Godrej Nirvaan Project at Thane West by Godrej Properties (P51700022148)
  • Rating: 5.0
  • (205)

Godrej Nirvaan - Thane West

Godrej Properties
Project Details, Configuration & Prices
1 BHK419 Sq.ft. Carpet ₹ 45.99 Lacs Onwards
Project overview
Godrej Nirvaan Project at Thane West by Godrej Properties (P51700022148) a Sold Out Project with 1 BHK apartments / Flats starting from ₹ 45.99 Lakh onwards

Godrej Nirvaan is a Residential Project Developed by the renowned real estate developer Godrej Properties. It is located at Thane West. Thane West is well-connected to Mumbai and other parts of the MMR through various transportation modes. The Eastern Express Highway and the Thane-Belapur Road are major roadways that connect Thane to different parts of Mumbai and Navi Mumbai. Just 20 minutes from Majiwada Circle and the green stretches of Ghodbunder Road. 1 minute rom the metro station and 2 minutes from Samruddhi Highway. Close proximity to the social infrastructure. 20.4 Acres of land parcel with 12 towers (6 Towers Nirvaan + 6 Upavan). Nirvaan : S+ 25 Storey and Upavan : S+ 31 Storey. It offers 1 and 2 BHK Residences. Low density, High rise project. 2 Club House of 15000 Sq Feet Each. 50+ Amenities, swim, club, gym, concierge service and many more.
Godrej Nirvaan QR Code
Godrej Nirvaan
MahaRERA - P51700022148

Godrej Emerald

₹ 1.05 Crs. onwards
Thane West
1½/2/3 BHK apartments
View Details

Kalpataru Paramount

₹ 99 Lacs. onwards
Thane West
2 BHK apartments
View Details

Orovia-Commercials

₹ 2.16 Crs. onwards
Thane West
Office BHK apartments
View Details

Godrej Exquisite

₹ 1.15 Crs. onwards
Thane West
1/2/3 BHK apartments
View Details

Kalpataru Parkcity

₹ 84.89 Lacs. onwards
Thane West
2 BHK apartments
View Details

Sheth Cnergy

₹ 1.67 Crs. onwards
Thane West
Office BHK apartments
View Details

Godrej Upavan

₹ 67.07 Lacs. onwards
Thane West
2 BHK apartments
View Details

Victoria Towers

₹ 3.59 Crs. onwards
Thane West
3/4/5 BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    Godrej Nirvaan
  • Location:
  • Thane West, Kalyan
  • Const. Stage:
    Sold Out
  • Possession:
    Dec 2024
  • Parking:
    Stilt
  • Floors:
    25
Developer Details

Godrej Properties

  • Developer:
    Godrej Properties
  • Phone:
  • Website:
    www.godrejproperties.com
  • Address:
  • Unit No 5C, 5th Floor, Godrej One, Pirojshanagar, Vikhroli East, Mumbai - 400 079.
Project Ratings
Project Brochures
Brochures of Godrej Nirvaanby Godrej Properties
Project Brochures
  • MPE/Brochures/25076/Godrej Nirvaan Mini Booklet.pdf
  • MPE/Brochures/25076/Godrej Nirvaan Brochure .pdf
Project Amenities
Amenities offred in Godrej Nirvaan
LIFESTYLE AMENITIES
Power BackupOutdoor GamesIndoor GamesAir Conditioned LobbyBusiness CentreRecreationKid's play areaBalconyLandscaped gardenJogging TrackHigh speed elevatorsGrand entrance lobbyGymnasiumHealth ClubClub HouseIntercom/CCTVAir ConditionersPOP finished wallsImported Sanitary FittingsVitrified flooringDry AreasPiped GasKitchen CabinetsModular KitchenGranite PlatformSecurity Help DeskReception DeskMassage RoomConcierge ServicesPet Area
Project RERA Details
RERA Project Status New
Proposed Possession 30 Dec 2024
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51700022148
RERA Project Name Godrej Nirvaan
RERA Location 45/1,45/3/1 Pt,45/3/2, 45/2/1 Pt,45/2/2,45/4 Pt,45/5, 45/6,45/9 Pt,45/12, 40/3 Pt,40/4 Pt, 40/7 Pt,40/8 Pt,58/6,58/7/1 Pt,58/7/2 Pt,58/11, 58/12 Pt,58/14 Pt, 58/17 Pt,58/19, 58/20 Pt,58/21 Pt, 83/4 Pt,83/7 Pt,128/3 Pt,
RERA Developer Prakhhyat Dwellings Llp
Project RERA Details
Project Type Residential / Group Housing
Funding Bank HDFC BANK
Last Modified 28 Aug 2019
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Thane West

Facilities & Amenities
Facilities, Amenities & Common areas details of Godrej Nirvaanlast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space80% completed
80% Complete
As Per Approved Plan
Community Buildings45% completed
45% Complete
Clubhouse Provided
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
As Per Approved Plan
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
1
Landscaping & Tree Planting50% completed
50% Complete
As Per Approved Plan
MULTILEVEL CAR PARKING100% completed
95% Complete
As Per Approved Plan
Open Parking100% completed
95% Complete
As Per Approved Plan
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
As Per Design
Solid Waste Management And Disposal100% completed
95% Complete
Provision Of Owc
Storm Water Drains100% completed
95% Complete
As Per Design
Street Lighting100% completed
95% Complete
Only For Internal Road And Footpath
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Stp Provided
Water Conservation, Rain water Harvesting95% completed
95% Complete
Rain Water Harvesting As Per Design.
Water Supply95% completed
95% Complete
Bncmc
Buildings / Wings in Godrej Nirvaan
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Godrej Nirvaanby Godrej Propertieslast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

340522 Sq. ft.

Project Area

89603 Sq. ft.

Recreational Open Space

Total 11

Wings / Towers in Project

Apartments Statistics

1176 apartments in total
Total
1176
Booked
986
Available
190

Saleable Area Statistics (Sq. ft.)

585161 Total
Total
585161
Booked
477610
Available
107551
Total 1176 apartments in project. 986 apartments booked. 83% apartments booked.
Total 54362.8 saleable area. 44371.04 apartments booked.
82% area booked.

Araha - Tower 5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Araha - Tower 5Dec 20242610102240
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 LUXE39.44 Sq.mts. ( 425 Sq.ft. )100
82 Booked82% Booked
82% Booked
2 LUXE58.25 Sq.mts. ( 627 Sq.ft. )46
25 Booked54% Booked
54% Booked
2 LUXE58.7 Sq.mts. ( 632 Sq.ft. )25
10 Booked40% Booked
40% Booked
2 LUXE58.89 Sq.mts. ( 634 Sq.ft. )25
19 Booked76% Booked
76% Booked
196 total apartments / 136 apartments booked. 69% apartments booked.
Work Description in Building Araha - Tower 5Completion

Reva - Tower 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Reva - Tower 1Dec 20242610102240
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 PREMIUM37.84 Sq.mts. ( 407 Sq.ft. )96
93 Booked96% Booked
96% Booked
1 PREMIUM38.02 Sq.mts. ( 409 Sq.ft. )100
97 Booked97% Booked
97% Booked
196 total apartments / 190 apartments booked. 96% apartments booked.
Work Description in Building Reva - Tower 1Completion

Rivan - Tower 6

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rivan - Tower 6Dec 20242610102240
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 LUXE39.44 Sq.mts. ( 425 Sq.ft. )100
90 Booked90% Booked
90% Booked
2 LUXE58.25 Sq.mts. ( 627 Sq.ft. )46
35 Booked76% Booked
76% Booked
2 LUXE58.7 Sq.mts. ( 632 Sq.ft. )25
21 Booked84% Booked
84% Booked
2 LUXE58.89 Sq.mts. ( 634 Sq.ft. )25
12 Booked48% Booked
48% Booked
196 total apartments / 158 apartments booked. 80% apartments booked.
Work Description in Building Rivan - Tower 6Completion

TOWER 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
TOWER 1
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Work Description in Building TOWER 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress50% done
50% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress80% done
80% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress96% done
96% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

TOWER 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
TOWER 2
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Work Description in Building TOWER 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

Tower 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 3Dec 20242610102240
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 PREMIUM A38.02 Sq.mts. ( 409 Sq.ft. )100
99 Booked99% Booked
99% Booked
1 PREMIUM B37.84 Sq.mts. ( 407 Sq.ft. )96
94 Booked97% Booked
97% Booked
196 total apartments / 193 apartments booked. 98% apartments booked.
Work Description in Building Tower 3Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress50% done
50% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress80% done
80% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress96% done
96% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

TOWER 4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
TOWER 4
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Work Description in Building TOWER 4Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

TOWER 5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
TOWER 5
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Work Description in Building TOWER 5Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

TOWER 6

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
TOWER 6
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Work Description in Building TOWER 6Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

Udyat - Tower 4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Udyat - Tower 4Dec 20242610102240
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 LUXE39.44 Sq.mts. ( 425 Sq.ft. )100
84 Booked84% Booked
84% Booked
2 LUXE58.25 Sq.mts. ( 627 Sq.ft. )46
31 Booked67% Booked
67% Booked
2 LUXE58.7 Sq.mts. ( 632 Sq.ft. )25
8 Booked32% Booked
32% Booked
2 LUXE58.89 Sq.mts. ( 634 Sq.ft. )25
19 Booked76% Booked
76% Booked
196 total apartments / 142 apartments booked. 72% apartments booked.
Work Description in Building Udyat - Tower 4Completion

Vega - Tower 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Vega - Tower 2Dec 20242610102240
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 PREMIUM53.63 Sq.mts. ( 577 Sq.ft. )100
83 Booked83% Booked
83% Booked
2 PREMIUM56.62 Sq.mts. ( 609 Sq.ft. )21
20 Booked95% Booked
95% Booked
2 PREMIUM56.69 Sq.mts. ( 610 Sq.ft. )75
64 Booked85% Booked
85% Booked
196 total apartments / 167 apartments booked. 85% apartments booked.
Work Description in Building Vega - Tower 2Completion
Project Consultants
Channel Partners Registered by Developer
Godrej Properties
for Project
Godrej Nirvaan
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Godrej Properties

Godrej Properties Godrej Properties brings the Godrej Group philosophy of innovation, sustainability and excellence to the real estate industry. Each Godrej Properties development combines a 119–year legacy of excellence and trust with a commitment to cutting-edge design and technology. Godrej Properties is currently developing residential, commercial and township projects spread across approximately 11.89 million square meters in 12 cities. In the last 3 years, Godrej Properties has received over 150 awards and recognitions, including the "Real Estate Company Of The Year" at the Construction Week India Awards 2015, ‘Golden Peacock Award for Sustainability’ for the year 2015 by Institute Of Directors (IOD), "Most Reliable Builder for 2014" at the CNBC AWAAZ Real Estate Awards 2014, “Innovation Leader in Real Estate” award at the NDTV Property Awards 2014 and “Popular Choice - Developer of the Year” award by ET NOW in 2013.