Ipsit Anand Mangal Project at Borivali West by IPSIT Group (P51800045322)
  • Rating:
  • ()

Ipsit Anand Mangal - Borivali West

Project Details, Configuration & Prices
2 BHK573 Sq.ft. Carpet ₹ 2.38 Cr All In
2 BHK651 Sq.ft. Carpet ₹ 2.68 Cr All In
2 BHK664 Sq.ft. Carpet ₹ 2.73 Cr All In
2 BHK716 Sq.ft. Carpet ₹ 2.93 Cr All In
2 BHK726 Sq.ft. Carpet ₹ 2.97 Cr All In
2 BHK765 Sq.ft. Carpet ₹ 3.12 Cr All In
3 BHK981 Sq.ft. Carpet ₹ 3.96 Cr All In
3 BHK987 Sq.ft. Carpet ₹ 3.98 Cr All In
3 BHK1083 Sq.ft. Carpet ₹ 4.35 Cr all In
Project overview
Ipsit Anand Mangal Project at Borivali West by IPSIT Group (P51800045322) is a RERA approved Under Construction Project with RERA ID P51800045322 slated to be ready for possession by Jun 2026 with 2/3 BHK apartments / Flats starting from ₹ 1.96 Crs onwards

Ipsit Anand Mangal QR Code
Ipsit Anand Mangal
MahaRERA - P51800045322

Ruparel Skyline

₹ 1.31 Crs. onwards
Borivali West
1/2/3/4 BHK apartments
View Details

Romell Ariana

₹ 1.85 Crs. onwards
Borivali West
2/3½ BHK apartments
View Details

Swastik

₹ 1.04 Crs. onwards
Borivali West
1/2/Office BHK apartments
View Details
Borivali West
2/3 BHK apartments
View Details

Kalpataru Advay

₹ 2.8 Crs. onwards
Borivali West
2/3/4 BHK apartments
View Details

Avyukta Vedant

₹ 1.09 Crs. onwards
Borivali West
1/1½/2/2½ BHK apartments
View Details

Sheetal Meghdoot

₹ 1.92 Crs. onwards
Borivali West
2/3 BHK apartments
View Details

Paradigm Anantaara

₹ 1.99 Crs. onwards
Borivali West
2/3 BHK apartments
View Details
Project Details
Project details were last updated in Dec 2025
  • Project:
    Ipsit Anand Mangal
  • Location:
  • Borivali West, Jambli Galli, Behind Moksh Plaza Mall, Mhatre Wadi,
  • Const. Stage:
    Under Construction
  • Possession:
    Jun 2026
  • Floors:
    21
Developer Details

  • Developer:
    IPSIT Group
  • Phone:
    022 39671300
  • Website:
    www.ipsitprojects.com
  • Address:
  • A-102/103, Vishnu Apartment, L.T.Road, Bahabi Naka, Borivali-(West), Mumbai-400 092.
Project Ratings
Project Amenities
Amenities offred in Ipsit Anand Mangal
Project RERA Details
RERA Project Status New
Proposed Possession 31 Dec 2027
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800045322
RERA Project Name Ipsit Anand Mangal
RERA Location 111/1 To 17, Cts No 111, Fp No 70 Of Village Kanheri
RERA Developer Navkar Developers
Architect Suresh A Gaikwad
Project RERA Details
Project Type Others
Funding Bank HDFC BANK
Last Modified 10 Jul 2024
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Borivali West

Facilities & Amenities
Facilities, Amenities & Common areas details of Ipsit Anand Mangallast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Wip
Electrical Meter Room, Sub-Station, Receiving Station
Wip
Energy management
Wip
Fire Protection And Fire Safety Requirements
Wip
Landscaping & Tree Planting
Wip
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Wip
Solid Waste Management And Disposal
Wip
Storm Water Drains
Wip
Street Lighting
Wip
Treatment And Disposal Of Sewage And Sullage Water
Wip
Water Conservation, Rain water Harvesting
Wip
Water Supply
Wip
Buildings / Wings in Ipsit Anand Mangal
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Ipsit Anand Mangalby IPSIT Grouplast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

22796 Sq. ft.

Project Area

5242 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

163 apartments in total
Total
163
Booked
44
Available
119

Saleable Area Statistics (Sq. ft.)

