Project Details, Configuration & Prices
Project overview
with BHK apartments / Flats starting from N/A onwards

Arkade Aura

₹ 6.87 Crs. onwards
Santacruz West
3/4 BHK apartments
View Details

Mirchandani Triton

₹ 12.04 Crs. onwards
Santacruz West
3/5 BHK apartments
View Details

Veena Solace

₹ 3.57 Crs. onwards
Santacruz West
2/3/6 BHK apartments
View Details

DLH Dawn

₹ 8.55 Crs. onwards
Santacruz West
3/4 BHK apartments
View Details

Altair 77

₹ 4.84 Crs. onwards
Santacruz West
2/3/4 BHK apartments
View Details

Vascon One 54 Orchids

₹ 3.79 Crs. onwards
Santacruz West
2/3 BHK apartments
View Details
Santacruz West
2/3/4 BHK apartments
View Details

Navish Divine

₹ 7.58 Crs. onwards
Santacruz West
3 BHK apartments
View Details
Project Details
  • Project:
  • Location:
  • ,
  • Const. Stage:
  • Possession:
  • Parking:
  • Floors:
Developer Details

ekta world

  • Developer:
  • Phone:
  • Website:
  • Address:
Project Ratings
Project Brochures
Brochures of by
Project Brochures
Project Amenities
Amenities offred in
LIFESTYLE AMENITIES
Swimming PoolGymnasiumGrand entrance lobbyHigh speed elevatorsLandscaped gardenKid's play areaPower BackupVitrified flooringImported Sanitary FittingsPOP finished wallsVideo Door PhonesIntercom/CCTVModular KitchenKitchen ChimneyPiped Gas
Project RERA Details
RERA Project Status Ongoing
Proposed Possession 30 Dec 2022
Revised Possession 30 Dec 2022
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800005021
RERA Project Name Ekta Trinity
RERA Location Cs No H/399
RERA Developer Ekta Housing Private Limited
Architect A R Mehta & Associates
Project RERA Details
Project Type Residential / Group Housing
Funding Bank HDFC BANK
Last Modified 09 Aug 2017
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in

Facilities & Amenities
Facilities, Amenities & Common areas details of last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Common For The Whole Project
Children Play Area
Common For All
COMMON BASEMENTS AND PODIUM100% completed
95% Complete
Work In Progress
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Yet To Start
Energy management
Na
Fire Protection And Fire Safety Requirements
Yet To Start
GYMNASIUM
Common For All
Landscaping & Tree Planting
Yet To Start
Lawn
Yet To Start
Open Parking
Yet To Start
Sewerage (Chamber, Lines, Septic Tank , STP)
No Septic Tank And Stp
Solid Waste Management And Disposal
Na
Storm Water Drains
Yet To Start
Street Lighting
Na
Swimming Pool
Yet To Start
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Yet To Start
Water Supply
Yet To Start
Buildings / Wings in
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of by last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

29979 Sq. ft.

Project Area

4333 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

58 apartments in total
Total
58
Booked
57
Available
1

Saleable Area Statistics (Sq. ft.)

58414 Total
Total
58414
Booked
57282
Available
1132
Total 58 apartments in project. 57 apartments booked. 98% apartments booked.
Total 5426.81 saleable area. 5321.64 apartments booked.
98% area booked.

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing ADec 202115101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK TYPE 1105.17 Sq.mts. ( 1132 Sq.ft. )4
3 Booked75% Booked
75% Booked
3 BHK TYPE 2107.23 Sq.mts. ( 1154 Sq.ft. )4
4 Booked100% Booked
100% Booked
3 BHK TYPE 3108.43 Sq.mts. ( 1167 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK TYPE 4109.47 Sq.mts. ( 1178 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK TYPE 5115.25 Sq.mts. ( 1241 Sq.ft. )9
9 Booked100% Booked
100% Booked
3 BHK TYPE 6117.6 Sq.mts. ( 1266 Sq.ft. )3
3 Booked100% Booked
100% Booked
3 BHK TYPE 7119.84 Sq.mts. ( 1290 Sq.ft. )3
3 Booked100% Booked
100% Booked
3 BHK TYPE 8122.52 Sq.mts. ( 1319 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK TYPE 9126.15 Sq.mts. ( 1358 Sq.ft. )2
2 Booked100% Booked
100% Booked
28 total apartments / 27 apartments booked. 96% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress98% done
98% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress98% done
98% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress98% done
98% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress53% done
53% Booked
Sanitary Fittings within the flats / premises
work-in-progress53% done
53% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress98% done
98% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress98% done
98% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress98% done
98% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BDec 202116101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress98% done
98% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress98% done
98% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress98% done
98% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress53% done
53% Booked
Sanitary Fittings within the flats / premises
work-in-progress53% done
53% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress98% done
98% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress98% done
98% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress98% done
98% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CDec 202116101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK TYPE 143.78 Sq.mts. ( 471 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK TYPE 253.92 Sq.mts. ( 580 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK TYPE 354.2 Sq.mts. ( 583 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK TYPE454.26 Sq.mts. ( 584 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK TYPE 173.43 Sq.mts. ( 790 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK TYPE 1082.24 Sq.mts. ( 885 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK TYPE 1182.45 Sq.mts. ( 887 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK TYPE 273.74 Sq.mts. ( 794 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK TYPE 377.64 Sq.mts. ( 836 Sq.ft. )5
5 Booked100% Booked
100% Booked
2 BHK TYPE 477.94 Sq.mts. ( 839 Sq.ft. )5
5 Booked100% Booked
100% Booked
2 BHK TYPE 578.64 Sq.mts. ( 846 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK TYPE 678.8 Sq.mts. ( 848 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK TYPE 778.95 Sq.mts. ( 850 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK TYPE 879.13 Sq.mts. ( 852 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK TYPE 982.12 Sq.mts. ( 884 Sq.ft. )2
2 Booked100% Booked
100% Booked
30 total apartments / 30 apartments booked. 100% apartments booked.
Work Description in Building Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress98% done
98% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress98% done
98% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress98% done
98% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress53% done
53% Booked
Sanitary Fittings within the flats / premises
work-in-progress53% done
53% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress98% done
98% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress98% done
98% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress98% done
98% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Project Consultants
Channel Partners Registered by Developer
for Project
Ekta Trinity
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation