Tulsi Aadvik Project at Badlapur by Raj Group (P51700015302)
  • Rating:
  • ()

Tulsi Aadvik - Badlapur

Raj Group
Project Details, Configuration & Prices
1 BHK385 Sq.ft. Carpet ₹ 25.07 Lacs
2 BHK570 Sq.ft. Carpet ₹ 35.26 Lacs
Project overview
Tulsi Aadvik Project at Badlapur by Raj Group (P51700015302) is a Ready Possession Project with 1/2 BHK apartments / Flats starting from ₹ 25.07 Lakh onwards

Tulsi Aadvik is a Residential Project Developed by the Raj Group. It is located at Badlapur East. Badlapur East is located about 70 kilometers from Mumbai, making it one of the distant suburbs of the city. It is situated in the Thane district, and it's well-connected to Mumbai through the Central Railway's suburban train network. Badlapur’s Biggest Township. Just 5 mins drive from Badlapur station. Highway Touch Project. Near – Schools / Hospitals / Petrol Pump / DMart. Commercial within Project. It is a 7 storey tower. The Project offers 1 and 2 BHK Residences with all modern amenities. Badlapur’s Biggest Clubhouse spread over 40,000 sq.ft. Explore the best of amenities in Affordable Housing Township. RERA approved project.
Tulsi Aadvik QR Code
Tulsi Aadvik
MahaRERA - P51700015302

Tulsi Aawas

₹ 25.07 Lacs. onwards
Badlapur
1/2 BHK apartments
View Details

Thanekar Civic

₹ 17.99 Lacs. onwards
Badlapur
1/1 RK/2 BHK apartments
View Details

Thanekar Palacio

₹ 32.5 Lacs. onwards
Badlapur
1/2/3 BHK apartments
View Details

Thanekar Palacio - Phase 2

₹ 49.48 Lacs. onwards
Badlapur
2/3 BHK apartments
View Details

Ananta Pride

₹ 20.65 Lacs. onwards
Badlapur
1 BHK apartments
View Details

Tulsi Galaxy

₹ 21.99 Lacs. onwards
Badlapur
1/2 BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    Tulsi Aadvik
  • Location:
  • Badlapur, Kharvai, Opp. Gaav Devi Mandir
  • Const. Stage:
    Ready Possession
  • Possession:
  • Floors:
    7
Developer Details

Raj Group

  • Developer:
    Raj Group
  • Phone:
  • Website:
    www.raj-group.co
  • Address:
  • Opp.gaav devi mandir ,kharvai near essar petrol puml badlapur east
Project Ratings
Project Brochures
Brochures of Tulsi Aadvikby Raj Group
Project Brochures
  • MPE/Brochures/30614/Tulsi Aadvik Brochure.pdf
Project Amenities
Amenities offred in Tulsi Aadvik
LIFESTYLE AMENITIES
Power BackupOutdoor GamesTempleKid's play areaHigh speed elevatorsGrand entrance lobbyGymnasiumClub HouseSwimming PoolIntercom/CCTVVideo Door PhonesAluminium Sliding WindowsPOP finished wallsImported Sanitary FittingsConcealed PlumbingConcealed WiringMarble flooringVitrified flooringGranite PlatformSecurity Help DeskMulti Purpose Hall
Project RERA Details
RERA Project Status New
Proposed Possession 30 Mar 2022
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51700015302
RERA Project Name Tulsi Aadvik
RERA Location Survey No.40 Hissa No.1, Survey No. 41 Hissa No. 1, Survey No.41 Hissa No.2/1
RERA Developer Raj Group
Architect S R Khambayat Partner Of Raj Associates
Project RERA Details
Project Type Others
Funding Bank BANK OF BARODA
Last Modified 15 Feb 2018
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Badlapur

Facilities & Amenities
Facilities, Amenities & Common areas details of Tulsi Aadviklast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Total 1365 Sq Mtr
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Separate Meter Room/Space Will Be Provided
Energy management
Na
Fire Protection And Fire Safety Requirements
Fire Safety Measures Will Be Installed
Landscaping & Tree Planting
Trees Will Be Planted
NA
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Only Septic Tank
Solid Waste Management And Disposal
Na
Storm Water Drains
Provision For Storm Water Drains
Street Lighting
Street Lighting Will Be Instatlled
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Provision For Rain Water Harvesting
Water Supply
Water Connection Will Be Provided After Oc
Buildings / Wings in Tulsi Aadvik
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Tulsi Aadvikby Raj Grouplast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

146929 Sq. ft.

Project Area

14693 Sq. ft.

Recreational Open Space

Total 6

Wings / Towers in Project

Apartments Statistics

377 apartments in total
Total
377
Booked
0
Available
377

Saleable Area Statistics (Sq. ft.)

125067 Total
Total
125067
Booked
0
Available
125067
Total 377 apartments in project. 0 apartments booked. 0% apartments booked.
Total 11618.98 saleable area. 0 apartments booked.
0% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingMar 202181010021
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK FLAT28.31 Sq.mts. ( 305 Sq.ft. )34
None Booked0% Booked
0% Booked
1 BHK FLAT30.04 Sq.mts. ( 323 Sq.ft. )21
None Booked0% Booked
0% Booked
1 BHK FLAT30.76 Sq.mts. ( 331 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK FLAT32.45 Sq.mts. ( 349 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK FLAT36.97 Sq.mts. ( 398 Sq.ft. )7
None Booked0% Booked
0% Booked
2 BHK FLAT37.7 Sq.mts. ( 406 Sq.ft. )13
None Booked0% Booked
0% Booked
2 BHK FLAT38.58 Sq.mts. ( 415 Sq.ft. )6
None Booked0% Booked
0% Booked
SHOP11.2 Sq.mts. ( 121 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP12.87 Sq.mts. ( 139 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP13.95 Sq.mts. ( 150 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP14.96 Sq.mts. ( 161 Sq.ft. )3
None Booked0% Booked
0% Booked
SHOP15.66 Sq.mts. ( 169 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP18.4 Sq.mts. ( 198 Sq.ft. )5
None Booked0% Booked
0% Booked
97 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress30% done
30% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress60% done
60% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress60% done
60% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress62% done
62% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress20% done
20% Booked
Sanitary Fittings within the flats / premises
work-in-progress20% done
20% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress30% done
30% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingMar 202181010018
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK FLAT28.31 Sq.mts. ( 305 Sq.ft. )14
None Booked0% Booked
0% Booked
1 BHK FLAT30.04 Sq.mts. ( 323 Sq.ft. )14
None Booked0% Booked
0% Booked
1 BHK FLAT30.49 Sq.mts. ( 328 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK FLAT32.45 Sq.mts. ( 349 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK FLAT36.53 Sq.mts. ( 393 Sq.ft. )6
None Booked0% Booked
0% Booked
2 BHK FLAT40.23 Sq.mts. ( 433 Sq.ft. )6
None Booked0% Booked
0% Booked
42 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress30% done
30% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress50% done
50% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress59% done
59% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress30% done
30% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C WingMar 202181010022
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK FLAT28.31 Sq.mts. ( 305 Sq.ft. )21
None Booked0% Booked
0% Booked
1 BHK FLAT30.04 Sq.mts. ( 323 Sq.ft. )28
None Booked0% Booked
0% Booked
1 BHK FLAT30.76 Sq.mts. ( 331 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK FLAT37.7 Sq.mts. ( 406 Sq.ft. )6
None Booked0% Booked
0% Booked
56 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress30% done
30% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress50% done
50% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress59% done
59% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress30% done
30% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

D Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D WingMar 202181010024
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK FLAT28.31 Sq.mts. ( 305 Sq.ft. )21
None Booked0% Booked
0% Booked
1 BHK FLAT30.04 Sq.mts. ( 323 Sq.ft. )14
None Booked0% Booked
0% Booked
1 BHK FLAT30.09 Sq.mts. ( 324 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK FLAT30.76 Sq.mts. ( 331 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK FLAT36.9 Sq.mts. ( 397 Sq.ft. )6
None Booked0% Booked
0% Booked
2 BHK FLAT38.17 Sq.mts. ( 411 Sq.ft. )6
None Booked0% Booked
0% Booked
2 BHK FLAT39.39 Sq.mts. ( 424 Sq.ft. )7
None Booked0% Booked
0% Booked
56 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building D WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress30% done
30% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress50% done
50% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress59% done
59% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress30% done
30% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

E Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E WingMar 202181010024
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK FLAT28.31 Sq.mts. ( 305 Sq.ft. )21
None Booked0% Booked
0% Booked
1 BHK FLAT30.04 Sq.mts. ( 323 Sq.ft. )21
None Booked0% Booked
0% Booked
2 BHK FLAT38.55 Sq.mts. ( 415 Sq.ft. )14
None Booked0% Booked
0% Booked
56 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress30% done
30% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress60% done
60% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress60% done
60% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress60% done
60% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress30% done
30% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

F Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
F WingMar 202181010028
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK FLAT28.31 Sq.mts. ( 305 Sq.ft. )28
None Booked0% Booked
0% Booked
1 BHK FLAT30.04 Sq.mts. ( 323 Sq.ft. )28
None Booked0% Booked
0% Booked
1 BHK FLAT30.76 Sq.mts. ( 331 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK FLAT37.7 Sq.mts. ( 406 Sq.ft. )12
None Booked0% Booked
0% Booked
70 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building F WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress30% done
30% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress80% done
80% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress80% done
80% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress62% done
62% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress30% done
30% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Project Consultants
Channel Partners Registered by Developer
Raj Group
for Project
Tulsi Aadvik
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Raj Group

Raj Group