112950 Total
Total
112950
Booked
32580
Available
80369
Total 163 apartments in project. 44 apartments booked. 26% apartments booked.
Total 10493.28 saleable area. 3026.8 apartments booked.
29% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingDec 202721111600
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK66.55 Sq.mts. ( 716 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK67.46 Sq.mts. ( 726 Sq.ft. )13
8 Booked61% Booked
61% Booked
2 BHK67.64 Sq.mts. ( 728 Sq.ft. )11
5 Booked45% Booked
45% Booked
2 BHK71.12 Sq.mts. ( 766 Sq.ft. )8
4 Booked50% Booked
50% Booked
2 BHK69.12 Sq.mts. ( 744 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK86.15 Sq.mts. ( 927 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK91.3 Sq.mts. ( 983 Sq.ft. )3
2 Booked66% Booked
66% Booked
Office space95.98 Sq.mts. ( 1033 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop55.98 Sq.mts. ( 603 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop29.7 Sq.mts. ( 320 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop34.08 Sq.mts. ( 367 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop39.37 Sq.mts. ( 424 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop39.43 Sq.mts. ( 424 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop43.52 Sq.mts. ( 468 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop44.92 Sq.mts. ( 484 Sq.ft. )1
None Booked0% Booked
0% Booked
Society member51 Sq.mts. ( 549 Sq.ft. )1
None Booked0% Booked
0% Booked
Society Member56.2 Sq.mts. ( 605 Sq.ft. )1
None Booked0% Booked
0% Booked
Society member66.55 Sq.mts. ( 716 Sq.ft. )1
None Booked0% Booked
0% Booked
Society member71.12 Sq.mts. ( 766 Sq.ft. )2
None Booked0% Booked
0% Booked
Society member81.75 Sq.mts. ( 880 Sq.ft. )1
None Booked0% Booked
0% Booked
Society member81.91 Sq.mts. ( 882 Sq.ft. )1
None Booked0% Booked
0% Booked
Society member67.64 Sq.mts. ( 728 Sq.ft. )5
None Booked0% Booked
0% Booked
Society member67.46 Sq.mts. ( 726 Sq.ft. )1
None Booked0% Booked
0% Booked
Society member91.3 Sq.mts. ( 983 Sq.ft. )4
None Booked0% Booked
0% Booked
Society member86.15 Sq.mts. ( 927 Sq.ft. )5
None Booked0% Booked
0% Booked
Society member69.12 Sq.mts. ( 744 Sq.ft. )2
None Booked0% Booked
0% Booked
Society member28.33 Sq.mts. ( 305 Sq.ft. )1
None Booked0% Booked
0% Booked
74 total apartments / 25 apartments booked. 33% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress62% done
62% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress62% done
62% Booked

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingDec 202721111600
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK39.58 Sq.mts. ( 426 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK50.7 Sq.mts. ( 546 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK53.26 Sq.mts. ( 573 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK60.48 Sq.mts. ( 651 Sq.ft. )10
7 Booked70% Booked
70% Booked
3 BHK100.61 Sq.mts. ( 1083 Sq.ft. )8
3 Booked37% Booked
37% Booked
Society member100.61 Sq.mts. ( 1083 Sq.ft. )2
None Booked0% Booked
0% Booked
Society member60.48 Sq.mts. ( 651 Sq.ft. )8
None Booked0% Booked
0% Booked
Society Member53.26 Sq.mts. ( 573 Sq.ft. )1
None Booked0% Booked
0% Booked
Society Member39.58 Sq.mts. ( 426 Sq.ft. )7
None Booked0% Booked
0% Booked
Society Member58.1 Sq.mts. ( 625 Sq.ft. )1
None Booked0% Booked
0% Booked
Society member35.15 Sq.mts. ( 378 Sq.ft. )4
None Booked0% Booked
0% Booked
Society Members36.68 Sq.mts. ( 395 Sq.ft. )1
None Booked0% Booked
0% Booked
Society Members40.82 Sq.mts. ( 439 Sq.ft. )2
None Booked0% Booked
0% Booked
Society Members55.3 Sq.mts. ( 595 Sq.ft. )1
None Booked0% Booked
0% Booked
50 total apartments / 15 apartments booked. 30% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress62% done
62% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress62% done
62% Booked

C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C WingDec 202721111601
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1RK29.18 Sq.mts. ( 314 Sq.ft. )2
None Booked0% Booked
0% Booked
1RK29.41 Sq.mts. ( 317 Sq.ft. )1
None Booked0% Booked
0% Booked
1RK17.54 Sq.mts. ( 189 Sq.ft. )1
None Booked0% Booked
0% Booked
1RK18.13 Sq.mts. ( 195 Sq.ft. )1
None Booked0% Booked
0% Booked
1RK24.15 Sq.mts. ( 260 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK49.36 Sq.mts. ( 531 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK61.75 Sq.mts. ( 665 Sq.ft. )3
1 Booked33% Booked
33% Booked
3 BHK91.17 Sq.mts. ( 981 Sq.ft. )19
Society Member24.15 Sq.mts. ( 260 Sq.ft. )1
None Booked0% Booked
0% Booked
Society Member24.85 Sq.mts. ( 267 Sq.ft. )2
None Booked0% Booked
0% Booked
Society Member25.48 Sq.mts. ( 274 Sq.ft. )1
None Booked0% Booked
0% Booked
Society Member26.04 Sq.mts. ( 280 Sq.ft. )1
None Booked0% Booked
0% Booked
Society Member17.12 Sq.mts. ( 184 Sq.ft. )1
None Booked0% Booked
0% Booked
Society Member17.35 Sq.mts. ( 187 Sq.ft. )2
None Booked0% Booked
0% Booked
Society Member30.89 Sq.mts. ( 332 Sq.ft. )1
None Booked0% Booked
0% Booked
Society Member29.39 Sq.mts. ( 316 Sq.ft. )1
None Booked0% Booked
0% Booked
39 total apartments / 4 apartments booked. 10% apartments booked.
Work Description in Building C WingCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Project Consultants
Channel Partners Registered by Developer
IPSIT Group
for Project
Ipsit Anand Mangal
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About IPSIT Group

ISPIT is truly a progressive company. Keeping pace with changing times and needs. Therefore, in its newest project in Palghar it has created Homes that are technologically advanced in everyway. People can remain connected with the world beyond, on a 24 x 7 basis. It is such endearing homes with a lot of heart that IPSIT caringly builds. It has doing so for over 25 years having developed numerous prestigious projects in places like Virar and Palghar. Whilst building homes, it has also built a credible reputation of trust, reliability and quality.