Thanekar Palacio - Phase 2 Project at Badlapur by Thanekar Group (P51700051381)
  • Rating:
  • ()

Thanekar Palacio - Phase 2 - Badlapur

Thanekar Group
Project Details, Configuration & Prices
2 BHK630 Sq.ft. Carpet ₹ 41 Lacs ++
3 BHK1000 Sq.ft. Carpet ₹ 51 Lacs ++
Project overview
Thanekar Palacio - Phase 2 Project at Badlapur by Thanekar Group (P51700051381) is a RERA approved Under Construction Project with RERA ID P51700051381 slated to be ready for possession by Dec 2026 with 2/3 BHK apartments / Flats starting from ₹ 49.48 Lakh onwards

Introducing Thanekar Palacio Phase 2 - Where Luxury Meets Sustainability! Uniqueness: Uninterrupted Water Supply: Enjoy 24-hour water supply from MIDC. Eco-Friendly Initiatives: Solar panels atop the tower provide common electricity, reducing our carbon footprint. EV Charging Points: Embrace the future with electric vehicle charging points in the parking area. Sample Flat Ready: Visit our office to explore a fully furnished sample flat, showcasing the epitome of elegance. Largest Reliance Smart: Convenience at your doorstep with a sprawling 36,000 sq ft Reliance Smart on the ground floor. Amenities: Kids' Playzones: Delight your little ones with a vast outdoor play area and an indoor entertainment zone with games. Multipurpose Hall: Host various functions within the complex in our versatile multipurpose hall. Sports Enthusiasts' Paradise: Enjoy sports to the fullest with a multipurpose sports area and a cricket ground featuring a full-sized pitch. Health & Wellness: Stay fit with a gym overlooking the swimming pool and an open-air yoga space. Social Spaces: Connect with like-minded individuals through exclusive clubhouses, indoor games rooms, gazebos, and sit-outs. Night Play: Indulge in evening games on our multipurpose turf with advanced night lighting. MAHA Rera - P51700051381 Experience luxury, sustainability, and a vibrant community at Thanekar Palacio, ideally located opposite Thanekar Paradise; Mauli Chowk, Shirgaon, Badlapur East 421501.
Thanekar Palacio - Phase 2 QR Code
Thanekar Palacio - Phase 2
MahaRERA - P51700051381

Tulsi Aawas

₹ 25.07 Lacs. onwards
Badlapur
1/2 BHK apartments
View Details

Tulsi Aadvik

₹ 25.07 Lacs. onwards
Badlapur
1/2 BHK apartments
View Details

Thanekar Civic

₹ 17.99 Lacs. onwards
Badlapur
1/1 RK/2 BHK apartments
View Details

Thanekar Palacio

₹ 32.5 Lacs. onwards
Badlapur
1/2/3 BHK apartments
View Details

Ananta Pride

₹ 20.65 Lacs. onwards
Badlapur
1 BHK apartments
View Details

Tulsi Galaxy

₹ 21.99 Lacs. onwards
Badlapur
1/2 BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    Thanekar Palacio - Phase 2
  • Location:
  • Badlapur, Mauli Chowk, Shirgaon
  • Const. Stage:
    Under Construction
  • Possession:
    Dec 2026
  • Parking:
    Open Reserved;
  • Floors:
    16
Developer Details

Thanekar Group

  • Developer:
    Thanekar Group
  • Phone:
    0251 3262892
  • Website:
    www.thanekargroup.com
  • Address:
  • Ground floor,Bhagirathi Garden.Opp. S.T. stand Near Utkarsha Hospital,Badlapur(W) - 421 503
Project Ratings
Project Brochures
Brochures of Thanekar Palacio - Phase 2by Thanekar Group
Project Brochures
  • MPE/Brochures/30479/Palacio Phase2 Brochure.pdf
Project Amenities
Amenities offred in Thanekar Palacio - Phase 2
LIFESTYLE AMENITIES
Outdoor GamesIndoor GamesLandscaped gardenHigh speed elevatorsSwimming PoolAluminium Sliding WindowsPOP finished wallsGranite PlatformSecurity Help DeskReception Desk
Project RERA Details
RERA Project Status New
Proposed Possession 31 Dec 2026
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51700051381
RERA Project Name Thanekar Palacio Phase Ii
RERA Location Survey No. 82/2/1 Survey No 83/3/6 Survey No 83/3/7 Survey No 83/4A Plot No 3 5 6 & 7
RERA Developer Thanekar Construction Llp
Architect Suraj Andhare
Project RERA Details
Project Type Others
Funding Bank STATE BANK OF INDIA
Last Modified 24 Jan 2024
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Badlapur

Facilities & Amenities
Facilities, Amenities & Common areas details of Thanekar Palacio - Phase 2last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Na
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
Na
Buildings / Wings in Thanekar Palacio - Phase 2
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Thanekar Palacio - Phase 2by Thanekar Grouplast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

58249 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 7

Wings / Towers in Project

Apartments Statistics

257 apartments in total
Total
257
Booked
57
Available
200

Saleable Area Statistics (Sq. ft.)

