One Borivali Project at Borivali West by Osho Developers (P51800034596)
  • Rating: 3.4
  • (32)

One Borivali - Borivali West

Project Details, Configuration & Prices
2 BHK645 Sq.ft. Carpet ₹ 2.26 Cr All In
3 BHK870 Sq.ft. Carpet ₹ 2.46 Cr++
2 BHK870 Sq.ft. Carpet ₹ 3.01 Cr All in
2 BHK695 Sq.ft. Carpet ₹ 2.43 Cr All In
Project overview
One Borivali Project at Borivali West by Osho Developers (P51800034596) is a RERA approved Under Construction Project with RERA ID P51800034596 slated to be ready for possession by Apr 2025 with 2/3 BHK apartments / Flats starting from ₹ 1.61 Crs onwards

One Borivali is a Residential Project Developed by the Osho Developers. It is located at Borivali West. It is well-connected to other parts of the city and beyond. 5 minutes from Borivali Station and Link Road. 10 minutes to Western Express Highway. Borivali West enjoys good connectivity through both road and rail. Close proximity to the social infrastructure. It is a 31 storey standalone tower offering 2 and 3 BHK Luxurious residences. Unobstructed Views of Gorai Creek & City. 3 Podium Parking. Gated Community Living and zero wastage. Double Height Air-conditioned Lobby with exclusive lifestyle amenities which includes Infinity Pool, gym, Mini Theatre, children's play area, ample car parking.
One Borivali QR Code
One Borivali
MahaRERA - P51800034596

Ruparel Skyline

₹ 1.31 Crs. onwards
Borivali West
1/2/3/4 BHK apartments
View Details

Romell Ariana

₹ 1.9 Crs. onwards
Borivali West
2 BHK apartments
View Details

Anmol Residency

₹ 1.92 Crs. onwards
Borivali West
2/3 BHK apartments
View Details

Saffron Peace

₹ 1.84 Crs. onwards
Borivali West
2/3 BHK apartments
View Details

Swastik

₹ 1.04 Crs. onwards
Borivali West
1/2/Office BHK apartments
View Details
Borivali West
2/3 BHK apartments
View Details

Kalpataru Advay

₹ 2.8 Crs. onwards
Borivali West
2/3/4 BHK apartments
View Details

Avyukta Vedant

₹ 1.09 Crs. onwards
Borivali West
1/1½/2/2½ BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    One Borivali
  • Location:
  • Borivali West, Ram Mandir Road, Babhai Naka
  • Const. Stage:
    Under Construction
  • Possession:
    Apr 2025
  • Parking:
    Podium;
  • Floors:
    31
Developer Details

  • Developer:
    Osho Developers
  • Phone:
    022 28910300
  • Website:
  • Address:
  • Osho, Plot 1534/A, NEw Link Road, Extn. Devidas Lane, Opp. Eskay Club, Borivali West, Mumbai - 400 092.
Project Ratings
Project Brochures
Brochures of One Borivaliby Osho Developers
Project Brochures
  • MPE/Brochures/28656/One Borivali E Brochure.pdf
Project Amenities
Amenities offred in One Borivali
LIFESTYLE AMENITIES
Outdoor GamesIndoor GamesAir Conditioned LobbyKid's play areaLandscaped gardenJogging TrackHigh speed elevatorsGrand entrance lobbyGymnasiumSwimming PoolIntercom/CCTVVideo Door PhonesPOP finished wallsImported Sanitary FittingsVitrified flooringKitchen CabinetsGranite Platform
Project RERA Details
RERA Project Status New
Proposed Possession 10 Feb 2026
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800034596
RERA Project Name Sai Krupa Chsl Redeveloped
RERA Location 298, 301
RERA Developer Osho Developers
Architect Kalpesh L Shah
Project RERA Details
Project Type Others
Funding Bank SOUTH INDIAN BANK
Last Modified 11 Apr 2022
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Borivali West

Facilities & Amenities
Facilities, Amenities & Common areas details of One Borivalilast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
515 Sq Mtrs
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station35% completed
35% Complete
Na
Energy management
Na
Fire Protection And Fire Safety Requirements50% completed
50% Complete
System As Per Cfo Noc
Landscaping & Tree Planting
Na
Open Parking
4
Sewerage (Chamber, Lines, Septic Tank , STP)50% completed
50% Complete
As Per Mcgm Requirement
Solid Waste Management And Disposal50% completed
50% Complete
As Per Mcgm Requirement
Storm Water Drains50% completed
50% Complete
As Per Proposed Plan
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water75% completed
75% Complete
In Further Stage
Water Conservation, Rain water Harvesting
Na
Water Supply50% completed
50% Complete
Mcgm &Amp; Borewell
Buildings / Wings in One Borivali
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of One Borivaliby Osho Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

29656 Sq. ft.

Project Area

5931 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

31 apartments in total
Total
31
Booked
14
Available
17

Saleable Area Statistics (Sq. ft.)

22320 Total
Total
22320
Booked
10270
Available
12050
Total 31 apartments in project. 14 apartments booked. 45% apartments booked.
Total 2073.6 saleable area. 954.12 apartments booked.
46% area booked.

Sai Krupa Chsl

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sai Krupa ChslOct 202632111101
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK57.13 Sq.mts. ( 615 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK59.92 Sq.mts. ( 645 Sq.ft. )6
2 BHK60.85 Sq.mts. ( 655 Sq.ft. )8
3 Booked37% Booked
37% Booked
2 BHK64.1 Sq.mts. ( 690 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK64.57 Sq.mts. ( 695 Sq.ft. )7
4 Booked57% Booked
57% Booked
2 BHK72.93 Sq.mts. ( 785 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK79.43 Sq.mts. ( 855 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK80.83 Sq.mts. ( 870 Sq.ft. )5
2 Booked40% Booked
40% Booked
3 BHK97.55 Sq.mts. ( 1050 Sq.ft. )1
1 Booked100% Booked
100% Booked
31 total apartments / 14 apartments booked. 45% apartments booked.
Work Description in Building Sai Krupa ChslCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress65% done
65% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress55% done
55% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress65% done
65% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress85% done
85% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress85% done
85% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress45% done
45% Booked
Sanitary Fittings within the flats / premises
work-in-progress75% done
75% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress65% done
65% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress75% done
75% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress45% done
45% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Project Consultants
Channel Partners Registered by Developer
Osho Developers
for Project
Sai Krupa Chsl Redeveloped
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Osho Developers