Tata Serein Project at Thane West by Tata Housing (P51700000295)
  • Rating: 4.9
  • (184)

Tata Serein - Thane West

Tata Housing
Project Details, Configuration & Prices
3 BHK1140 Sq.ft. Carpet ₹ 3.25 Cr All In
Project overview
Tata Serein Project at Thane West by Tata Housing (P51700000295) is a Ready Possession Project with 3 BHK apartments / Flats starting from ₹ 2.85 Crs onwards

Tata Serein is a Residential Project Developed by Tata Housing. The project is located in the highly coveted neighborhood of Pokhran Road No. 2, known as the Malabar Hill of Thane. It is referred to as the Malabar Hill of Thane due to its fine infrastructure and surroundings. The Upvan Lake is in close proximity to the project. The Eastern Express Highway is 1.5 km from the project, providing easy access to major transportation routes. Thane Station is located a few kilometers away from Pokhran Road No. 2. The proposed Metro Rail Project will provide further convenience and accessibility in the future. Spread over 7.5 acres, Tata Serien consists of four residential towers, ranging from 27 to 31 stories. The project features a clubhouse spanning over 18,000 sq. ft. and offers 1BHK, 2BHK, and 3BHK residences. The residential towers have an engineered glass façade, allowing for maximum natural sunlight and ventilation. The project incorporates sustainable features such as rainwater harvesting, solar energy utilization, and centralized waste management systems. The residences include unique wellness elements such as Vitamin C induced showers and dehumidifiers. OC Received
Tata Serein QR Code
Tata Serein
MahaRERA - P51700000295

Kalpataru Paramount

₹ 99 Lacs. onwards
Thane West
2 BHK apartments
View Details

Orovia-Commercials

₹ 2.16 Crs. onwards
Thane West
Office BHK apartments
View Details

Godrej Emerald

₹ 1.05 Crs. onwards
Thane West
1½/2/3 BHK apartments
View Details

Godrej Exquisite

₹ 1.15 Crs. onwards
Thane West
1/2/3 BHK apartments
View Details

Kalpataru Parkcity

₹ 84.89 Lacs. onwards
Thane West
2 BHK apartments
View Details

Sheth Cnergy

₹ 1.67 Crs. onwards
Thane West
Office BHK apartments
View Details

Godrej Upavan

₹ 67.07 Lacs. onwards
Thane West
2 BHK apartments
View Details

Victoria Towers

₹ 3.59 Crs. onwards
Thane West
3/4/5 BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    Tata Serein
  • Location:
  • Thane West, Pokhran Road No.2 Upvan Lake. Nr, Bethany Hospital
  • Const. Stage:
    Ready Possession
  • Possession:
  • Parking:
    Open;Stilt;
  • Floors:
    29
Developer Details

Tata Housing

  • Developer:
    Tata Housing
  • Phone:
    022 66614500
  • Website:
    www.tatahousing.in
  • Address:
  • Times Tower, 12th Floor, Kamala Mills Compound, Senapati Bapat Marg, Lower Parel, Mumbai - 13.
Project Ratings
Project Brochures
Brochures of Tata Sereinby Tata Housing
Project Brochures
  • MPE/Brochures/15413/Tata Serein Brochure.pdf
  • MPE/Brochures/15413/Floor Plans.pdf
Project Amenities
Amenities offred in Tata Serein
LIFESTYLE AMENITIES
Swimming PoolClub HouseGymnasiumKid's play areaIndoor GamesJogging TrackVitrified flooringPOP finished wallsIntercom/CCTVGranite PlatformMulti Purpose HallConcierge ServicesYoga RoomMassage RoomPet Area
Project RERA Details
RERA Project Status Ongoing
Proposed Possession 30 Sep 2022
Revised Possession 30 Sep 2022
Extended Possession 31 Mar 2023
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51700000295
RERA Project Name Serein Phase 1
RERA Location 280/2B/2, 281/2A/1A , 288/2D/1B
RERA Developer Ardent Properties Private Limited
Architect Edifice Consultant Private Limited
Project RERA Details
Project Type Residential / Group Housing
Funding Bank IDBI BANK
Last Modified 29 Sep 2022
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Thane West

Facilities & Amenities
Facilities, Amenities & Common areas details of Tata Sereinlast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
C
Community Buildings100% completed
95% Complete
Club House
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
C
Energy management100% completed
95% Complete
C
Fire Protection And Fire Safety Requirements100% completed
95% Complete
C
Landscaping & Tree Planting100% completed
95% Complete
C
Open Parking
C
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
C
Solid Waste Management And Disposal100% completed
95% Complete
C
Storm Water Drains100% completed
95% Complete
C
Street Lighting100% completed
95% Complete
C
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
C
Water Conservation, Rain water Harvesting100% completed
95% Complete
C
Water Supply100% completed
95% Complete
Domestic Water Supply Will Be From Tmc
Buildings / Wings in Tata Serein
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Tata Sereinby Tata Housinglast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

261759 Sq. ft.

Project Area

34723 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

621 apartments in total
Total
621
Booked
614
Available
7

Saleable Area Statistics (Sq. ft.)

