• Rating:
  • ()

This project is no longer available in our database.
Please use the adjoining search tools to find similar propjects.

-

Project Details, Configuration & Prices
Project overview
with BHK apartments / Flats starting from N/A onwards

Godrej Emerald

₹ 1.05 Crs. onwards
Thane West
1½/2/3 BHK apartments
View Details

Kalpataru Paramount

₹ 99 Lacs. onwards
Thane West
2 BHK apartments
View Details

Orovia-Commercials

₹ 2.16 Crs. onwards
Thane West
Office BHK apartments
View Details

Godrej Exquisite

₹ 1.15 Crs. onwards
Thane West
1/2/3 BHK apartments
View Details

Kalpataru Parkcity

₹ 84.89 Lacs. onwards
Thane West
2 BHK apartments
View Details

Sheth Cnergy

₹ 1.67 Crs. onwards
Thane West
Office BHK apartments
View Details

Godrej Upavan

₹ 67.07 Lacs. onwards
Thane West
2 BHK apartments
View Details

Victoria Towers

₹ 3.59 Crs. onwards
Thane West
3/4/5 BHK apartments
View Details
Project Details
  • Project:
  • Location:
  • ,
  • Const. Stage:
  • Possession:
  • Parking:
  • Floors:
Developer Details

jyoti industries

  • Developer:
  • Phone:
  • Website:
  • Address:
Project Ratings
Project Brochures
Brochures of by
Project Brochures
Project Amenities
Amenities offred in
Project RERA Details
RERA Project Status New Project
Proposed Possession 30 Dec 2024
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51700015369
RERA Project Name Mumbra Landmark
RERA Location Mumbra, 400612, Thane, Amrut Nagar, Mumbai-Pune Road
RERA Developer Jyoti Industries
Project RERA Details
Project Type Residential
Funding Bank AXIS BANK LTD
Last Modified 01 Feb 2022
Last Retrived 28 Jul 2025

Most active Channel Partners, Real Estate Agents in

Facilities & Amenities
Facilities, Amenities & Common areas details of last updated on 28 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
R.G. Area Will Be Landscaped
Community Buildings
Campus Lighting
Electrical Meter Room, Sub-Station, Receiving Station
Electrical Meter Room Will Be Provided
Energy management
Solar Water Heating System Will Be Provided
Fire Protection And Fire Safety Requirements
Solar Water Heating System Will Be Provided
Landscaping & Tree Planting
Basic Landscaping With Clubhouse
Open Parking
R.G. Area Will Be Landscaped
Sewerage (Chamber, Lines, Septic Tank , STP)
Will Be Connected To Tmc Sewer Line
Solid Waste Management And Disposal
As Per Tmc Norms
Storm Water Drains
Discharge Towards Tmc Storm Water Drains
Street Lighting
Campus Lighting
Treatment And Disposal Of Sewage And Sullage Water
As Per Tmc Norms
Water Conservation, Rain water Harvesting
Bore Well Recharging With Filtration Pits
Water Supply
Will Be Connected To Tmc Water Supply Line
Buildings / Wings in
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of by last updated on 28 Jul 2025 as per information obtained from MARA RERA. Disclaimer

32292 Sq. ft.

Project Area

3977 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

83 apartments in total
Total
83
Booked
7
Available
76

Saleable Area Statistics (Sq. ft.)

38678 Total
Total
38678
Booked
4489
Available
34189
Total 83 apartments in project. 7 apartments booked. 8% apartments booked.
Total 3593.27 saleable area. 417.03 apartments booked.
12% area booked.

Building A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building ADec 202381010029
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK37.87 Sq.mts. ( 408 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK38.7 Sq.mts. ( 417 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK50.76 Sq.mts. ( 546 Sq.ft. )7
1 BHK52.11 Sq.mts. ( 561 Sq.ft. )7
1 RK35.13 Sq.mts. ( 378 Sq.ft. )1
None Booked0% Booked
0% Booked
1 RK35.67 Sq.mts. ( 384 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK50.73 Sq.mts. ( 546 Sq.ft. )7
None Booked0% Booked
0% Booked
31 total apartments / 2 apartments booked. 6% apartments booked.
Work Description in Building Building ACompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress20% done
20% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress80% done
80% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress74% done
74% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress80% done
80% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress80% done
80% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress80% done
80% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building BDec 20238101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.31 Sq.mts. ( 380 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK36.07 Sq.mts. ( 388 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK36.19 Sq.mts. ( 390 Sq.ft. )7
1 BHK36.95 Sq.mts. ( 398 Sq.ft. )7
1 RK33.31 Sq.mts. ( 359 Sq.ft. )1
None Booked0% Booked
0% Booked
1 RK34.27 Sq.mts. ( 369 Sq.ft. )7
None Booked0% Booked
0% Booked
2 BHK52.12 Sq.mts. ( 561 Sq.ft. )7
2 Booked28% Booked
28% Booked
31 total apartments / 4 apartments booked. 12% apartments booked.
Work Description in Building Building BCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress20% done
20% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress80% done
80% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress60% done
60% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress75% done
75% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress80% done
80% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building CDec 20237111001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 RK30.47 Sq.mts. ( 328 Sq.ft. )2
None Booked0% Booked
0% Booked
1 RK30.91 Sq.mts. ( 333 Sq.ft. )2
None Booked0% Booked
0% Booked
1 RK31.31 Sq.mts. ( 337 Sq.ft. )4
None Booked0% Booked
0% Booked
AMINITY AREA TO TMC145.71 Sq.mts. ( 1568 Sq.ft. )1
None Booked0% Booked
0% Booked
CONSULTING ROOM24.38 Sq.mts. ( 262 Sq.ft. )3
None Booked0% Booked
0% Booked
EXAMINATION ROOM24.93 Sq.mts. ( 268 Sq.ft. )2
None Booked0% Booked
0% Booked
EXAMINATION ROOM35.17 Sq.mts. ( 379 Sq.ft. )1
None Booked0% Booked
0% Booked
GENERAL WARD62.5 Sq.mts. ( 673 Sq.ft. )1
None Booked0% Booked
0% Booked
GENTS LADIES WARD62.5 Sq.mts. ( 673 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP136.78 Sq.mts. ( 1472 Sq.ft. )1
1 Booked100% Booked
100% Booked
SPECIAL ROOM TO TMC20.47 Sq.mts. ( 220 Sq.ft. )2
None Booked0% Booked
0% Booked
21 total apartments / 1 apartments booked. 4% apartments booked.
Work Description in Building Building CCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress21% done
21% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Project Consultants
Channel Partners Registered by Developer
for Project
Mumbra Landmark
last updated on 28 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation