• Rating: 4.0
  • (152)

This project is no longer available in our database.
Please use the adjoining search tools to find similar propjects.

-

Project Details, Configuration & Prices
Project overview
with BHK apartments / Flats starting from N/A onwards

Godrej Emerald

₹ 1.05 Crs. onwards
Thane West
1½/2/3 BHK apartments
View Details

Kalpataru Paramount

₹ 99 Lacs. onwards
Thane West
2 BHK apartments
View Details

Orovia-Commercials

₹ 2.16 Crs. onwards
Thane West
Office BHK apartments
View Details

Godrej Exquisite

₹ 1.15 Crs. onwards
Thane West
1/2/3 BHK apartments
View Details

Kalpataru Parkcity

₹ 84.89 Lacs. onwards
Thane West
2 BHK apartments
View Details

Sheth Cnergy

₹ 1.67 Crs. onwards
Thane West
Office BHK apartments
View Details

Godrej Upavan

₹ 67.07 Lacs. onwards
Thane West
2 BHK apartments
View Details

Victoria Towers

₹ 3.59 Crs. onwards
Thane West
3/4/5 BHK apartments
View Details
Project Details
  • Project:
  • Location:
  • ,
  • Const. Stage:
  • Possession:
  • Parking:
  • Floors:
Developer Details

cosmos group

  • Developer:
  • Phone:
  • Website:
  • Address:
Project Ratings
Project Brochures
Brochures of by
Project Brochures
Project Amenities
Amenities offred in
LIFESTYLE AMENITIES
Power BackupOutdoor GamesIndoor GamesAir Conditioned LobbyLandscaped gardenHigh speed elevatorsGrand entrance lobbyGymnasiumPOP finished wallsImported Sanitary FittingsGranite PlatformSecurity Help DeskReception Desk
Project RERA Details
RERA Project Status New
Proposed Possession 30 Mar 2024
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51700017557
RERA Project Name Cosmos Horizon Phase Ii
RERA Location 192/2A, 192/2B,193/2B,194/3B
RERA Developer Concorde Developers
Architect Suvarna Ghosh
Project RERA Details
Project Type Residential / Group Housing
Funding Bank AXIS BANK
Last Modified 28 Aug 2018
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in

Facilities & Amenities
Facilities, Amenities & Common areas details of last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
To Be Completed Before Oc
Community Buildings100% completed
95% Complete
Club House
Electrical Meter Room, Sub-Station, Receiving Station
Only Electric Meter Room &Amp; Completed Before Oc
Energy management
Only Solar Water Heater &Amp; Dg Set To Be Provided &Amp;
Fire Protection And Fire Safety Requirements
To Be Completed Before Oc
Landscaping & Tree Planting
To Be Planted Before Oc
Open Parking
-
Sewerage (Chamber, Lines, Septic Tank , STP)
To Be Completed Before Oc
Solid Waste Management And Disposal
To Be Completed Before Oc
Storm Water Drains
To Be Completed Before Oc
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
To Be Completed Before Oc
Water Conservation, Rain water Harvesting
Only Rain Water Harvesting To Be Provided &Amp; Complt
Water Supply
To Be Completed Before Oc
Buildings / Wings in
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of by last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

5130 Sq. ft.

Project Area

51023 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

224 apartments in total
Total
224
Booked
173
Available
51

Saleable Area Statistics (Sq. ft.)

188997 Total
Total
188997
Booked
145584
Available
43412
Total 224 apartments in project. 173 apartments booked. 77% apartments booked.
Total 17558.24 saleable area. 13525.13 apartments booked.
77% area booked.

Building 5 Sunlite

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 5 SunliteDec 20222811107167
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK65.46 Sq.mts. ( 705 Sq.ft. )28
16 Booked57% Booked
57% Booked
2 BHK TYPE165.46 Sq.mts. ( 705 Sq.ft. )28
26 Booked92% Booked
92% Booked
3 BHK91.01 Sq.mts. ( 980 Sq.ft. )28
20 Booked71% Booked
71% Booked
3 BHK TYPE191.61 Sq.mts. ( 986 Sq.ft. )28
26 Booked92% Booked
92% Booked
112 total apartments / 88 apartments booked. 78% apartments booked.
Work Description in Building Building 5 SunliteCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building 6 Moonlite

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 6 MoonliteDec 202228111071
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK65.46 Sq.mts. ( 705 Sq.ft. )28
25 Booked89% Booked
89% Booked
2 BHK TYPE165.46 Sq.mts. ( 705 Sq.ft. )28
21 Booked75% Booked
75% Booked
3 BHK91.01 Sq.mts. ( 980 Sq.ft. )28
17 Booked60% Booked
60% Booked
3 BHK TYPE191.61 Sq.mts. ( 986 Sq.ft. )28
22 Booked78% Booked
78% Booked
112 total apartments / 85 apartments booked. 75% apartments booked.
Work Description in Building Building 6 MoonliteCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Project Consultants
Channel Partners Registered by Developer
for Project
Cosmos Horizon Phase Ii
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation