Arkade Aura Project at Santacruz West by Arkade Developers (P51800047460)
  • Rating: 4.2
  • (44)

Arkade Aura - Santacruz West

Project Details, Configuration & Prices
3 BHK1203 Sq.ft. Carpet ₹ 7.85 Cr All In
4 BHK1591 Sq.ft. Carpet ₹ 10.75 Cr All In
4 BHK1613 Sq.ft. Carpet ₹ 11.15 Cr All In
Project overview
Arkade Aura Project at Santacruz West by Arkade Developers (P51800047460) is a Ready Possession Project with 3/4 BHK apartments / Flats starting from ₹ 6.87 Crs onwards

Arkade Aura is a Project by Arkade Group. It is located at Santacruz West. Project offers immediate access to SV road. It is also close to Jain Temple with upasara and Haveli also close to well known hospitals, schools and colleges. spread over approx 1 Acre land parcel. 4 wings of 14 Floors Each. offers unmatched hassle-free surface podium parking. All modern & lifestyle Amenities on Eco deck level which is spread across 30,000 sqft. Offering exclusive 3 BHK and 4 BHK Apartments & Jodi options. RERA approved project.
Arkade Aura QR Code
Arkade Aura
MahaRERA - P51800047460

Mirchandani Triton

₹ 12.04 Crs. onwards
Santacruz West
3/5 BHK apartments
View Details

Veena Solace

₹ 3.57 Crs. onwards
Santacruz West
2/3/6 BHK apartments
View Details

DLH Dawn

₹ 8.55 Crs. onwards
Santacruz West
3/4 BHK apartments
View Details

Altair 77

₹ 4.84 Crs. onwards
Santacruz West
2/3/4 BHK apartments
View Details

Vascon One 54 Orchids

₹ 3.79 Crs. onwards
Santacruz West
2/3 BHK apartments
View Details
Santacruz West
2/3/4 BHK apartments
View Details

Navish Divine

₹ 7.58 Crs. onwards
Santacruz West
3 BHK apartments
View Details

The Gateway

₹ 4.26 Crs. onwards
Santacruz West
2/3 BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    Arkade Aura
  • Location:
  • Santacruz West, Poddar Street, Opp, Bank of Baroda
  • Const. Stage:
    Ready Possession
  • Possession:
  • Parking:
    Podium
  • Floors:
    14
Developer Details

  • Developer:
    Arkade Developers
  • Phone:
    022 28874742
  • Website:
    www.arkade.in
  • Address:
  • Bhoomi Arcade, A - 103,Opp. Children Academy School, Atmaram Sawant Road, Ashok Nagar, Kandivali (East), Mumbai 400 101.
Project Ratings
Project Amenities
Amenities offred in Arkade Aura
LIFESTYLE AMENITIES
Power BackupOutdoor GamesKid's play areaLandscaped gardenJogging TrackHigh speed elevatorsGrand entrance lobbyGymnasiumIntercom/CCTVPOP finished wallsImported Sanitary FittingsVitrified flooringPiped GasGranite PlatformSecurity Help DeskReception Desk
Project RERA Details
RERA Project Status New
Proposed Possession 31 Dec 2025
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800047460
RERA Project Name Arkade Aura
RERA Location 43
RERA Developer Arkade Developers Private Limited
Architect Kalakruti Architects & Planners
Project RERA Details
Project Type Residential / Group Housing
Funding Bank HDFC BANK
Last Modified 16 Nov 2023
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Santacruz West

Facilities & Amenities
Facilities, Amenities & Common areas details of Arkade Auralast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Car Parking System
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station90% completed
90% Complete
Na
Energy management
Na
Fire Protection And Fire Safety Requirements80% completed
80% Complete
Na
Fitness Centre Society Office40% completed
40% Complete
Na
Landscaping & Tree Planting20% completed
20% Complete
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)80% completed
80% Complete
Na
Solid Waste Management And Disposal75% completed
75% Complete
Na
Storm Water Drains80% completed
80% Complete
Na
Street Lighting
Na
Swimming Pool
Na
Treatment And Disposal Of Sewage And Sullage Water
Only Disposal
Water Conservation, Rain water Harvesting80% completed
80% Complete
Na
Water Supply75% completed
75% Complete
Na
Buildings / Wings in Arkade Aura
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Arkade Auraby Arkade Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

40813 Sq. ft.

Project Area

20354 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

104 apartments in total
Total
104
Booked
84
Available
20

Saleable Area Statistics (Sq. ft.)

110427 Total
Total
110427
Booked
85767
Available
24661
Total 104 apartments in project. 84 apartments booked. 80% apartments booked.
Total 10258.95 saleable area. 7967.93 apartments booked.
78% area booked.

