Sheth Cnergy Project at Thane West by Ashwin Sheth Group (P51700023047)
  • Rating: 4.0
  • (147)

Sheth Cnergy - Thane West

Project Details, Configuration & Prices
Office577 Sq.ft. Carpet ₹ 2.06 Cr ++
Office609 Sq.ft. Carpet ₹ 2.17 Cr ++
Office639 Sq.ft. Carpet ₹ 2.27 Cr ++
Office657 Sq.ft. Carpet ₹ 2.34 Cr ++
Office725 Sq.ft. Carpet ₹ 2.58 Cr ++
Office892 Sq.ft. Carpet ₹ 3.17 Cr ++
Project overview
Sheth Cnergy Project at Thane West by Ashwin Sheth Group (P51700023047) is a RERA approved Under Construction Project with RERA ID P51700023047 slated to be ready for possession by Dec 2026 with Office BHK apartments / Flats starting from ₹ 1.67 Crs onwards

Sheth Cnergy is a Commercial project by Ashwin Sheth Group. It is a 12 storey tower located at Thane West. Well connected to Eastern and Western Express Highway. Connectivity to many commercial hubs like BKC, Powai, Wagle Estate. Close proximity to the social infrastructure. It offers office spaces ranging from 570 Sq.ft and above. Naturally lit work environment. Unobstructed views though glass. Sophisticated glazing that protects from heat. Double glazed glass facade building. 3.75 meter ceiling height. Thoughtfully designed layout. Flexible floor plates to customize and maximise office space. Landscape area on every 3rd floor. 24*7 security surveillance.
Sheth Cnergy QR Code
Sheth Cnergy
MahaRERA - P51700023047

Godrej Emerald

₹ 1.05 Crs. onwards
Thane West
1½/2/3 BHK apartments
View Details

Kalpataru Paramount

₹ 99 Lacs. onwards
Thane West
2 BHK apartments
View Details

Orovia-Commercials

₹ 2.16 Crs. onwards
Thane West
Office BHK apartments
View Details

Godrej Exquisite

₹ 1.15 Crs. onwards
Thane West
1/2/3 BHK apartments
View Details

Kalpataru Parkcity

₹ 84.89 Lacs. onwards
Thane West
2 BHK apartments
View Details

Godrej Upavan

₹ 67.07 Lacs. onwards
Thane West
2 BHK apartments
View Details

Victoria Towers

₹ 3.59 Crs. onwards
Thane West
3/4/5 BHK apartments
View Details

Oberoi Forestville

₹ 2.5 Crs. onwards
Thane West
3/4½ BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    Sheth Cnergy
  • Location:
  • Thane West, Next to Sheth Fiona Near Jupiter Hospital
  • Const. Stage:
    Under Construction
  • Possession:
    Dec 2026
  • Parking:
    Open Reserved;
  • Floors:
    12
Developer Details

  • Developer:
    Ashwin Sheth Group
  • Phone:
  • Website:
    www.ashwinshethgroup.com
  • Address:
  • Sheth Group of Companies Ground & 3rd Floor, Prius Infinity, Behind Garware House,Paranjape B Scheme, Subhash Road, Vile Parle East, Mumbai - 400 057.
Project Ratings
Project Amenities
Amenities offred in Sheth Cnergy
LIFESTYLE AMENITIES
Power BackupAir Conditioned LobbyBusiness CentreHigh speed elevatorsGrand entrance lobbyImported Sanitary FittingsGranite PlatformSecurity Help DeskReception Desk
Project RERA Details
RERA Project Status New
Proposed Possession 30 Dec 2023
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51700023047
RERA Project Name Sheth Cnergy Ph 1 - Upto 11Th Floor
RERA Location S No 35 Pt 4, 35 Pt 8, 35 Pt 9
RERA Developer Sheth Developers Private Limited
Architect Bipin
Project RERA Details
Project Type Commercial
Funding Bank ICICI BANK LIMITED
Last Modified 20 Mar 2025
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Thane West

Facilities & Amenities
Facilities, Amenities & Common areas details of Sheth Cnergylast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
-
CAFETERIA
-
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
-
Energy management
-
Fire Protection And Fire Safety Requirements20% completed
20% Complete
-
Landscaping & Tree Planting
-
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
-
Solid Waste Management And Disposal
-
Storm Water Drains
-
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
-
Water Conservation, Rain water Harvesting
-
Water Supply
-
Buildings / Wings in Sheth Cnergy
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sheth Cnergyby Ashwin Sheth Grouplast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

69067 Sq. ft.

Project Area

13813 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

173 apartments in total
Total
173
Booked
122
Available
51

Saleable Area Statistics (Sq. ft.)

123529 Total
Total
123529
Booked
88822
Available
34707
Total 173 apartments in project. 122 apartments booked. 70% apartments booked.
Total 11476.17 saleable area. 8251.81 apartments booked.
72% area booked.

Sheth Cnergy

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sheth CnergyDec 2022512000353
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Office space53.06 Sq.mts. ( 571 Sq.ft. )11
7 Booked63% Booked
63% Booked
Office space53.57 Sq.mts. ( 577 Sq.ft. )22
15 Booked68% Booked
68% Booked
Office space56.06 Sq.mts. ( 603 Sq.ft. )11
6 Booked54% Booked
54% Booked
Office space56.57 Sq.mts. ( 609 Sq.ft. )11
4 Booked36% Booked
36% Booked
Office space58.8 Sq.mts. ( 633 Sq.ft. )11
10 Booked90% Booked
90% Booked
Office space59.31 Sq.mts. ( 638 Sq.ft. )44
37 Booked84% Booked
84% Booked
Office space60.98 Sq.mts. ( 656 Sq.ft. )11
6 Booked54% Booked
54% Booked
Office space67.38 Sq.mts. ( 725 Sq.ft. )22
15 Booked68% Booked
68% Booked
Office space82.83 Sq.mts. ( 892 Sq.ft. )22
17 Booked77% Booked
77% Booked
Shop98.72 Sq.mts. ( 1063 Sq.ft. )5
2 Booked40% Booked
40% Booked
Shop166.37 Sq.mts. ( 1791 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop291.06 Sq.mts. ( 3133 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop292.17 Sq.mts. ( 3145 Sq.ft. )1
1 Booked100% Booked
100% Booked
173 total apartments / 122 apartments booked. 70% apartments booked.
Work Description in Building Sheth CnergyCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress31% done
31% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
Project Consultants
Channel Partners Registered by Developer
Ashwin Sheth Group
for Project
Sheth Cnergy Ph 1 - Upto 11Th Floor
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Ashwin Sheth Group