148893 Total
Total
148893
Booked
31644
Available
117249
Total 257 apartments in project. 57 apartments booked. 22% apartments booked.
Total 13832.5 saleable area. 2939.76 apartments booked.
21% area booked.

Bunglow Type A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bunglow Type ADec 20261100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Bungalow104.68 Sq.mts. ( 1127 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Bunglow Type ACompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Bunglow Type B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bunglow Type BDec 20261100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Bungalow94.2 Sq.mts. ( 1014 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Bunglow Type BCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Bunglow Type C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bunglow Type CDec 20261100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Bungalow110.7 Sq.mts. ( 1192 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Bunglow Type CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress50% done
50% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress52% done
52% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress20% done
20% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress50% done
50% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Bunglow Type D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bunglow Type DDec 20261100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Bungalow93.21 Sq.mts. ( 1003 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Bunglow Type DCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Bunglow Type E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bunglow Type EDec 20260100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Bungalow116.09 Sq.mts. ( 1250 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Bunglow Type ECompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Bunglow Type F

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Bunglow Type FDec 20260100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Bungalow113.02 Sq.mts. ( 1217 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Bunglow Type FCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Thanekar Palacio Phase Ii

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Thanekar Palacio Phase IiDec 202616101200
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.39 Sq.mts. ( 338 Sq.ft. )5
5 Booked100% Booked
100% Booked
1 BHK34.02 Sq.mts. ( 366 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK49.64 Sq.mts. ( 534 Sq.ft. )32
None Booked0% Booked
0% Booked
2 BHK50.73 Sq.mts. ( 546 Sq.ft. )16
None Booked0% Booked
0% Booked
2 BHK51.85 Sq.mts. ( 558 Sq.ft. )29
12 Booked41% Booked
41% Booked
2 BHK46.46 Sq.mts. ( 500 Sq.ft. )12
8 Booked66% Booked
66% Booked
2 BHK47.08 Sq.mts. ( 507 Sq.ft. )10
None Booked0% Booked
0% Booked
2 BHK47.43 Sq.mts. ( 511 Sq.ft. )30
8 Booked26% Booked
26% Booked
2 BHK48.37 Sq.mts. ( 521 Sq.ft. )16
2 BHK49.06 Sq.mts. ( 528 Sq.ft. )16
6 Booked37% Booked
37% Booked
3 BHK60 Sq.mts. ( 646 Sq.ft. )5
4 Booked80% Booked
80% Booked
3 BHK62.84 Sq.mts. ( 676 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK65.37 Sq.mts. ( 704 Sq.ft. )15
None Booked0% Booked
0% Booked
3 BHK66 Sq.mts. ( 710 Sq.ft. )16
None Booked0% Booked
0% Booked
3 BHK66.41 Sq.mts. ( 715 Sq.ft. )16
3 BHK68.33 Sq.mts. ( 736 Sq.ft. )16
7 Booked43% Booked
43% Booked
3 BHK70.4 Sq.mts. ( 758 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop94.07 Sq.mts. ( 1013 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop35.6 Sq.mts. ( 383 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop38.32 Sq.mts. ( 412 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop43.06 Sq.mts. ( 463 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop17.62 Sq.mts. ( 190 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop19.04 Sq.mts. ( 205 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop20.45 Sq.mts. ( 220 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop23.49 Sq.mts. ( 253 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop23.92 Sq.mts. ( 257 Sq.ft. )3
None Booked0% Booked
0% Booked
Shop27.62 Sq.mts. ( 297 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop29.91 Sq.mts. ( 322 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop49.15 Sq.mts. ( 529 Sq.ft. )1
None Booked0% Booked
0% Booked
251 total apartments / 57 apartments booked. 22% apartments booked.
Work Description in Building Thanekar Palacio Phase IiCompletion
Basement (if any)
work-in-progress80% done
80% Booked
Excavation
work-in-progress80% done
80% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress28% done
28% Booked
Plinth
work-in-progress80% done
80% Booked
Podiums (if any)
work-in-progress50% done
50% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress35% done
35% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress25% done
25% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress25% done
25% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress80% done
80% Booked
X number of Podiums
work-in-progress50% done
50% Booked
X number of Slabs of Super Structure
work-in-progress35% done
35% Booked
Project Consultants
Channel Partners Registered by Developer
Thanekar Group
for Project
Thanekar Palacio Phase Ii
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Thanekar Group

Thanekar Group We welcome you to the Thanekar group, which was started back in the year 1991 & today we have successfully reached to an arena of success. Thanekar Group has been fulfilling its commitment of building apartments in Badlapur, Ambernath, Kalyan & Dombivli, cities located in the the Heart of the suburbs with fully furnished luxurious residential flats ranging from 1, 2 & 3 BHK with the most modern amenities & facilities like Swimming pool, Gym, Huge Lawn spaces, Club house, Garden, Joggers Tracks etc offered free of cost for all the beloved residents of Thanekar Group.We also provide you with an assurance of safe & secure residential houses surrounded with a beautiful location with greenery and fresh air. Thanekar group is recognized as one of the fast developing Real estate projects. We aspire in developing Long term relationships with our customers by gaining their trust & taking a step forward each time we develop a new project.