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing ADec 202512110300
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK66.69 Sq.mts. ( 718 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK78.85 Sq.mts. ( 849 Sq.ft. )2
1 Booked50% Booked
50% Booked
2 BHK79.55 Sq.mts. ( 856 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK80.01 Sq.mts. ( 861 Sq.ft. )3
3 Booked100% Booked
100% Booked
2.5 BHK84.23 Sq.mts. ( 907 Sq.ft. )5
5 Booked100% Booked
100% Booked
3 BHK101.78 Sq.mts. ( 1096 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK119.26 Sq.mts. ( 1284 Sq.ft. )7
6 Booked85% Booked
85% Booked
3 BHK124.96 Sq.mts. ( 1345 Sq.ft. )2
2 Booked100% Booked
100% Booked
22 total apartments / 20 apartments booked. 90% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress70% done
70% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress66% done
66% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress66% done
66% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress50% done
50% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress97% done
97% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress97% done
97% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress70% done
70% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BDec 202512110300
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK53.3 Sq.mts. ( 574 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK58.25 Sq.mts. ( 627 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK66.64 Sq.mts. ( 717 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK68.12 Sq.mts. ( 733 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK69.13 Sq.mts. ( 744 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK70.08 Sq.mts. ( 754 Sq.ft. )5
5 Booked100% Booked
100% Booked
3 BHK88.64 Sq.mts. ( 954 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK95.25 Sq.mts. ( 1025 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK99.23 Sq.mts. ( 1068 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK104.93 Sq.mts. ( 1129 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK107.91 Sq.mts. ( 1162 Sq.ft. )4
2 Booked50% Booked
50% Booked
3 BHK110.76 Sq.mts. ( 1192 Sq.ft. )6
5 Booked83% Booked
83% Booked
3 BHK111.95 Sq.mts. ( 1205 Sq.ft. )2
2 Booked100% Booked
100% Booked
3.5 BHK121.63 Sq.mts. ( 1309 Sq.ft. )1
1 Booked100% Booked
100% Booked
31 total apartments / 28 apartments booked. 90% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress58% done
58% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress52% done
52% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress52% done
52% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress27% done
27% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress27% done
27% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress58% done
58% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress58% done
58% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress58% done
58% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CDec 202512110300
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK104.4 Sq.mts. ( 1124 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK106.18 Sq.mts. ( 1143 Sq.ft. )7
4 Booked57% Booked
57% Booked
3 BHK109.4 Sq.mts. ( 1178 Sq.ft. )8
8 Booked100% Booked
100% Booked
3 BHK111.22 Sq.mts. ( 1197 Sq.ft. )2
2 Booked100% Booked
100% Booked
4 BHK142.47 Sq.mts. ( 1534 Sq.ft. )1
None Booked0% Booked
0% Booked
19 total apartments / 14 apartments booked. 73% apartments booked.
Work Description in Building Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress73% done
73% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress52% done
52% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress52% done
52% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress29% done
29% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress29% done
29% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress58% done
58% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress58% done
58% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress73% done
73% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing DDec 202512110300
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK41.37 Sq.mts. ( 445 Sq.ft. )5
5 Booked100% Booked
100% Booked
1 BHK44.25 Sq.mts. ( 476 Sq.ft. )3
3 Booked100% Booked
100% Booked
1 BHK46.53 Sq.mts. ( 501 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK51.51 Sq.mts. ( 554 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK55.59 Sq.mts. ( 598 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK106.03 Sq.mts. ( 1141 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK108.86 Sq.mts. ( 1172 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK119.44 Sq.mts. ( 1286 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK122.66 Sq.mts. ( 1320 Sq.ft. )5
5 Booked100% Booked
100% Booked
3 BHK125.25 Sq.mts. ( 1348 Sq.ft. )1
1 Booked100% Booked
100% Booked
4 BHK130.71 Sq.mts. ( 1407 Sq.ft. )1
1 Booked100% Booked
100% Booked
4 BHK145.12 Sq.mts. ( 1562 Sq.ft. )8
2 Booked25% Booked
25% Booked
4 BHK120.37 Sq.mts. ( 1296 Sq.ft. )1
None Booked0% Booked
0% Booked
4 BHK111.79 Sq.mts. ( 1203 Sq.ft. )1
None Booked0% Booked
0% Booked
32 total apartments / 22 apartments booked. 68% apartments booked.
Work Description in Building Wing DCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress78% done
78% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress62% done
62% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress62% done
62% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress65% done
65% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress65% done
65% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress84% done
84% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress84% done
84% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress78% done
78% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Project Consultants
Channel Partners Registered by Developer
Arkade Developers
for Project
Arkade Aura
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Arkade Developers

Arkade Group has metamorphosed into a leading real estate developer in Mumbai. Spearheaded by Amit Jain, the group has scaled the heights of Mumbai realty through sheer determination and dedication. As an entity that believes in moving ahead with the times, we ensure a constant upkeep of technological advances in the industry. With a flexible approach, we're better equipped to meet changing demands of the realty sector.