Right