Godrej Upavan Project at Thane West by Godrej Properties (P51700027436)
  • Rating: 4.3
  • (48)

Godrej Upavan - Thane West

Godrej Properties
Project Details, Configuration & Prices
2 BHK541 Sq.ft. Carpet ₹ 69.99 Lacs ++
Project overview
Godrej Upavan Project at Thane West by Godrej Properties (P51700027436) is a RERA approved Under Construction Project with RERA ID P51700027436 slated to be ready for possession by Aug 2025 with 2 BHK apartments / Flats starting from ₹ 67.07 Lakh onwards

Godrej Upavan is a Residential Project Developed by the renowned real estate developer Godrej Properties. It is located at Thane West. Thane West is well-connected to Mumbai and other parts of the MMR through various transportation modes. The Eastern Express Highway and the Thane-Belapur Road are major roadways that connect Thane to different parts of Mumbai and Navi Mumbai. Just 20 minutes from Majiwada Circle and the green stretches of Ghodbunder Road. 1 minute rom the metro station and 2 minutes from Samruddhi Highway. Close proximity to the social infrastructure. 20.4 Acres of land parcel with 12 towers (6 Towers Nirvaan + 6 Upavan). Nirvaan : S+ 25 Storey and Upavan : S+ 31 Storey. It offers 1 and 2 BHK Residences. Low density, High rise project. 2 Club House of 15000 Sq Feet Each. 50+ Amenities, swim, club, gym, concierge service and many more.
Godrej Upavan QR Code
Godrej Upavan
MahaRERA - P51700027436

Godrej Emerald

₹ 1.05 Crs. onwards
Thane West
1½/2/3 BHK apartments
View Details

Kalpataru Paramount

₹ 99 Lacs. onwards
Thane West
2 BHK apartments
View Details

Orovia-Commercials

₹ 2.16 Crs. onwards
Thane West
Office BHK apartments
View Details

Godrej Exquisite

₹ 1.15 Crs. onwards
Thane West
1/2/3 BHK apartments
View Details

Kalpataru Parkcity

₹ 84.89 Lacs. onwards
Thane West
2 BHK apartments
View Details

Sheth Cnergy

₹ 1.67 Crs. onwards
Thane West
Office BHK apartments
View Details

Victoria Towers

₹ 3.59 Crs. onwards
Thane West
3/4/5 BHK apartments
View Details

Oberoi Forestville

₹ 2.5 Crs. onwards
Thane West
3/4½ BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    Godrej Upavan
  • Location:
  • Thane West, Thane Extension
  • Const. Stage:
    Under Construction
  • Possession:
    Aug 2025
  • Floors:
    31
Developer Details

Godrej Properties

  • Developer:
    Godrej Properties
  • Phone:
  • Website:
    www.godrejproperties.com
  • Address:
  • Unit No 5C, 5th Floor, Godrej One, Pirojshanagar, Vikhroli East, Mumbai - 400 079.
Project Ratings
Project Brochures
Brochures of Godrej Upavan by Godrej Properties
Project Brochures
  • MPE/Brochures/29023/Godrej Upavan Mini Booklet.pdf
Project Amenities
Amenities offred in Godrej Upavan
LIFESTYLE AMENITIES
Power BackupOutdoor GamesIndoor GamesKid's play areaLandscaped gardenJogging TrackHigh speed elevatorsGrand entrance lobbyGymnasiumHealth ClubClub HouseSwimming PoolIntercom/CCTVPOP finished wallsImported Sanitary FittingsVitrified flooringGranite PlatformSecurity Help DeskReception Desk
Project RERA Details
RERA Project Status New
Proposed Possession 30 Jun 2028
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51700027436
RERA Project Name Godrej Upavan
RERA Location 40/1/2 40/2 40/3 40/4 40/5 40/640/740/840/940/1040/11 40/12 40/13/1/A 40/13/2 42 43/1 43/2 43/3 44/1/1 44/1/2 44/2/1 44/2/2 44/2/3 44/3/1 44/3/2 44/4 44/5 44/6 45/2/1 45/3/1 45/4 45/7 45/8 45/9 58/20/1 58/20/2 58/21 58/22 84 128/3/4 128/3/5 129/1 181
RERA Developer Prakhhyat Dwellings Llp
Project RERA Details
Project Type Residential / Group Housing
Funding Bank HDFC BANK
Last Modified 25 Jul 2025
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Thane West

Facilities & Amenities
Facilities, Amenities & Common areas details of Godrej Upavan last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Provided
Community Buildings
Club House Provided
Electrical Meter Room, Sub-Station, Receiving Station
Provided
Energy management
Na
Fire Protection And Fire Safety Requirements10% completed
10% Complete
Provided
Landscaping & Tree Planting
Provided
Multilevel Car Park building
1 Building
Open Parking
Provided
Sewerage (Chamber, Lines, Septic Tank , STP)5% completed
5% Complete
Provided
Shared Multilevel Car Park building
Shared With Phase 1 Residents. Built On Phase 1.
Solid Waste Management And Disposal
Provided
Storm Water Drains20% completed
20% Complete
Provided
Street Lighting
Provided
Treatment And Disposal Of Sewage And Sullage Water
Provided
Water Conservation, Rain water Harvesting2% completed
2% Complete
Provided
Water Supply2% completed
2% Complete
Provided
Buildings / Wings in Godrej Upavan
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Godrej Upavan by Godrej Propertieslast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

522097 Sq. ft.

Project Area

167907 Sq. ft.

Recreational Open Space

Total 6

Wings / Towers in Project

Apartments Statistics

2250 apartments in total
Total
2250
Booked
509
Available
1741

Saleable Area Statistics (Sq. ft.)

