Rite Aspire Project at Borivali West by Rite Developers Pvt. Ltd. (P51800009215)
  • Rating: 3.4
  • (44)

Rite Aspire - Borivali West

Rite Developers Pvt. Ltd.
Project Details, Configuration & Prices
3 BHK825 Sq.ft. Carpet ₹ 3.02 Cr All in
3 BHK898 Sq.ft. Carpet ₹ 3.29 Cr All in
Project overview
Rite Aspire Project at Borivali West by Rite Developers Pvt. Ltd. (P51800009215) is a RERA approved Under Construction Project with RERA ID P51800009215 slated to be ready for possession by Dec 2023 with 3 BHK apartments / Flats starting from ₹ 2.56 Crs onwards

Rite Aspire is a Residential Project Developed by the Rite Developers. It is located at Borivali West. Borivali West is well-connected to other parts of Mumbai through the local train network. Easy connectivity to the Western Express Highway and Link Road. Entertainment, education and healthcare facilities are in close proximity. The Project offers 2 and 3 BHK Residences. houghtfully designed to carve maximum living space for a maximum life. Its a designer marvel with copious space in living rooms and intelligent contours in the kitchen to maximise space utilisation. The apartments are airy for breezy ventilation and freshness all throughout the day. Elegant arrival lounge for guests and Automatic elevators with stainless steel cars. Amenities include Roof Top Garden, Fitness Centre, Sufficient amount of Parking, Earthquake Resistance building, CCTV camera for common areas and many more. Builder possession by May 2024.
Rite Aspire QR Code
Rite Aspire
MahaRERA - P51800009215

Ruparel Skyline

₹ 1.31 Crs. onwards
Borivali West
1/2/3/4 BHK apartments
View Details

Romell Ariana

₹ 1.9 Crs. onwards
Borivali West
2 BHK apartments
View Details

Anmol Residency

₹ 1.92 Crs. onwards
Borivali West
2/3 BHK apartments
View Details

Saffron Peace

₹ 1.84 Crs. onwards
Borivali West
2/3 BHK apartments
View Details

Swastik

₹ 1.04 Crs. onwards
Borivali West
1/2/Office BHK apartments
View Details
Borivali West
2/3 BHK apartments
View Details

Kalpataru Advay

₹ 2.8 Crs. onwards
Borivali West
2/3/4 BHK apartments
View Details

Avyukta Vedant

₹ 1.09 Crs. onwards
Borivali West
1/1½/2/2½ BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    Rite Aspire
  • Location:
  • Borivali West, Borivali Poppy CHS, Abhilasha, Plot “D”, Ram Nagar
  • Const. Stage:
    Under Construction
  • Possession:
    Dec 2023
Developer Details

Rite Developers Pvt. Ltd.

  • Developer:
    Rite Developers Pvt. Ltd.
  • Phone:
    022 28938299
  • Website:
    www.rite.in
  • Address:
  • A- Opp, Shree Krishna Complex, National Park Flyover, Shantivan Complex Colony, Nensey Colony, Borivali East, Mumbai - 400 066.
Project Ratings
Project Amenities
Amenities offred in Rite Aspire
LIFESTYLE AMENITIES
Power BackupHigh speed elevatorsGrand entrance lobbyGymnasiumIntercom/CCTVPOP finished wallsImported Sanitary FittingsVitrified flooringIntercom/CCTVGranite Platform
Project RERA Details
RERA Project Status New
Proposed Possession 30 Jun 2021
Revised Possession 01 Jan 1900
Extended Possession 31 Dec 2023
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800009215
RERA Project Name Rite Aspire
RERA Location Cts No 4/A
RERA Developer Rite Developers Pvt. Ltd.
Architect Ms Tanvi Dedhia
Project RERA Details
Project Type Others
Funding Bank HDFC BANK
Last Modified 08 Jun 2023
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Borivali West

Facilities & Amenities
Facilities, Amenities & Common areas details of Rite Aspirelast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
-
Energy management
Na
Fire Protection And Fire Safety Requirements
-
Landscaping & Tree Planting
-
Open Parking
Na
Other
Health Club
Sewerage (Chamber, Lines, Septic Tank , STP)
Only Sewerage Lines
Solid Waste Management And Disposal
Na
Storm Water Drains
-
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
-
Water Supply
-
Buildings / Wings in Rite Aspire
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Rite Aspireby Rite Developers Pvt. Ltd.last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

13329 Sq. ft.

Project Area

2001 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

26 apartments in total
Total
26
Booked
25
Available
1

Saleable Area Statistics (Sq. ft.)

16163 Total
Total
16163
Booked
13763
Available
2400
Total 26 apartments in project. 25 apartments booked. 96% apartments booked.
Total 1501.59 saleable area. 1278.59 apartments booked.
85% area booked.

Rite Aspire

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rite AspireMar 2021121012024
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK65.72 Sq.mts. ( 707 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK66.6 Sq.mts. ( 717 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK69.06 Sq.mts. ( 743 Sq.ft. )3
3 Booked100% Booked
100% Booked
3 BHK76.68 Sq.mts. ( 825 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK83.47 Sq.mts. ( 898 Sq.ft. )1
1 Booked100% Booked
100% Booked
4 BHK96.52 Sq.mts. ( 1039 Sq.ft. )2
2 Booked100% Booked
100% Booked
Office space117.24 Sq.mts. ( 1262 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office space223 Sq.mts. ( 2400 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space74.88 Sq.mts. ( 806 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop13.01 Sq.mts. ( 140 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop17.65 Sq.mts. ( 190 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop17.74 Sq.mts. ( 191 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop17.84 Sq.mts. ( 192 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop18.95 Sq.mts. ( 204 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop20.53 Sq.mts. ( 221 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop21.92 Sq.mts. ( 236 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop23.13 Sq.mts. ( 249 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop25.18 Sq.mts. ( 271 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop27.59 Sq.mts. ( 297 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop27.96 Sq.mts. ( 301 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop29.08 Sq.mts. ( 313 Sq.ft. )1
1 Booked100% Booked
100% Booked
26 total apartments / 25 apartments booked. 96% apartments booked.
Work Description in Building Rite AspireCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress90% done
90% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress75% done
75% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress75% done
75% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress90% done
90% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress90% done
90% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress90% done
90% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Project Consultants
Channel Partners Registered by Developer
Rite Developers Pvt. Ltd.
for Project
Rite Aspire
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Rite Developers Pvt. Ltd.

Rite Developers Pvt. Ltd. Rite Developers -The company aims to be expert in developing projects that are technologically complex and exhibit quality infrastructure. They are one of the highly respected reactors in the region. The designs and architecture of their residential projects are of international standards. They are known for their contemporary designs, innovation and completion of projects within the most stringent time schedule.