Vicinia Project at Powai by Shapoorji Pallonji Real Estate (P51800002564)
  • Rating: 4.8
  • (239)

Vicinia - Powai

Shapoorji Pallonji Real Estate
Project Details, Configuration & Prices
2 BHK671 Sq.ft. Carpet ₹ 2.15 Cr (All Incl.) Hill Facing
2 BHK671 Sq.ft. Carpet ₹ 2.32 Cr (All Incl.) Club Facing
2 BHK888 Sq.ft. Carpet ₹ 2.55 Cr (All Incl.) Hill Facing
2 BHK888 Sq.ft. Carpet ₹ 2.78 Cr (All Incl.) Club Facing
3 BHK1016 Sq.ft. Carpet ₹ 3.23 Cr (All Incl.) Hill Facing
3 BHK1068 Sq.ft. Carpet ₹ 3.78 Cr (All Incl.) Club Facing
3½ BHK1645 Sq.ft. Carpet ₹ 5.10 Cr (All Incl.)
Project overview

Vicinia Project at Powai by Shapoorji Pallonji Real Estate (P51800002564) is a RERA approved Under Construction Project with REAR IDP51800002564 slated to be ready for possession by Dec 2021 with 2/3/3½ BHK apartments / Flats starting from 21500182 onwards.

Vicinia is a 22 storeys Under Construction Project and the location is Chandivali Road, Off Saki Vihar Road, Powai and is developed by Shapoorji Pallonji Real Estate. Vicinia was launched in Feb 2015 and the possession of the same is likely to be in June 2020.

Vicinia is Surrounded by city’s best Schools and Colleges such as Hiranandani School, Bombay Scottish, Podar International School, IIT Bombay, ICFAI Biz School etc. In close proximity of renowned Hospitals such as Hiranandani Hospital, Seven Hills Hospital, etc. and Haiko Mall, D Mart, R- City mall, Restaurants, Banks & ATMs.

Brief Details of Vicinia:

  • Plot Size: 6.73 Acres | Construction In 5.03 ACRES | 1.7 Acre Car Free Zone At Ground Level
  • 8 Towers 3 Basements / Stilt  / 20 /21 /22 Storeyed
  • Architect: Kiran Kapadia Associates Pvt. Ltd. / Landscape : Site Cconcepts Singapore
  • Construction By Shapoorji Happening In Full Swing
  • Sample Apartment Ready & Experience Center Ready
  • Typology: 2 BHK 671 C.A /2BHK 888 C.A./ 3BHK -1016 C.A /3BHK 1068 C.A./ 3.5 BHK 1645 C.A.
  • Exclusive 1% bank subvention schemes also available.

Vicinia has 3 levels of basement and stilt type of car parking available. Vicinia has its Sample flats ready. Vicinia has 8 towers, A, B, C, D, E & F have RERA POSESSION JUNE 2020, G & H RERA POSESSION 2021.

Vicinia has 2BHK & 3 BHK Premium and 3.5 BHK Luxury residences Spacious Bedroom and living room designed to bring in ample sunlight and cross ventilation.

Vicinia is RERA approved has the Registration Number bearing P51800002564.

The property prices in Powai are in the range of 17000 to 25000 for Outright for ready and under construction projects.

Shapoorji Pallonji Real Estate currently has 3 Under Construction projects.

Vicinia has good reviews and the ratings of this project are approximately 5 out of 5.

You can download the brochure of Vicinia and you can see the latest digital pictures, Floor Plans, Location Plans & Rate History on our website. The Bookings for the Under Construction project Vicinia are open and we can set up a Site Visit any time at your Convenience.

Sara

₹ 59.93 Lacs. onwards
Powai
1 RK/2 BHK apartments
View Details

L&T Emerald Isle Tower 15

₹ 1.76 Crs. onwards
Powai
2/3 BHK apartments
View Details

L&T Emerald Isle Tower 16

₹ 2.06 Crs. onwards
Powai
2/3/4 BHK apartments
View Details

Hiranandani Regent Hill

₹ 1.43 Crs. onwards
Powai
1 BHK apartments
View Details

Hiranandani Castle Rock

₹ 2.81 Crs. onwards
Powai
2 BHK apartments
View Details

L&T Emerald Isle Tower 10

₹ 1.76 Crs. onwards
Powai
2/3 BHK apartments
View Details

Ekta Lake Riviera

₹ 2.14 Crs. onwards
Powai
2/3 BHK apartments
View Details

L&T Emerald Isle Tower 9

₹ 1.77 Crs. onwards
Powai
2/3 BHK apartments
View Details
Project Details
Project details were last updated in Mar 2021
  • Project:
    Vicinia
  • Location:
  • Powai, Chandivali Road, Off Saki Vihar Road
  • Const. Stage:
    Under Construction
  • Possession:
    Dec 2021
  • Parking:
    Open Reserved;
  • Floor:
    22
Developer Details

