Garuda Shatrunjay Project at Borivali West by Garuda Infrastructure (P51800011329)
  • Rating: 4.4
  • (165)

Garuda Shatrunjay - Borivali West

Garuda Infrastructure
Project Details, Configuration & Prices
1½ BHK530 Sq.ft. Carpet ₹ 1.43 Cr ++
1½ BHK547 Sq.ft. Carpet ₹ 1.48 Cr ++
2 BHK782 Sq.ft. Carpet ₹ 2.11 Cr ++
3 BHK862 Sq.ft. Carpet ₹ 2.31 Cr ++
Project overview
Garuda Shatrunjay Project at Borivali West by Garuda Infrastructure (P51800011329) is a RERA approved Under Construction Project with RERA ID P51800011329 slated to be ready for possession by Dec 2024 with 1½/2/3 BHK apartments / Flats starting from ₹ 1.46 Crs onwards

Garuda Shatrunjay is a residential project developed by Garuda Infrastructure, located at Borivali West. The location of Garuda Shatrunjay is very convenient. It takes only 5 minutes to reach Borivali Station and 10 minutes to reach the Western Express Highway. Additionally, Kandivali Station and S.v Road are within a 10-minute proximity. residents have easy access to transportation networks and other amenities in the area. t is a tall tower with 41 floors offering luxurious 2 and 3 BHK apartments for a comfortable living experience. The apartments in Garuda Shatrunjay are designed according to Vaastu principles, ensuring a positive and harmonious living environment. There is a Jain Temple nearby for those who follow the Jain religion. The project offers a stilt level and 8-level podium car park for residents' convenience. The apartments provide panoramic views of greenery, allowing residents to enjoy the beauty of nature. The landscape is designed with a nature theme, enhancing the overall ambiance. Garuda Shatrunjay provides a range of amenities for residents to enjoy. These include an infinity pool and a kids pool, a banquet hall, four high-speed elevators, a dedicated sitting area for senior citizens, a maze lawn with a barbecue area, and a children's play area with rubberised matting, among many others.
Garuda Shatrunjay QR Code
Garuda Shatrunjay
MahaRERA - P51800011329

Ruparel Skyline

₹ 1.31 Crs. onwards
Borivali West
1/2/3/4 BHK apartments
View Details

Romell Ariana

₹ 1.9 Crs. onwards
Borivali West
2 BHK apartments
View Details

Anmol Residency

₹ 1.92 Crs. onwards
Borivali West
2/3 BHK apartments
View Details

Saffron Peace

₹ 1.84 Crs. onwards
Borivali West
2/3 BHK apartments
View Details

Swastik

₹ 1.04 Crs. onwards
Borivali West
1/2/Office BHK apartments
View Details
Borivali West
2/3 BHK apartments
View Details

Sheetal Meghdoot

₹ 1.92 Crs. onwards
Borivali West
2/3 BHK apartments
View Details

Kalpataru Advay

₹ 2.8 Crs. onwards
Borivali West
2/3/4 BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    Garuda Shatrunjay
  • Location:
  • Borivali West, Ram Baug Lane
  • Const. Stage:
    Under Construction
  • Possession:
    Dec 2024
  • Parking:
    Open Reserved;
  • Floors:
    41
Developer Details

Garuda Infrastructure

  • Developer:
    Garuda Infrastructure
  • Phone:
  • Website:
    https://www.garudainfra.com/
  • Address:
  • Plot No HIG-A-47, AP Housing Board Colony, Near DLF IT Park, Gachibowli, Hyderabad 500032
Project Ratings
Project Brochures
Brochures of Garuda Shatrunjayby Garuda Infrastructure
Project Brochures
  • MPE/Brochures/28404/Shatrunjay Brochure.pdf
Project Amenities
Amenities offred in Garuda Shatrunjay
LIFESTYLE AMENITIES
Power BackupOutdoor GamesIndoor GamesAir Conditioned LobbyHigh speed elevatorsGrand entrance lobbyGymnasiumPOP finished wallsImported Sanitary FittingsGranite PlatformSecurity Help DeskReception Desk
Project RERA Details
RERA Project Status Ongoing
Proposed Possession 25 Dec 2024
Revised Possession 25 Dec 2024
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800011329
RERA Project Name Garuda Shatrunjay
RERA Location 43/ 1 To 12, 43, 437/ 1 To 11 Of Village Poisar, 45Pt, 46Pt Village Magathane And 437, 44/ 1 To 5, 44
RERA Developer Messers Shree Umiya Builders & Developers
Architect Arcvishan Infratech Limited
Project RERA Details
Project Type Others
Funding Bank STATE BANK OF INDIA
Last Modified 30 Jan 2025
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Borivali West

Facilities & Amenities
Facilities, Amenities & Common areas details of Garuda Shatrunjaylast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
BMS ROOM
-
Community Buildings100% completed
95% Complete
-
DG SETS
-
Electrical Meter Room, Sub-Station, Receiving Station95% completed
95% Complete
Na
Energy management
Na
ENTRANCE LOBBY
-
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Na
FITNESS AREA
-
Landscaping & Tree Planting
-
Open Parking
Na
PUMP ROOM
-
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
-
Solid Waste Management And Disposal100% completed
95% Complete
Na
Storm Water Drains100% completed
95% Complete
-
Street Lighting30% completed
30% Complete
-
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
-
Water Conservation, Rain water Harvesting80% completed
80% Complete
-
Water Supply100% completed
95% Complete
-
Buildings / Wings in Garuda Shatrunjay
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Garuda Shatrunjayby Garuda Infrastructurelast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

47257 Sq. ft.

Project Area

1830 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

407 apartments in total
Total
407
Booked
33
Available
374

Saleable Area Statistics (Sq. ft.)

200938 Total
Total
200938
Booked
24752
Available
176186
Total 407 apartments in project. 33 apartments booked. 8% apartments booked.
Total 18667.63 saleable area. 2299.53 apartments booked.
12% area booked.

Garuda Shatrunjay

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Garuda ShatrunjayDec 2024341118096
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1.5 BHK49.12 Sq.mts. ( 529 Sq.ft. )27
6 Booked22% Booked
22% Booked
1.5 BHK50.52 Sq.mts. ( 544 Sq.ft. )1
None Booked0% Booked
0% Booked
1.5 BHK50.74 Sq.mts. ( 546 Sq.ft. )31
2 BHK72.43 Sq.mts. ( 780 Sq.ft. )5
None Booked0% Booked
0% Booked
2.5 BHK72.67 Sq.mts. ( 782 Sq.ft. )27
7 Booked25% Booked
25% Booked
2.5 BHK80.09 Sq.mts. ( 862 Sq.ft. )32
2.5 BHK80.37 Sq.mts. ( 865 Sq.ft. )26
2.5 BHK82.7 Sq.mts. ( 890 Sq.ft. )26
8 Booked30% Booked
30% Booked
3.5 BHK99.44 Sq.mts. ( 1070 Sq.ft. )5
1 Booked20% Booked
20% Booked
180 total apartments / 33 apartments booked. 18% apartments booked.
Work Description in Building Garuda ShatrunjayCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Rehab Building

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rehab BuildingDec 202424100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
COMMERCIAL9.25 Sq.mts. ( 100 Sq.ft. )1
None Booked0% Booked
0% Booked
COMMERCIAL11.15 Sq.mts. ( 120 Sq.ft. )1
None Booked0% Booked
0% Booked
COMMERCIAL11.17 Sq.mts. ( 120 Sq.ft. )1
None Booked0% Booked
0% Booked
COMMERCIAL17.01 Sq.mts. ( 183 Sq.ft. )1
None Booked0% Booked
0% Booked
RESI CUM COMMERCIAL25 Sq.mts. ( 269 Sq.ft. )3
None Booked0% Booked
0% Booked
RESI CUM COMMERCIAL31.78 Sq.mts. ( 342 Sq.ft. )1
None Booked0% Booked
0% Booked
RESIDENTIAL25.16 Sq.mts. ( 271 Sq.ft. )218
None Booked0% Booked
0% Booked
226 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Rehab BuildingCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Reservation Building

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Reservation BuildingDec 202431114030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
LODGINGROOM453.55 Sq.mts. ( 4882 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Reservation BuildingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress24% done
24% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Project Consultants
Channel Partners Registered by Developer
Garuda Infrastructure
for Project
Garuda Shatrunjay
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Garuda Infrastructure

Garuda Infrastructure Garuda Infratech India Private Limited (GIIPL), having its Head Office at Plot No HIG-A-47, AP Housing Board Colony, Near DLF IT Park, Gachibowli, Hyderabad 500032, AP, India is a Private Limited Company established in Hyderabad to perform businesses in the Construction Sector mainly Buildings, Residential & Commercial Complexes, Roads, Hospitals, Schools, Hotels, and Construction of Power Plants.