Sheth Zuri Project at Thane West by Ashwin Sheth Group (P51700007274)
  • Rating: 4.4
  • (91)

Sheth Zuri - Thane West

Project Details, Configuration & Prices
1 BHK426 Sq.ft. Carpet ₹ 1.15 Cr All In
2 BHK515 Sq.ft. Carpet ₹ 1.40 Cr All In
2 BHK651 Sq.ft. Carpet ₹ 1.70 Cr All In
2 BHK654 Sq.ft. Carpet ₹ 1.70 Cr All In
2 BHK787 Sq.ft. Carpet ₹ 2.10 Cr All In
Project overview
Sheth Zuri Project at Thane West by Ashwin Sheth Group (P51700007274) is a Ready Possession Project with 1/2 BHK apartments / Flats starting from ₹ 1.15 Crs onwards

Sheth Zuri Project by Ashwin Sheth Group is a luxurious residential development in Thane West. The project is located off the Eastern Express Highway, next to Utsav Hotel, and is just a minute away from Viviana Mall. Ashwin Sheth Group is a renowned real estate developer known for its commitment to quality and delivering exceptional projects. The location of the project in Thane West offers convenience and accessibility. It is situated near major transportation routes like the Eastern Express Highway and is in close proximity to Viviana Mall, a popular shopping destination in the area. The project is spread across 3.5 acres and consists of 3 towers. Each tower has a structure of ground floor plus 4 levels of podium car park and 28 storeys. The project offers different types of homes, including 2 BHK smart, 2 BHK standard, and spacious 3 BHK apartments. Each floor has 4 flats, ensuring lower density for a more comfortable living experience. The project provides more than 40 amenities for residents to enjoy and explore. t offers a variety of well-designed homes, stunning views, and a range of amenities. Tower - A&B - December 2024, C&D - December 2023, E&F - April 2024.
Sheth Zuri QR Code
Sheth Zuri
MahaRERA - P51700007274

Godrej Emerald

₹ 1.05 Crs. onwards
Thane West
1½/2/3 BHK apartments
View Details

Kalpataru Paramount

₹ 99 Lacs. onwards
Thane West
2 BHK apartments
View Details

Orovia-Commercials

₹ 2.16 Crs. onwards
Thane West
Office BHK apartments
View Details

Godrej Exquisite

₹ 1.15 Crs. onwards
Thane West
1/2/3 BHK apartments
View Details

Kalpataru Parkcity

₹ 84.89 Lacs. onwards
Thane West
2 BHK apartments
View Details

Sheth Cnergy

₹ 1.67 Crs. onwards
Thane West
Office BHK apartments
View Details

Godrej Upavan

₹ 67.07 Lacs. onwards
Thane West
2 BHK apartments
View Details

Victoria Towers

₹ 3.59 Crs. onwards
Thane West
3/4/5 BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    Sheth Zuri
  • Location:
  • Thane West, Besides Viviana Mall,Eastern Express Highway
  • Const. Stage:
    Ready Possession
  • Possession:
  • Parking:
    Open
  • Floors:
    28
Developer Details

  • Developer:
    Ashwin Sheth Group
  • Phone:
  • Website:
    www.ashwinshethgroup.com
  • Address:
  • Sheth Group of Companies Ground & 3rd Floor, Prius Infinity, Behind Garware House,Paranjape B Scheme, Subhash Road, Vile Parle East, Mumbai - 400 057.
Project Ratings
Project Brochures
Brochures of Sheth Zuriby Ashwin Sheth Group
Project Brochures
  • MPE/Brochures/20296/Sheth Zuri Brochure.pdf
Project Amenities
Amenities offred in Sheth Zuri
LIFESTYLE AMENITIES
Swimming PoolHealth ClubGymnasiumHigh speed elevatorsKid's play areaIndoor GamesPower BackupVitrified flooringPOP finished wallsIntercom/CCTVGranite PlatformModular Kitchen
Project RERA Details
RERA Project Status New
Proposed Possession 30 Dec 2024
Revised Possession 30 Dec 2024
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51700007274
RERA Project Name Sheth Zuri
RERA Location Out Of Survey No 85/1P, 81/1A, 83/2, 83/5, 85/2, 85/3, 85/4P, 85/5
RERA Developer Sheth Developers Private Limited
Project RERA Details
Project Type Residential / Group Housing
Funding Bank SBM BANK INDIA LIMITED
Last Modified 24 Apr 2025
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Thane West

Facilities & Amenities
Facilities, Amenities & Common areas details of Sheth Zurilast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Shall Be Done Before Oc Of Last Building In Layout
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Substation
Energy management
Solar Panels
Fire Protection And Fire Safety Requirements20% completed
20% Complete
As Per Cfo Noc
GYMNASIUM SWIMMING POOL AND OTHER RECREATION FACILITIES
Shall Be Done Prior To Oc Of Last Bldg In Layout
Landscaping & Tree Planting
Shall Be Done Before Oc Of Last Building In Layout
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)50% completed
50% Complete
Pr0vision Of Stp
Solid Waste Management And Disposal
Shall Be Done Before Oc Of Last Building In Layout
Storm Water Drains
Shall Be Done Before Oc Of Last Building In Layout
Street Lighting
Shall Be Done Before Oc Of Last Building In Layout
Treatment And Disposal Of Sewage And Sullage Water
Provision Of Stp
Water Conservation, Rain water Harvesting
Shall Be Done Prior To Oc
Water Supply
As Per Tmc Water Supply
Buildings / Wings in Sheth Zuri
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sheth Zuriby Ashwin Sheth Grouplast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

97938 Sq. ft.

Project Area

16783 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

717 apartments in total
Total
717
Booked
678
Available
39

Saleable Area Statistics (Sq. ft.)

405892 Total
Total
405892
Booked
386438
Available
19455
Total 717 apartments in project. 678 apartments booked. 94% apartments booked.
Total 37708.32 saleable area. 35900.93 apartments booked.
95% area booked.

Tower 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 1Dec 20232811150262
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK37.23 Sq.mts. ( 401 Sq.ft. )114
91 Booked79% Booked
79% Booked
2 BHK57.1 Sq.mts. ( 615 Sq.ft. )60
53 Booked88% Booked
88% Booked
2 BHK59.48 Sq.mts. ( 640 Sq.ft. )60
57 Booked95% Booked
95% Booked
Shop66.84 Sq.mts. ( 719 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop53.62 Sq.mts. ( 577 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop26.5 Sq.mts. ( 285 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop32.3 Sq.mts. ( 348 Sq.ft. )2
2 Booked100% Booked
100% Booked
241 total apartments / 208 apartments booked. 86% apartments booked.
Work Description in Building Tower 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked

Tower 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 2Dec 20232811150255
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK44.93 Sq.mts. ( 484 Sq.ft. )122
122 Booked100% Booked
100% Booked
2 BHK46.08 Sq.mts. ( 496 Sq.ft. )116
116 Booked100% Booked
100% Booked
238 total apartments / 238 apartments booked. 100% apartments booked.
Work Description in Building Tower 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress42% done
42% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked

Tower 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 3Dec 20232811150389
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK57.81 Sq.mts. ( 622 Sq.ft. )116
112 Booked96% Booked
96% Booked
3 BHK70.86 Sq.mts. ( 763 Sq.ft. )122
120 Booked98% Booked
98% Booked
238 total apartments / 232 apartments booked. 97% apartments booked.
Work Description in Building Tower 3Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress36% done
36% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress75% done
75% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
Project Consultants
Channel Partners Registered by Developer
Ashwin Sheth Group
for Project
Sheth Zuri
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Ashwin Sheth Group