Windermere Project at Bhayandar by Ashish Group (P51700049440)
  • Rating:
  • ()

Windermere - Bhayandar

Ashish Group
Project Details, Configuration & Prices
1 BHK548 Sq.ft. Carpet ₹ 88 Lacs ++
2 BHK500 Sq.ft. Carpet ₹ 78 Lacs ++
2 BHK758 Sq.ft. Carpet ₹ 1.21 Cr ++
Project overview
Windermere Project at Bhayandar by Ashish Group (P51700049440) is a RERA approved Under Construction Project with RERA ID P51700049440 slated to be ready for possession by Dec 2028 with 1/2 BHK apartments / Flats starting from ₹ 80.5 Lakh onwards

Passcode Western Dream is a Residential Project Developed by Ashish Group. It is located at Bhayandar. The area is well-connected to other parts of Mumbai and Thane through road and rail networks. The Western Express Highway runs nearby, providing easy access to Mumbai and other suburbs. The upcoming development of Under construction Metro Line 9 Extension to provide fast & efficient transportation. Just 9-12 minutes from Bhayandar and Mira Road Station. Passcode Western Dream consists of 5 tower each 33 storey with 1 and 2 BHK Residences. Well ventilated apartments with mesmerising views and Decks. Spiritual Zone, Temple, Schools, Colleges, Hospitals & Malls etc are nearby located. Integrated Township with a serene and peaceful living environment away from the city's hustle and bustle. Luxurious amenities which includes Swimming Pool, Gymnasium, Multipurpose Court, Landscape Green Area, Children's Play Area, 2 Banquet Hall & Many More.
Windermere QR Code
Windermere
MahaRERA - P51700049440

Kanakia Beverly Heights

₹ 97.75 Lacs. onwards
Bhayandar
2 BHK apartments
View Details

Opulence

₹ 3.91 Crs. onwards
Bhayandar
3/4/6 BHK apartments
View Details

Grand Empire

₹ 80.5 Lacs. onwards
Bhayandar
1/2 BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    Windermere
  • Location:
  • Bhayandar, Shree Maheshwari Bhavan Road, Off Mira-Bhayandar Mahanagar Palika Fire Brigade
  • Const. Stage:
    Under Construction
  • Possession:
    Dec 2028
  • Floors:
    33
Developer Details

Ashish Group

  • Developer:
    Ashish Group
  • Phone:
    022 43439900
  • Website:
    www.ashishestates.com
  • Address:
  • 115, Maker chamber 3, narimal point, mumbai 21.
Project Ratings
Project Brochures
Brochures of Windermereby Ashish Group
Project Brochures
  • MPE/Brochures/30288/E brochure Windermere Brochure.pdf
  • MPE/Brochures/30288/Windermere Amenities Brochure.pdf
  • MPE/Brochures/30288/Western Dream Brochure 13 x 19 inches 23062023.pdf
Project Amenities
Amenities offred in Windermere
LIFESTYLE AMENITIES
Power BackupOutdoor GamesLandscaped gardenJogging TrackHigh speed elevatorsGrand entrance lobbyGymnasiumIntercom/CCTVVideo Door PhonesAluminium Sliding WindowsPOP finished wallsImported Sanitary FittingsConcealed WiringMarble flooringVitrified flooringGranite PlatformSecurity Help DeskReception Desk
Project RERA Details
RERA Project Status New
Proposed Possession 31 Dec 2027
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51700049440
RERA Project Name Windermere Building No 1 To 6
RERA Location New S. No./Old S. No./ H.No. 221/564/1,3,4A,4B,8. New S. No/Old S. No/ H.No/220/565/1,4,6,7,8,9,10. New S. No/Old S. No/H.No/267/567/1,2/1. New S. No/Old S. No/245/579/1A,1B,2,3A,3B,3C,4,5,6,7,8. New S. No/Old S.No/H.No. 222/580/1,2,6
RERA Developer A G Superstructures Pvt Ltd
Project RERA Details
Project Type Residential / Group Housing
Funding Bank ICICI BANK LIMITED
Last Modified 17 Apr 2025
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Bhayandar

Facilities & Amenities
Facilities, Amenities & Common areas details of Windermerelast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Only Meter Room Will Be Provided
Energy management
Led Fittings Will Be Used
Fire Protection And Fire Safety Requirements
As Per Mbmc Cfo Noc
Landscaping & Tree Planting
Soft And Hard Scope
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Connection To Mbmc Line
Solid Waste Management And Disposal
Common Garbage Disposal System
Storm Water Drains
Connection To Mbmc
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Stp Outside Building Line
Water Conservation, Rain water Harvesting
Collection Tank Outside Building Line
Water Supply
Mbmc Supply Line
Buildings / Wings in Windermere
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Windermereby Ashish Grouplast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

65036 Sq. ft.

Project Area

5795 Sq. ft.

Recreational Open Space

Total 6

Wings / Towers in Project

Apartments Statistics

154 apartments in total
Total
154
Booked
63
Available
91

Saleable Area Statistics (Sq. ft.)

76998 Total
Total
76998
Booked
31499
Available
45499
Total 154 apartments in project. 63 apartments booked. 40% apartments booked.
Total 7153.3 saleable area. 2926.35 apartments booked.
41% area booked.

Windermere Building No 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Windermere Building No 1Dec 202771010820
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK46.45 Sq.mts. ( 500 Sq.ft. )28
20 Booked71% Booked
71% Booked
28 total apartments / 20 apartments booked. 71% apartments booked.
Work Description in Building Windermere Building No 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress25% done
25% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress41% done
41% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Windermere Building No 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Windermere Building No 2Dec 202771010820
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK46.45 Sq.mts. ( 500 Sq.ft. )28
28 total apartments / 4 apartments booked. 14% apartments booked.
Work Description in Building Windermere Building No 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress25% done
25% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress40% done
40% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress90% done
90% Booked

Windermere Building No 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Windermere Building No 3Dec 202771010820
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK46.45 Sq.mts. ( 500 Sq.ft. )28
12 Booked42% Booked
42% Booked
28 total apartments / 12 apartments booked. 42% apartments booked.
Work Description in Building Windermere Building No 3Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress35% done
35% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress50% done
50% Booked

Windermere Building No 4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Windermere Building No 4Dec 202771010424
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK46.45 Sq.mts. ( 500 Sq.ft. )28
20 Booked71% Booked
71% Booked
28 total apartments / 20 apartments booked. 71% apartments booked.
Work Description in Building Windermere Building No 4Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress65% done
65% Booked

Windermere Building No 5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Windermere Building No 5Dec 202771010014
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK46.45 Sq.mts. ( 500 Sq.ft. )14
6 Booked42% Booked
42% Booked
14 total apartments / 6 apartments booked. 42% apartments booked.
Work Description in Building Windermere Building No 5Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress38% done
38% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress75% done
75% Booked

Windermere Building No 6

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Windermere Building No 6Dec 202771010226
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK46.45 Sq.mts. ( 500 Sq.ft. )28
28 total apartments / 1 apartments booked. 3% apartments booked.
Work Description in Building Windermere Building No 6Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress90% done
90% Booked
Project Consultants
Channel Partners Registered by Developer
Ashish Group
for Project
Windermere Building No 1 To 6
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Ashish Group

Ashish Group Since 1978 in the past 37 years, our group has successfully completed and handed over real estate projects totalling 5 million square feet. The current projects on hand are 1 million square feet and are at various stages of construction. The future projects are planned at Juhu, Goregaon, Malad, Thane, Lonavala and at Alibaug. Our Construction group consists of a strong team of civil engineers, architects, engineering stall, executive staff, sales team and administrative personnel. All the members of the team have been with the group for several years and have a rich experience in real estate development.