Vinay Unique Gardens Project at Virar by Vinay Unique Construction Co. (P99000012052)
  • Rating: 4.3
  • (2)

Vinay Unique Gardens - Virar

Vinay Unique Construction Co.
Project Details, Configuration & Prices (Exclusive of Stamp Duty Charges, GST Charges, Registration Charges & Maintenance Charges)
1 BHK-613 Sq.ft.
₹23.28 Lacs
1 BHK-663 Sq.ft.
₹25.18 Lacs
2 BHK-855 Sq.ft.
₹32.48 Lacs
2 BHK-866 Sq.ft.
₹32.89 Lacs
2 BHK-943 Sq.ft.
₹35.82 Lacs
2 BHK-1025 Sq.ft.
₹38.93 Lacs
3 BHK-1338 Sq.ft.
₹50.83 Lacs
Project overview
Vinay Unique Gardens Project at Virar by Vinay Unique Construction Co. (P99000012052) a Sold Out Project with 1/2/3 BHK apartments / Flats starting from ₹ 23.29 Lakh onwards

Vinay Unique Gardens is one of the projects developed by Vinay Unique Construction Co. Vinay Unique Gardens offers 1,2 & 3 bhk Flats for Sale in Virar with all amenities such as podium parking, clubhouse, 5 big gardens, swimming pool, gymnasium, Kids play area & much more...
Vinay Unique Gardens QR Code
Vinay Unique Gardens
MahaRERA - P99000012052

Rustomjee Avenue L4

₹ 50.68 Lacs. onwards
Virar
1/2 BHK apartments
View Details

Ekta Parksville

₹ 44.7 Lacs. onwards
Virar
2/3 BHK apartments
View Details

Brooklyn Park

₹ 44.27 Lacs. onwards
Virar
2 BHK apartments
View Details

Poonam Imperial

₹ 32 Lacs. onwards
Virar
1/2 BHK apartments
View Details

Sky City

₹ 29.01 Lacs. onwards
Virar
1/2 BHK apartments
View Details

Poonam Vista

₹ 40.6 Lacs. onwards
Virar
1/2/3 BHK apartments
View Details

Paradise Grandeur

₹ 71.8 Lacs. onwards
Virar
2/3 BHK apartments
View Details

Yash Platina

₹ 41 Lacs. onwards
Virar
1/1½/2 BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    Vinay Unique Gardens
  • Location:
  • Virar, Near Rustomjee Global City, Chikaldongre Road
  • Const. Stage:
    Sold Out
  • Possession:
  • Parking:
    Open;
  • Floors:
    15
Developer Details

Vinay Unique Construction Co.

  • Developer:
    Vinay Unique Construction Co.
  • Phone:
    0250 6298444
  • Website:
    www.vinayunique.com
  • Address:
  • Vinay Unique Gardens,HDIL layout Sector no 2 Near Global City,Virar (West).
Project Ratings
Project Amenities
Amenities offred in Vinay Unique Gardens
LIFESTYLE AMENITIES
Health ClubSwimming PoolJogging TrackLandscaped gardenGymnasiumHigh speed elevatorsKid's play areaPOP finished wallsVitrified flooringGranite Platform
Project RERA Details
RERA Project Status Ongoing
Proposed Possession 31 Dec 2019
Revised Possession 31 Dec 2019
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P99000012052
RERA Project Name Vinay Unique Gardens
RERA Location 93-2, 94-1,2,3,4,5,6,7,8, 96-1,7A,7B
RERA Developer Vinayunique Developers
Architect Mr Ajay Wade
Project RERA Details
Project Type Residential / Group Housing
Funding Bank AXIS BANK
Last Modified 01 Sep 2017
Last Retrived 28 Jul 2025

Most active Channel Partners, Real Estate Agents in Virar

Facilities & Amenities
Facilities, Amenities & Common areas details of Vinay Unique Gardenslast updated on 28 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station40% completed
40% Complete
There Will No Receiving Station
Energy management
Na
Fire Protection And Fire Safety Requirements50% completed
50% Complete
Na
Landscaping & Tree Planting50% completed
50% Complete
Facility Available In Larger Layout
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)90% completed
90% Complete
Na
Solid Waste Management And Disposal
Na
Storm Water Drains50% completed
50% Complete
Facility Available In Larger Layout
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water40% completed
40% Complete
Na
Water Conservation, Rain water Harvesting40% completed
40% Complete
Na
Water Supply40% completed
40% Complete
Facility Will Start Once Vvcmc Water Supply Starts
Buildings / Wings in Vinay Unique Gardens
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Vinay Unique Gardensby Vinay Unique Construction Co.last updated on 28 Jul 2025 as per information obtained from MARA RERA. Disclaimer

106100 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 10

Wings / Towers in Project

Apartments Statistics

754 apartments in total
Total
754
Booked
425
Available
329

Saleable Area Statistics (Sq. ft.)

316209 Total
Total
316209
Booked
167135
Available
149074
Total 754 apartments in project. 425 apartments booked. 56% apartments booked.
Total 29376.53 saleable area. 15527.26 apartments booked.
53% area booked.

Vinay Unique Gardens Bldg No 11 A Wing Hyde Park

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Vinay Unique Gardens Bldg No 11 A Wing Hyde ParkJan 1900161011029
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK45.4 Sq.mts. ( 489 Sq.ft. )12
2 BHK45.9 Sq.mts. ( 494 Sq.ft. )14
2 BHK50.7 Sq.mts. ( 546 Sq.ft. )28
54 total apartments / 5 apartments booked. 9% apartments booked.
Work Description in Building Vinay Unique Gardens Bldg No 11 A Wing Hyde ParkCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress75% done
75% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress30% done
30% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress30% done
30% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress50% done
50% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress73% done
73% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress75% done
75% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress75% done
75% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress75% done
75% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Vinay Unique Gardens Bldg No 11 B Wing Hyde Park

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Vinay Unique Gardens Bldg No 11 B Wing Hyde ParkJan 1900161011040
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.43 Sq.mts. ( 338 Sq.ft. )54
37 Booked68% Booked
68% Booked
2 BHK38.02 Sq.mts. ( 409 Sq.ft. )14
12 Booked85% Booked
85% Booked
3 BHK74.28 Sq.mts. ( 800 Sq.ft. )14
82 total apartments / 50 apartments booked. 60% apartments booked.
Work Description in Building Vinay Unique Gardens Bldg No 11 B Wing Hyde ParkCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress95% done
95% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress50% done
50% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress88% done
88% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress60% done
60% Booked
Sanitary Fittings within the flats / premises
work-in-progress60% done
60% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress75% done
75% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress75% done
75% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress95% done
95% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Vinay Unique Gardens Bldg No 11 C Wing Hyde Park

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Vinay Unique Gardens Bldg No 11 C Wing Hyde ParkJan 1900161011026
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.43 Sq.mts. ( 338 Sq.ft. )56
34 Booked60% Booked
60% Booked
2 BHK45.5 Sq.mts. ( 490 Sq.ft. )15
9 Booked60% Booked
60% Booked
2 BHK50.7 Sq.mts. ( 546 Sq.ft. )28
SHOP11.23 Sq.mts. ( 121 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP11.48 Sq.mts. ( 124 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP14.5 Sq.mts. ( 156 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP14.74 Sq.mts. ( 159 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP15.23 Sq.mts. ( 164 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP16.21 Sq.mts. ( 174 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP16.78 Sq.mts. ( 181 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP20.31 Sq.mts. ( 219 Sq.ft. )1
None Booked0% Booked
0% Booked
107 total apartments / 52 apartments booked. 48% apartments booked.
Work Description in Building Vinay Unique Gardens Bldg No 11 C Wing Hyde ParkCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress75% done
75% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress30% done
30% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress30% done
30% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress50% done
50% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress73% done
73% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress75% done
75% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress75% done
75% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress75% done
75% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Vinay Unique Gardens Bldg No 11 D Wing Hyde Park

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Vinay Unique Gardens Bldg No 11 D Wing Hyde ParkJan 1900161011013
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK50.7 Sq.mts. ( 546 Sq.ft. )56
31 Booked55% Booked
55% Booked
SHOP9.96 Sq.mts. ( 107 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP11.12 Sq.mts. ( 120 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP11.58 Sq.mts. ( 125 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP13.49 Sq.mts. ( 145 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP13.76 Sq.mts. ( 148 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP17.31 Sq.mts. ( 186 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP17.52 Sq.mts. ( 189 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP17.83 Sq.mts. ( 192 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP18.45 Sq.mts. ( 199 Sq.ft. )1
None Booked0% Booked
0% Booked
65 total apartments / 34 apartments booked. 52% apartments booked.
Work Description in Building Vinay Unique Gardens Bldg No 11 D Wing Hyde ParkCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress95% done
95% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress50% done
50% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress88% done
88% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress60% done
60% Booked
Sanitary Fittings within the flats / premises
work-in-progress60% done
60% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress75% done
75% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress75% done
75% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress95% done
95% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Vinay Unique Gardens Bldg No 11 E Wing Hyde Park

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Vinay Unique Gardens Bldg No 11 E Wing Hyde ParkJan 1900161011010
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.43 Sq.mts. ( 338 Sq.ft. )28
28 Booked100% Booked
100% Booked
1 BHK34.6 Sq.mts. ( 372 Sq.ft. )28
27 Booked96% Booked
96% Booked
SHOP10.83 Sq.mts. ( 117 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP14.07 Sq.mts. ( 151 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP14.21 Sq.mts. ( 153 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP14.29 Sq.mts. ( 154 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP15.26 Sq.mts. ( 164 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP19.65 Sq.mts. ( 212 Sq.ft. )1
None Booked0% Booked
0% Booked
62 total apartments / 57 apartments booked. 91% apartments booked.
Work Description in Building Vinay Unique Gardens Bldg No 11 E Wing Hyde ParkCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress95% done
95% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress50% done
50% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress88% done
88% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress60% done
60% Booked
Sanitary Fittings within the flats / premises
work-in-progress60% done
60% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress75% done
75% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress75% done
75% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress95% done
95% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Vinay Unique Gardens Bldg No 12 F Wing Hyde Park

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Vinay Unique Gardens Bldg No 12 F Wing Hyde ParkJan 1900161011010
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.6 Sq.mts. ( 372 Sq.ft. )54
51 Booked94% Booked
94% Booked
2 BHK45 Sq.mts. ( 484 Sq.ft. )15
14 Booked93% Booked
93% Booked
3 BHK74.28 Sq.mts. ( 800 Sq.ft. )15
7 Booked46% Booked
46% Booked
SHOP12.84 Sq.mts. ( 138 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP13.4 Sq.mts. ( 144 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP17.04 Sq.mts. ( 183 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP17.87 Sq.mts. ( 192 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP17.93 Sq.mts. ( 193 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP18.89 Sq.mts. ( 203 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP19.17 Sq.mts. ( 206 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP19.59 Sq.mts. ( 211 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP25.18 Sq.mts. ( 271 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP25.56 Sq.mts. ( 275 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP25.83 Sq.mts. ( 278 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP27.06 Sq.mts. ( 291 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP27.09 Sq.mts. ( 292 Sq.ft. )1
None Booked0% Booked
0% Booked
97 total apartments / 74 apartments booked. 76% apartments booked.
Work Description in Building Vinay Unique Gardens Bldg No 12 F Wing Hyde ParkCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress95% done
95% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress50% done
50% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress88% done
88% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress60% done
60% Booked
Sanitary Fittings within the flats / premises
work-in-progress60% done
60% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress75% done
75% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress75% done
75% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress95% done
95% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Vinay Unique Gardens Bldg No 12 G Wing Hyde Park

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Vinay Unique Gardens Bldg No 12 G Wing Hyde ParkJan 1900161011010
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.43 Sq.mts. ( 338 Sq.ft. )28
27 Booked96% Booked
96% Booked
1 BHK34.6 Sq.mts. ( 372 Sq.ft. )28
24 Booked85% Booked
85% Booked
SHOP17 Sq.mts. ( 183 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP18.61 Sq.mts. ( 200 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP18.66 Sq.mts. ( 201 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP20.18 Sq.mts. ( 217 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP21.2 Sq.mts. ( 228 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP21.76 Sq.mts. ( 234 Sq.ft. )1
1 Booked100% Booked
100% Booked
62 total apartments / 54 apartments booked. 87% apartments booked.
Work Description in Building Vinay Unique Gardens Bldg No 12 G Wing Hyde ParkCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress95% done
95% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress50% done
50% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress88% done
88% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress60% done
60% Booked
Sanitary Fittings within the flats / premises
work-in-progress60% done
60% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress75% done
75% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress75% done
75% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress95% done
95% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Vinay Unique Gardens Bldg No 12 H Wing Hyde Park

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Vinay Unique Gardens Bldg No 12 H Wing Hyde ParkJan 1900161011010
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.43 Sq.mts. ( 338 Sq.ft. )28
22 Booked78% Booked
78% Booked
1 BHK34.6 Sq.mts. ( 372 Sq.ft. )28
20 Booked71% Booked
71% Booked
SHOP14.38 Sq.mts. ( 155 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP15.7 Sq.mts. ( 169 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP16.99 Sq.mts. ( 183 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP18.02 Sq.mts. ( 194 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP18.58 Sq.mts. ( 200 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP19.62 Sq.mts. ( 211 Sq.ft. )1
None Booked0% Booked
0% Booked
62 total apartments / 42 apartments booked. 67% apartments booked.
Work Description in Building Vinay Unique Gardens Bldg No 12 H Wing Hyde ParkCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress95% done
95% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress50% done
50% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress88% done
88% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress60% done
60% Booked
Sanitary Fittings within the flats / premises
work-in-progress60% done
60% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress75% done
75% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress75% done
75% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress95% done
95% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Vinay Unique Gardens Bldg No 12 I Wing Hyde Park

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Vinay Unique Gardens Bldg No 12 I Wing Hyde ParkJan 1900161011026
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.43 Sq.mts. ( 338 Sq.ft. )56
26 Booked46% Booked
46% Booked
2 BHK45.5 Sq.mts. ( 490 Sq.ft. )15
14 Booked93% Booked
93% Booked
2 BHK50.7 Sq.mts. ( 546 Sq.ft. )28
SHOP36.73 Sq.mts. ( 395 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP39.54 Sq.mts. ( 426 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP19.21 Sq.mts. ( 207 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP20.19 Sq.mts. ( 217 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP22.73 Sq.mts. ( 245 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP23.89 Sq.mts. ( 257 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP25.32 Sq.mts. ( 273 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP27.14 Sq.mts. ( 292 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP28.05 Sq.mts. ( 302 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP31.27 Sq.mts. ( 337 Sq.ft. )1
None Booked0% Booked
0% Booked
109 total apartments / 44 apartments booked. 40% apartments booked.
Work Description in Building Vinay Unique Gardens Bldg No 12 I Wing Hyde ParkCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress75% done
75% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress30% done
30% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress30% done
30% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress50% done
50% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress73% done
73% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress75% done
75% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress75% done
75% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress75% done
75% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Vinay Unique Gardens Bldg No 12 J Wing Hyde Park

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Vinay Unique Gardens Bldg No 12 J Wing Hyde ParkJan 1900161011030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK46.3 Sq.mts. ( 498 Sq.ft. )12
3 Booked25% Booked
25% Booked
2 BHK46.8 Sq.mts. ( 504 Sq.ft. )14
4 Booked28% Booked
28% Booked
2 BHK50.7 Sq.mts. ( 546 Sq.ft. )28
6 Booked21% Booked
21% Booked
54 total apartments / 13 apartments booked. 24% apartments booked.
Work Description in Building Vinay Unique Gardens Bldg No 12 J Wing Hyde ParkCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress75% done
75% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress30% done
30% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress30% done
30% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress50% done
50% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress73% done
73% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress75% done
75% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress75% done
75% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress75% done
75% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Project Consultants
Channel Partners Registered by Developer
Vinay Unique Construction Co.
for Project
Vinay Unique Gardens
last updated on 28 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Vinay Unique Construction Co.

Vinay Unique Construction Co. Vinay Unique Group is a collaborative venture between Vinay Group of Companies and Unique Group of Companies, two of the leading Real Estate players reputed for providing incremental value to the Home and Commercial space buyers. Coming together of these two leaders in construction space symbolises synergies emanating out of a passion to create complete homes- beyond imagination, yet well within the budget- for their customers. To realise this common vision, they have pooled in their strategic strengths and a land bank which is exceptionally well connected to the Mumbai’s Business Districts, yet retains the quintessential countryside charm for a fulfilling living.