928564 Total
Total
928564
Booked
216162
Available
712402
Total 2250 apartments in project. 509 apartments booked. 22% apartments booked.
Total 86265.74 saleable area. 20081.97 apartments booked.
23% area booked.

Tower 10

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 10Jun 2028331010170
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 LUXE38.57 Sq.mts. ( 415 Sq.ft. )124
None Booked0% Booked
0% Booked
1 PREMIUM A33.03 Sq.mts. ( 356 Sq.ft. )124
None Booked0% Booked
0% Booked
1 PREMIUM B33.03 Sq.mts. ( 356 Sq.ft. )124
None Booked0% Booked
0% Booked
2 PREMIUM49.15 Sq.mts. ( 529 Sq.ft. )119
None Booked0% Booked
0% Booked
491 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Tower 10Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Tower 11

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 11Jun 2028331010170
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 LUXE38.57 Sq.mts. ( 415 Sq.ft. )36
None Booked0% Booked
0% Booked
1 PREMIUM A33.03 Sq.mts. ( 356 Sq.ft. )36
None Booked0% Booked
0% Booked
1 PREMIUM B33.03 Sq.mts. ( 356 Sq.ft. )36
None Booked0% Booked
0% Booked
2 PREMIUM49.15 Sq.mts. ( 529 Sq.ft. )35
None Booked0% Booked
0% Booked
143 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Tower 11Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Tower 12

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 12Jun 2028331010070
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 LUXE38.57 Sq.mts. ( 415 Sq.ft. )36
None Booked0% Booked
0% Booked
1 PREMIUM A33.03 Sq.mts. ( 356 Sq.ft. )36
None Booked0% Booked
0% Booked
1 PREMIUM B33.03 Sq.mts. ( 356 Sq.ft. )36
None Booked0% Booked
0% Booked
2 PREMIUM49.15 Sq.mts. ( 529 Sq.ft. )35
None Booked0% Booked
0% Booked
143 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Tower 12Completion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Tower 7

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 7Jun 2028331010168
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 LUXE38.57 Sq.mts. ( 415 Sq.ft. )124
None Booked0% Booked
0% Booked
1 PREMIUM A33.03 Sq.mts. ( 356 Sq.ft. )124
None Booked0% Booked
0% Booked
1 PREMIUM B33.03 Sq.mts. ( 356 Sq.ft. )124
None Booked0% Booked
0% Booked
2 PREMIUM49.15 Sq.mts. ( 529 Sq.ft. )119
None Booked0% Booked
0% Booked
491 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Tower 7Completion
Basement (if any)
Excavation
work-in-progress30% done
30% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Tower 8

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 8Jun 2028331010168
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 LUXE38.57 Sq.mts. ( 415 Sq.ft. )124
38 Booked30% Booked
30% Booked
1 PREMIUM A33.03 Sq.mts. ( 356 Sq.ft. )124
33 Booked26% Booked
26% Booked
1 PREMIUM B33.03 Sq.mts. ( 356 Sq.ft. )124
43 Booked34% Booked
34% Booked
2 PREMIUM49.15 Sq.mts. ( 529 Sq.ft. )119
68 Booked57% Booked
57% Booked
491 total apartments / 182 apartments booked. 37% apartments booked.
Work Description in Building Tower 8Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress75% done
75% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress90% done
90% Booked
Stilt Floor
Completed 100% done
100% Booked

Tower 9

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 9Jun 2028331010168
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 LUXE38.57 Sq.mts. ( 415 Sq.ft. )124
75 Booked60% Booked
60% Booked
1 PREMIUM A33.03 Sq.mts. ( 356 Sq.ft. )124
32 Booked25% Booked
25% Booked
1 PREMIUM B33.03 Sq.mts. ( 356 Sq.ft. )124
124 Booked100% Booked
100% Booked
2 PREMIUM49.15 Sq.mts. ( 529 Sq.ft. )119
96 Booked80% Booked
80% Booked
491 total apartments / 327 apartments booked. 66% apartments booked.
Work Description in Building Tower 9Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress61% done
61% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress95% done
95% Booked
Stilt Floor
Completed 100% done
100% Booked
Project Consultants
Channel Partners Registered by Developer
Godrej Properties
for Project
Godrej Upavan
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Godrej Properties

Godrej Properties Godrej Properties brings the Godrej Group philosophy of innovation, sustainability and excellence to the real estate industry. Each Godrej Properties development combines a 119–year legacy of excellence and trust with a commitment to cutting-edge design and technology. Godrej Properties is currently developing residential, commercial and township projects spread across approximately 11.89 million square meters in 12 cities. In the last 3 years, Godrej Properties has received over 150 awards and recognitions, including the "Real Estate Company Of The Year" at the Construction Week India Awards 2015, ‘Golden Peacock Award for Sustainability’ for the year 2015 by Institute Of Directors (IOD), "Most Reliable Builder for 2014" at the CNBC AWAAZ Real Estate Awards 2014, “Innovation Leader in Real Estate” award at the NDTV Property Awards 2014 and “Popular Choice - Developer of the Year” award by ET NOW in 2013.