Vicenza Regency Project at Vikhroli by HPA Spaces (P51800011517)
  • Rating: 4.3
  • (2)

Vicenza Regency - Vikhroli

HPA Spaces
Project Details, Configuration & Prices (Exclusive of Stamp Duty Charges, GST Charges, Registration Charges & Maintenance Charges)
1 BHK-645 Sq.ft.
₹70.95 Lacs
1 BHK-720 Sq.ft.
₹79.20 Lacs
2 BHK-981 Sq.ft.
₹1.07 Crore
2 BHK-1016 Sq.ft.
₹1.11 Crore
Project overview
Vicenza Regency Project at Vikhroli by HPA Spaces (P51800011517) a Sold Out Project with 1/2 BHK apartments / Flats starting from ₹ 70.95 Lakh onwards

Vicenza Residency is one of the project developed by Paradigm Realty Pvt.Ltd. and has good surrounding. The 'Vicenza Regency' brings to Mumbai a new way of living, where spaces are planned to bring your world closer too you. With proposed luxury residential, commercial and retail options inhabiting the same space, life at 'Vicenza Regency' is designed to leave you with a lot more time to live it. Vicenza Regency is located just 5 minutes away from railway station & 5 minutes drive from Eastern Express Highway. Vicenza Regency is 33 Storied High Rise Building with Ground and three levels Podium Parking. Residential floor Starts from Forth Floor. Project consists of 3 wings. Wing-A is having 6 flats of 1BHK. Wing-B is having 2 flats of 1BHK & 4 flats for 2BHK. And Wing C is having 4 Flats for 1 BHK & 2 Flats of 2 BHK.
Vicenza Regency QR Code
Vicenza Regency
MahaRERA - P51800011517

Lodha Signet

₹ 1.09 Crs. onwards
Vikhroli
Office BHK apartments
View Details

Lodha Casa Evergreen

₹ 1.84 Crs. onwards
Vikhroli
2 BHK apartments
View Details
Vikhroli
2/3/4 BHK apartments
View Details

Golden Oak

₹ 1.09 Crs. onwards
Vikhroli
Office BHK apartments
View Details

Lodha Riservo

₹ 3.37 Crs. onwards
Vikhroli
2½/3 BHK apartments
View Details

Gurukrupa Darshanam

₹ 84.42 Lacs. onwards
Vikhroli
1/2/3 BHK apartments
View Details
Vikhroli
1/2/3 BHK apartments
View Details
Vikhroli
Office BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    Vicenza Regency
  • Location:
  • Vikhroli, Tagore Nagar No 4,Near Shankar Temple
  • Const. Stage:
    Sold Out
  • Possession:
    Dec 2018
  • Parking:
    Podium;
  • Floors:
    23
Developer Details

HPA Spaces

  • Developer:
    HPA Spaces
  • Phone:
    022 67983094
  • Website:
    www.hpaspaces.com
  • Address:
  • 703-706, Krushal Commercial Tower,Above Shopper's Stop, G. M. Road,Near Amar Mahal Junction, Chembur (W), Mumbai-400 089.
Project Ratings
Project Amenities
Amenities offred in Vicenza Regency
LIFESTYLE AMENITIES
GymnasiumKid's play areaLandscaped gardenPower BackupHigh speed elevatorsIndoor GamesPOP finished wallsVitrified flooringImported Sanitary FittingsGranite Platform
Project RERA Details
RERA Project Status Ongoing
Proposed Possession 01 Dec 2027
Revised Possession 01 Dec 2027
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800011517
RERA Project Name Vicenza Residency/Commercial
RERA Location Cts No 142 143 146 144 1 2 3 4 5 6 7 8
RERA Developer Ssv Builders And Developers Pvt Ltd
Architect Hemant Parikh & Associates
Project RERA Details
Project Type Others
Funding Bank
Last Modified 31 Aug 2017
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Vikhroli