416417 Total
Total
416417
Booked
411645
Available
4772
Total 621 apartments in project. 614 apartments booked. 98% apartments booked.
Total 38686.1 saleable area. 38242.79 apartments booked.
99% area booked.

Tower 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 2Sep 202233110103
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK68.43 Sq.mts. ( 737 Sq.ft. )10
10 Booked100% Booked
100% Booked
2 BHKC2L68.32 Sq.mts. ( 735 Sq.ft. )32
32 Booked100% Booked
100% Booked
2 BHKC3L67.26 Sq.mts. ( 724 Sq.ft. )10
8 Booked80% Booked
80% Booked
3 BHKDL91.53 Sq.mts. ( 985 Sq.ft. )20
20 Booked100% Booked
100% Booked
3 BHKE1L86.39 Sq.mts. ( 930 Sq.ft. )8
8 Booked100% Booked
100% Booked
3 BHKE2L86.29 Sq.mts. ( 929 Sq.ft. )4
4 Booked100% Booked
100% Booked
3 BHKE2LT285.54 Sq.mts. ( 921 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHKE3L87.64 Sq.mts. ( 943 Sq.ft. )6
6 Booked100% Booked
100% Booked
3 BHKE3LT286.78 Sq.mts. ( 934 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHKE4L85.04 Sq.mts. ( 915 Sq.ft. )2
2 Booked100% Booked
100% Booked
DUPLEXT2A144.85 Sq.mts. ( 1559 Sq.ft. )3
3 Booked100% Booked
100% Booked
DUPLEXT2A1146.1 Sq.mts. ( 1573 Sq.ft. )3
3 Booked100% Booked
100% Booked
DUPLEXT2B148.96 Sq.mts. ( 1603 Sq.ft. )6
6 Booked100% Booked
100% Booked
108 total apartments / 106 apartments booked. 98% apartments booked.
Work Description in Building Tower 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Tower1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower1Sep 202228110103
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHKA1S60.47 Sq.mts. ( 651 Sq.ft. )56
56 Booked100% Booked
100% Booked
2 BHKA2S66.06 Sq.mts. ( 711 Sq.ft. )14
14 Booked100% Booked
100% Booked
2 BHKA3S63.99 Sq.mts. ( 689 Sq.ft. )13
13 Booked100% Booked
100% Booked
2 BHKA4S62.1 Sq.mts. ( 668 Sq.ft. )13
12 Booked92% Booked
92% Booked
2 BHKB1S65.98 Sq.mts. ( 710 Sq.ft. )14
14 Booked100% Booked
100% Booked
2 BHKC1S59.02 Sq.mts. ( 635 Sq.ft. )28
28 Booked100% Booked
100% Booked
3 BHKA1S83.28 Sq.mts. ( 896 Sq.ft. )28
28 Booked100% Booked
100% Booked
3 BHKA2S81.38 Sq.mts. ( 876 Sq.ft. )28
28 Booked100% Booked
100% Booked
3 BHKB1S81.31 Sq.mts. ( 875 Sq.ft. )12
12 Booked100% Booked
100% Booked
3 BHKB2S83.2 Sq.mts. ( 896 Sq.ft. )12
12 Booked100% Booked
100% Booked
3 BHKB2ST285.05 Sq.mts. ( 915 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHKB3S85.27 Sq.mts. ( 918 Sq.ft. )9
9 Booked100% Booked
100% Booked
3 BHKC1S79.92 Sq.mts. ( 860 Sq.ft. )28
28 Booked100% Booked
100% Booked
3 BHKD1S85.2 Sq.mts. ( 917 Sq.ft. )9
8 Booked88% Booked
88% Booked
3 BHKD2ST284.97 Sq.mts. ( 915 Sq.ft. )1
1 Booked100% Booked
100% Booked
266 total apartments / 264 apartments booked. 99% apartments booked.
Work Description in Building Tower1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Tower4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower4Sep 202233110103
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHKAS41.49 Sq.mts. ( 447 Sq.ft. )192
192 Booked100% Booked
100% Booked
1 BHKBL37.86 Sq.mts. ( 408 Sq.ft. )32
32 Booked100% Booked
100% Booked
2 BHKES53.83 Sq.mts. ( 579 Sq.ft. )23
20 Booked86% Booked
86% Booked
247 total apartments / 244 apartments booked. 98% apartments booked.
Work Description in Building Tower4Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Project Consultants
Channel Partners Registered by Developer
Tata Housing
for Project
Serein Phase 1
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Tata Housing

Tata Housing Tata Housing Development Company is India's fastest growing real estate developer, straddling across all consumer segments from value to super luxury housing. The company has presence in all major and mini metros and is developing over 55 million sq.ft. which is under various stages of development. The company is headed by MD & CEO, Mr. Brotin Banerjee, and aims to be amongst the top three developers in the next 3 years. All the projects of Tata Housing are certified green developments by IGBC, designed by reputed International architects.