Shapoorji Pallonji Real Estate

  • Developer:
    Shapoorji Pallonji Real Estate
  • Phone:
    022 67490000
  • Website:
    www.shapoorjirealestate.com
  • Address:
  • SP Centre, 41/44, Minoo Desai Marg, Colaba, Mumbai 400 005, India.
Project Ratings
Project Brochures
Brochures of Viciniaby Shapoorji Pallonji Real Estate
Project Brochures
  • 12217 VICINIA latest presenter .pdf
  • 12217 VICINIA latest presenter .pdf
Project Amenities
Amenities offred in Vicinia
LIFESTYLE AMENITIES
Swimming PoolClub HouseGymnasiumHigh speed elevatorsJogging TrackLandscaped gardenIndoor GamesKid's play areaPower BackupVitrified flooringConcealed WiringImported Sanitary FittingsPOP finished wallsIntercom/CCTVGranite PlatformPet AreaSecurity Help DeskYoga Room
Project RERA Details
RERA Project Status On-Going Project
Proposed Possession 30 Jun 2021
Revised Possession 30 Dec 2021
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA REARA No: P51800002564
RERA Project Name Vicinia
RERA Location Powai Vihar Road, Chandivali Andheri East, Kurla, Kurla, Mumbai Suburban, 400072
RERA Developer Forbes &Amp; Company Limited
Architect Brighton Architects India Pvt Ltd
Project RERA Details
Project Type Residential
Funding Bank Axis Bank Limited
Last Modified 12 Oct 2020
Last Retrived 22 Oct 2020
Facilities & Amenities
Facilities, Amenities & Common areas details of Vicinialast updated on 15/06/2020 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Common For 8 Wings
Community Buildings
Club House Common For 8 Wings
Community Buildings Sports Center
Common For 8 Wings
Covered car parkings85% completed
85% Complete
1108 Covered Car Parks Approved Proposed 1200 Nos
Electrical Meter Room, Sub-Station, Receiving Station80% completed
80% Complete
Common Sub-Station Proposed For 8 Wings
Energy management48% completed
48% Complete
Solar Energy System Proposed
Fire Protection And Fire Safety Requirements59% completed
59% Complete
Common For 8 Wings
Landscaping & Tree Planting30% completed
30% Complete
Common For 8 Wings
Open Parking
249 - Visitor Parking
Sewerage (Chamber, Lines, Septic Tank , STP)31% completed
31% Complete
Common For 8 Wings
Solid Waste Management And Disposal50% completed
50% Complete
Common For 8 Wings
Storm Water Drains50% completed
50% Complete
Common For 8 Wings
Street Lighting
Common For 8 Wings
Treatment And Disposal Of Sewage And Sullage Water
Common For 8 Wings
Water Conservation, Rain water Harvesting100% completed
95% Complete
Common For 8 Wings
Water Supply28% completed
28% Complete
To Be Provided By Mcgm After Oc
Buildings / Wings in Vicinia
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Viciniaby Shapoorji Pallonji Real Estatelast updated on 15/06/2020 as per information obtained from MARA RERA. Disclaimer

293464 Sq. ft.

Project Area

60989 Sq. ft.

Recreational Open Space

Total 8

Wings / Towers in Project

Apartments Statistics

588 apartments in total
Total
588
Booked
395
Available
193

Saleable Area Statistics (Sq. ft.)

544470 Total
Total
544470
Booked
381173
Available
163298
Total 588 apartments in project. 395 apartments booked. 67% apartments booked.
Total 50582.52 saleable area. 35411.81 apartments booked.
70% area booked.