Facilities & Amenities
Facilities, Amenities & Common areas details of Vicenza Regencylast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Shall Be Completed Prior To Oc
Electrical Meter Room, Sub-Station, Receiving Station
Under Ground Water Tank For Fire Protection Is On
Energy management30% completed
30% Complete
Shall Be Completed Prior To Oc
Fire Protection And Fire Safety Requirements30% completed
30% Complete
Provison Of Dg Set/Electric Meter Is On
Landscaping & Tree Planting
Shall Be Completed Prior To Oc
Open Parking
Shall Be Completed Prior To Oc
Sewerage (Chamber, Lines, Septic Tank , STP)30% completed
30% Complete
Construction Of Stp On
Solid Waste Management And Disposal30% completed
30% Complete
Construction Of Plinth Completed
Storm Water Drains
Plinth Completed
Street Lighting
Shall Be Completed Prior To Oc
Treatment And Disposal Of Sewage And Sullage Water30% completed
30% Complete
Shall Be Completed Prior To Oc
Water Conservation, Rain water Harvesting
Construction Of Plinth Completed
Water Supply
Shall Be Completed Prior To Oc
Buildings / Wings in Vicenza Regency
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Vicenza Regencyby HPA Spaceslast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

221471 Sq. ft.

Project Area

17718 Sq. ft.

Recreational Open Space

Total 7

Wings / Towers in Project

Apartments Statistics

2117 apartments in total
Total
2117
Booked
2117
Available
0

Saleable Area Statistics (Sq. ft.)

925591 Total
Total
925591
Booked
925591
Available
0
Total 2117 apartments in project. 2117 apartments booked. 100% apartments booked.
Total 85989.54 saleable area. 85989.54 apartments booked.
100% area booked.

Hindustan Chs / Sai Nath Chs/Gulistan Chs -Reside

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Hindustan Chs / Sai Nath Chs/Gulistan Chs -ResideJan 190023100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHk25 Sq.mts. ( 269 Sq.ft. )138
138 Booked100% Booked
100% Booked
138 total apartments / 138 apartments booked. 100% apartments booked.
Work Description in Building Hindustan Chs / Sai Nath Chs/Gulistan Chs -ResideCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Saishradhha Chs/Delux Chs-Residence-Commercial -S

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Saishradhha Chs/Delux Chs-Residence-Commercial -SJan 190023100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK25 Sq.mts. ( 269 Sq.ft. )138
138 Booked100% Booked
100% Booked
138 total apartments / 138 apartments booked. 100% apartments booked.
Work Description in Building Saishradhha Chs/Delux Chs-Residence-Commercial -SCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Sanjivani Chs-Residence-Commercial-Sale/Rehab- Co

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sanjivani Chs-Residence-Commercial-Sale/Rehab- CoJan 190023100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK25 Sq.mts. ( 269 Sq.ft. )184
184 Booked100% Booked
100% Booked
184 total apartments / 184 apartments booked. 100% apartments booked.
Work Description in Building Sanjivani Chs-Residence-Commercial-Sale/Rehab- CoCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Shankar Chs-Residence-Commercial-Sale/Rehab Compo

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shankar Chs-Residence-Commercial-Sale/Rehab CompoJan 190023100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK25 Sq.mts. ( 269 Sq.ft. )184
184 Booked100% Booked
100% Booked
184 total apartments / 184 apartments booked. 100% apartments booked.
Work Description in Building Shankar Chs-Residence-Commercial-Sale/Rehab CompoCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Shiv Chatrapati Chs-Residence-Commercial-Sale/Reh

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shiv Chatrapati Chs-Residence-Commercial-Sale/RehJan 190023100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK25 Sq.mts. ( 269 Sq.ft. )207
207 Booked100% Booked
100% Booked
207 total apartments / 207 apartments booked. 100% apartments booked.
Work Description in Building Shiv Chatrapati Chs-Residence-Commercial-Sale/RehCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Swami Samartha Chs-Residence-Commercial-Sale/Reha

