Kalpataru Advay Project at Borivali West by Kalpataru Limited (P51800077381)
  • Rating:
  • ()

Kalpataru Advay - Borivali West

Kalpataru Limited
Project Details, Configuration & Prices
2 BHK781 Sq.ft. Carpet ₹ 2.94 Cr All In
3 BHK1191 Sq.ft. Carpet ₹ 4.54 Cr All In
3 BHK1319 Sq.ft. Carpet ₹ 5 Cr All In
4 BHK1835 Sq.ft. Carpet ₹ 7.15 Cr All In
Project overview
Kalpataru Advay Project at Borivali West by Kalpataru Limited (P51800077381) is a RERA approved Under Construction Project with RERA ID P51800077381 slated to be ready for possession by Jun 2029 with 2/3/4 BHK apartments / Flats starting from ₹ 2.8 Crs onwards

Discover an exclusive development in Borivali, spread across a 6-acre land parcel with only three towers, ensuring a serene and spacious living environment. This luxurious project offers over 51 extensive amenities designed for ultimate comfort and sophistication. With varied configurations including 2BHKs (750-800 sq. ft.), 3BHKs (1200-1300 sq. ft.), and 4BHKs (1800 sq. ft.), it caters to diverse living needs. The thoughtfully planned 1B+1G+5P (7-floor ramp parking) structure provides ample parking space. Strategically located, the development offers excellent connectivity to key areas, making commutes effortless. Each living space is meticulously crafted with state-of-the-art facilities, promising an unparalleled luxury living experience. Moreover, this prime location in Borivali presents an exceptional investment opportunity in the thriving real estate market.
Kalpataru Advay QR Code
Kalpataru Advay
MahaRERA - P51800077381

Ruparel Skyline

₹ 1.31 Crs. onwards
Borivali West
1/2/3/4 BHK apartments
View Details

Romell Ariana

₹ 1.9 Crs. onwards
Borivali West
2 BHK apartments
View Details

Anmol Residency

₹ 1.92 Crs. onwards
Borivali West
2/3 BHK apartments
View Details

Avyukta Vedant

₹ 1.09 Crs. onwards
Borivali West
1/1½/2/2½ BHK apartments
View Details

Saffron Peace

₹ 1.84 Crs. onwards
Borivali West
2/3 BHK apartments
View Details

Swastik

₹ 1.04 Crs. onwards
Borivali West
1/2/Office BHK apartments
View Details
Borivali West
2/3 BHK apartments
View Details

Sheetal Meghdoot

₹ 1.92 Crs. onwards
Borivali West
2/3 BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    Kalpataru Advay
  • Location:
  • Borivali West, Ashok Nagar
  • Const. Stage:
    Under Construction
  • Possession:
    Jun 2029
  • Parking:
    Open Reserved;
  • Floors:
    21
Developer Details

Kalpataru Limited

  • Developer:
    Kalpataru Limited
  • Phone:
    022 30643065
  • Website:
    www.kalpataru.com
  • Address:
  • Kalpataru Constructions,Kalpataru Synergy, Opp. Grand Hyatt, Santacruz (E),Mumbai 400055
Project Ratings
Project Amenities
Amenities offred in Kalpataru Advay
LIFESTYLE AMENITIES
Outdoor GamesIndoor GamesAir Conditioned LobbyKid's play areaLandscaped gardenHigh speed elevatorsGrand entrance lobbyGymnasiumHealth ClubClub HouseSwimming PoolAluminium Sliding WindowsPOP finished wallsImported Sanitary FittingsGranite PlatformSecurity Help DeskReception Desk
Project RERA Details
RERA Project Status New
Proposed Possession 30 Jun 2030
Revised Possession
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800077381
RERA Project Name Kalpataru Advay
RERA Location C.T.S. No.2 (Pt) Of Eksar-S Village & 258/B Of Borivali Village, Borivali (W), Mumbai.
RERA Developer Kalpataru Limited
Project RERA Details
Project Type Residential / Group Housing
Funding Bank HDFC BANK
Last Modified 12 Aug 2024
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Borivali West

Facilities & Amenities
Facilities, Amenities & Common areas details of Kalpataru Advaylast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Common Rg As Per Afs
Club House, Fitness Center, swimming pool & other recreation areas
As Per Afs
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Electrical Meter Room And Sub-Station Only
Energy management
To Be Done Before Completion Of Project
Fire Protection And Fire Safety Requirements
To Be Done Before Completion Of Project
Landscaping & Tree Planting
To Be Done Before Completion Of Project
Open Parking
To Be Done Before Completion Of Project
Sewerage (Chamber, Lines, Septic Tank , STP)
Stp Only
Solid Waste Management And Disposal
To Be Done Before Completion Of Project
Storm Water Drains
To Be Done Before Completion Of Project
Street Lighting
To Be Done Before Completion Of Project
Treatment And Disposal Of Sewage And Sullage Water
To Be Done Before Completion Of Project
Water Conservation, Rain water Harvesting
To Be Done Before Completion Of Project
Water Supply
Water Supply From Local Authority
Buildings / Wings in Kalpataru Advay
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Kalpataru Advayby Kalpataru Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

256490 Sq. ft.

Project Area

58807 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

650 apartments in total
Total
650
Booked
97
Available
553

Saleable Area Statistics (Sq. ft.)

55046041 Total
Total
55046041
Booked
6697075
Available
48348966
Total 650 apartments in project. 97 apartments booked. 14% apartments booked.
Total 5113902.19 saleable area. 622173.46 apartments booked.
12% area booked.

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing AJun 20303711160181
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK Member315.49 Sq.mts. ( 3396 Sq.ft. )7
None Booked0% Booked
0% Booked
2 BHK2293.5 Sq.mts. ( 24687 Sq.ft. )33
17 Booked51% Booked
51% Booked
2 BHK Member11094 Sq.mts. ( 119416 Sq.ft. )184
None Booked0% Booked
0% Booked
2.5 BHK Member2525.62 Sq.mts. ( 27186 Sq.ft. )37
None Booked0% Booked
0% Booked
261 total apartments / 17 apartments booked. 6% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BJun 20302511160256
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK10018.8 Sq.mts. ( 107842 Sq.ft. )90
45 Booked50% Booked
50% Booked
4 BHK6016.54 Sq.mts. ( 64762 Sq.ft. )38
12 Booked31% Booked
31% Booked
128 total apartments / 57 apartments booked. 44% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CJun 20303711160196
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK2614.76 Sq.mts. ( 28145 Sq.ft. )38
23 Booked60% Booked
60% Booked
2 BHK Member9129.56 Sq.mts. ( 98271 Sq.ft. )154
None Booked0% Booked
0% Booked
2.5 BHK381.78 Sq.mts. ( 4109 Sq.ft. )6
None Booked0% Booked
0% Booked
2.5 BHK Member4180 Sq.mts. ( 44994 Sq.ft. )63
None Booked0% Booked
0% Booked
261 total apartments / 23 apartments booked. 8% apartments booked.
Work Description in Building Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Project Consultants
Channel Partners Registered by Developer
Kalpataru Limited
for Project
Kalpataru Advay
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Kalpataru Limited

Kalpataru Limited