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing AJun 20212113102080
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL140.15 Sq.mts. ( 1509 Sq.ft. )34
27 Booked79% Booked
79% Booked
RESIDENTIAL140.81 Sq.mts. ( 1516 Sq.ft. )6
5 Booked83% Booked
83% Booked
40 total apartments / 32 apartments booked. 80% apartments booked.
Work Description in Building Wing ACompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress63% done
63% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress95% done
95% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress96% done
96% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress71% done
71% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BJun 20212113102080
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL140.15 Sq.mts. ( 1509 Sq.ft. )34
26 Booked76% Booked
76% Booked
RESIDENTIAL140.81 Sq.mts. ( 1516 Sq.ft. )6
4 Booked66% Booked
66% Booked
40 total apartments / 30 apartments booked. 75% apartments booked.
Work Description in Building Wing BCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress63% done
63% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress95% done
95% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress96% done
96% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress69% done
69% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CJun 202122131042168
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL77.98 Sq.mts. ( 839 Sq.ft. )42
37 Booked88% Booked
88% Booked
RESIDENTIAL89.9 Sq.mts. ( 968 Sq.ft. )21
20 Booked95% Booked
95% Booked
RESIDENTIAL94.72 Sq.mts. ( 1020 Sq.ft. )18
15 Booked83% Booked
83% Booked
RESIDENTIAL95.34 Sq.mts. ( 1026 Sq.ft. )3
2 Booked66% Booked
66% Booked
84 total apartments / 74 apartments booked. 88% apartments booked.
Work Description in Building Wing CCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress63% done
63% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress92% done
92% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress96% done
96% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress70% done
70% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing DJun 202122131042168
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL77.98 Sq.mts. ( 839 Sq.ft. )42
39 Booked92% Booked
92% Booked
RESIDENTIAL89.9 Sq.mts. ( 968 Sq.ft. )21
20 Booked95% Booked
95% Booked
RESIDENTIAL94.72 Sq.mts. ( 1020 Sq.ft. )18
17 Booked94% Booked
94% Booked
RESIDENTIAL95.34 Sq.mts. ( 1026 Sq.ft. )3
1 Booked33% Booked
33% Booked
84 total apartments / 77 apartments booked. 91% apartments booked.
Work Description in Building Wing DCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress63% done
63% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress88% done
88% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress96% done
96% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress68% done
68% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing EJun 202122131040161
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL38.49 Sq.mts. ( 414 Sq.ft. )2
None Booked0% Booked
0% Booked
RESIDENTIAL77.98 Sq.mts. ( 839 Sq.ft. )40
9 Booked22% Booked
22% Booked
RESIDENTIAL94.09 Sq.mts. ( 1013 Sq.ft. )19
9 Booked47% Booked
47% Booked
RESIDENTIAL94.72 Sq.mts. ( 1020 Sq.ft. )18
10 Booked55% Booked
55% Booked
RESIDENTIAL95.34 Sq.mts. ( 1026 Sq.ft. )3
1 Booked33% Booked
33% Booked
82 total apartments / 29 apartments booked. 35% apartments booked.
Work Description in Building Wing ECompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress36% done
36% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress82% done
82% Booked

Wing F

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing FJun 202122131041164
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL77.98 Sq.mts. ( 839 Sq.ft. )40
31 Booked77% Booked
77% Booked
RESIDENTIAL94.09 Sq.mts. ( 1013 Sq.ft. )21
20 Booked95% Booked
95% Booked
RESIDENTIAL94.72 Sq.mts. ( 1020 Sq.ft. )16
15 Booked93% Booked
93% Booked
RESIDENTIAL95.34 Sq.mts. ( 1026 Sq.ft. )3
3 Booked100% Booked
100% Booked
RESIDENTIAL106.47 Sq.mts. ( 1146 Sq.ft. )2
1 Booked50% Booked
50% Booked
82 total apartments / 70 apartments booked. 85% apartments booked.
Work Description in Building Wing FCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress64% done
64% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress85% done
85% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress95% done
95% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress63% done
63% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing G

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing GJun 20212213102288
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL62.33 Sq.mts. ( 671 Sq.ft. )88
48 Booked54% Booked
54% Booked
88 total apartments / 48 apartments booked. 54% apartments booked.
Work Description in Building Wing GCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress40% done
40% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress96% done
96% Booked

Wing H

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing HJun 20212213102288
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL62.33 Sq.mts. ( 671 Sq.ft. )88
35 Booked39% Booked
39% Booked
88 total apartments / 35 apartments booked. 39% apartments booked.
Work Description in Building Wing HCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress39% done
39% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress91% done
91% Booked
Project Consultants
Channel Partners Registered by Developer
Shapoorji Pallonji Real Estate
for Project
Vicinia
last updated on 15/06/2020 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Shapoorji Pallonji Real Estate

Shapoorji Pallonji Real Estate With a significant part to play in the 150-year journey of the Shapoorji Pallonji Group, we’ve built our reputation by building some of India’s iconic structures that have stood the test of time. Thoughtful design, combined with solid construction and the latest in engineering, we build structures that silently scream strength and stability, and last generations.