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Swami Samartha Chs-Residence-Commercial-Sale/RehaJan 190023100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK25 Sq.mts. ( 269 Sq.ft. )184
184 Booked100% Booked
100% Booked
184 total apartments / 184 apartments booked. 100% apartments booked.
Work Description in Building Swami Samartha Chs-Residence-Commercial-Sale/RehaCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Vicenza Residency/Commercial A To F Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Vicenza Residency/Commercial A To F WingJan 190040100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK45.78 Sq.mts. ( 493 Sq.ft. )105
105 Booked100% Booked
100% Booked
1 BHK45.89 Sq.mts. ( 494 Sq.ft. )64
64 Booked100% Booked
100% Booked
1 BHK45.99 Sq.mts. ( 495 Sq.ft. )67
67 Booked100% Booked
100% Booked
1 BHK46.2 Sq.mts. ( 497 Sq.ft. )60
60 Booked100% Booked
100% Booked
1 BHK41.25 Sq.mts. ( 444 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK44.33 Sq.mts. ( 477 Sq.ft. )26
26 Booked100% Booked
100% Booked
1 BHK45.68 Sq.mts. ( 492 Sq.ft. )64
64 Booked100% Booked
100% Booked
1 BHK47.55 Sq.mts. ( 512 Sq.ft. )33
33 Booked100% Booked
100% Booked
1 BHK49.11 Sq.mts. ( 529 Sq.ft. )30
30 Booked100% Booked
100% Booked
2 BHK49.8 Sq.mts. ( 536 Sq.ft. )9
9 Booked100% Booked
100% Booked
2 BHK55.77 Sq.mts. ( 600 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK65.03 Sq.mts. ( 700 Sq.ft. )64
64 Booked100% Booked
100% Booked
2 BHK65.34 Sq.mts. ( 703 Sq.ft. )286
286 Booked100% Booked
100% Booked
2 BHK65.66 Sq.mts. ( 707 Sq.ft. )27
27 Booked100% Booked
100% Booked
2 BHK66.18 Sq.mts. ( 712 Sq.ft. )28
28 Booked100% Booked
100% Booked
2 BHK66.59 Sq.mts. ( 717 Sq.ft. )39
39 Booked100% Booked
100% Booked
2 BHK66.7 Sq.mts. ( 718 Sq.ft. )51
51 Booked100% Booked
100% Booked
2 BHK67.84 Sq.mts. ( 730 Sq.ft. )26
26 Booked100% Booked
100% Booked
2 BHK68.67 Sq.mts. ( 739 Sq.ft. )35
35 Booked100% Booked
100% Booked
Coffee Shop138.15 Sq.mts. ( 1487 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office46.2 Sq.mts. ( 497 Sq.ft. )4
4 Booked100% Booked
100% Booked
Office45.99 Sq.mts. ( 495 Sq.ft. )4
4 Booked100% Booked
100% Booked
Office45.89 Sq.mts. ( 494 Sq.ft. )4
4 Booked100% Booked
100% Booked
Office66.7 Sq.mts. ( 718 Sq.ft. )8
8 Booked100% Booked
100% Booked
Office45.68 Sq.mts. ( 492 Sq.ft. )4
4 Booked100% Booked
100% Booked
Office10.89 Sq.mts. ( 117 Sq.ft. )6
6 Booked100% Booked
100% Booked
Shop12.59 Sq.mts. ( 136 Sq.ft. )4
4 Booked100% Booked
100% Booked
Shop15.09 Sq.mts. ( 162 Sq.ft. )8
8 Booked100% Booked
100% Booked
Shop25.18 Sq.mts. ( 271 Sq.ft. )4
4 Booked100% Booked
100% Booked
Shop32.26 Sq.mts. ( 347 Sq.ft. )4
4 Booked100% Booked
100% Booked
Shop33.4 Sq.mts. ( 360 Sq.ft. )4
4 Booked100% Booked
100% Booked
Shop35.17 Sq.mts. ( 379 Sq.ft. )4
4 Booked100% Booked
100% Booked
Shop9.33 Sq.mts. ( 100 Sq.ft. )7
7 Booked100% Booked
100% Booked
1082 total apartments / 1082 apartments booked. 100% apartments booked.
Work Description in Building Vicenza Residency/Commercial A To F WingCompletion
Basement (if any)
work-in-progress50% done
50% Booked
Excavation
work-in-progress80% done
80% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress30% done
30% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress30% done
30% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
work-in-progress50% done
50% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress50% done
50% Booked
X number of Podiums
X number of Slabs of Super Structure
Project Consultants
Channel Partners Registered by Developer
HPA Spaces
for Project
Vicenza Residency/Commercial
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About HPA Spaces

HPA Spaces For over two decades, HPA SPACES are designing & creating landmarks with State of art designs, updated technologies and by availing latest amenities to the clients.The company have a successful track record of standing at par with customer's expectations by providing lifestyle housing at cost effective technologies. It is very important to develop and deliver the suitable lifestyles to the clients in their budget. With our dynamic and active team keeping the track on global updates, we are becoming the promising brand ever with efficient technologies to provide new amenities and facilities in our projects.HPA SPACES is ready to accept these challenges and provide our client's with the expertise to accomplish their goals.