• Rating: 4.1
  • (46)

This project is no longer available in our database.
Please use the adjoining search tools to find similar propjects.

-

Project Details, Configuration & Prices
Project overview
with BHK apartments / Flats starting from N/A onwards

Kalpataru Radiance

₹ 3.79 Crs. onwards
Goregaon West
2/3 BHK apartments
View Details

Ekta Tripolis

₹ 3.86 Crs. onwards
Goregaon West
2½/3 BHK apartments
View Details

DGS Sheetal Kiara

₹ 99 Lacs. onwards
Goregaon West
1/2 BHK apartments
View Details

H. Rishabraj Jakalyan Society

₹ 2.27 Crs. onwards
Goregaon West
2/3 BHK apartments
View Details

Sanghvi Crystal

₹ 1.25 Crs. onwards
Goregaon West
1/2/3 BHK apartments
View Details

Riviera

₹ 1.08 Crs. onwards
Goregaon West
1/2 BHK apartments
View Details

H Rishabhraj Opulence

₹ 1.03 Crs. onwards
Goregaon West
1/2 BHK apartments
View Details

37 Avenue

₹ 1.6 Crs. onwards
Goregaon West
2/4 BHK apartments
View Details
Project Details
  • Project:
  • Location:
  • ,
  • Const. Stage:
  • Possession:
  • Parking:
  • Floors:
Developer Details

kolte patil developers ltd

  • Developer:
  • Phone:
  • Website:
  • Address:
Project Ratings
Project Brochures
Brochures of by
Project Brochures
Project Amenities
Amenities offred in
LIFESTYLE AMENITIES
Power BackupOutdoor GamesIndoor GamesKid's play areaLandscaped gardenJogging TrackHigh speed elevatorsGrand entrance lobbyGymnasiumSwimming PoolIntercom/CCTVVideo Door PhonesPOP finished wallsImported Sanitary FittingsVitrified flooringPiped GasGranite Platform
Project RERA Details
RERA Project Status New
Proposed Possession 31 Jul 2025
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800028783
RERA Project Name Verve
RERA Location Goregaon, Cts 1016 Of Village Pahadi
RERA Developer Kolte-Patil Developers Limited
Architect Reza Kabul
Project RERA Details
Project Type Others
Funding Bank AXIS BANK
Last Modified 30 Mar 2021
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in

Facilities & Amenities
Facilities, Amenities & Common areas details of last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
As Per Design &Amp; Drawing Of Consultant
Energy management80% completed
80% Complete
As Per Design &Amp; Drawing Of Consultant
Fire Protection And Fire Safety Requirements100% completed
95% Complete
As Per Provisional Fire Noc Received From Fire Dep
Fitness Centre90% completed
90% Complete
As Per Design &Amp; Drawing Of Consultant
Landscaping & Tree Planting100% completed
95% Complete
As Per Design &Amp; Drawing Of Consultant
Open Parking
21 Nos
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
As Per Design &Amp; Drawing Of Consultant
Solid Waste Management And Disposal90% completed
90% Complete
As Per Design &Amp; Drawing Of Consultant
Storm Water Drains100% completed
95% Complete
As Per Design &Amp; Drawing Of Consultant
Street Lighting85% completed
85% Complete
As Per Design &Amp; Drawing Of Consultant
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
As Per Design &Amp; Drawing Of Consultant
Water Conservation, Rain water Harvesting100% completed
95% Complete
As Per Design &Amp; Drawing Of Consultant
Water Supply100% completed
95% Complete
Preconstruction Tanker And Post By Mcgm
Buildings / Wings in
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of by last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

101403 Sq. ft.

Project Area

18036 Sq. ft.

Recreational Open Space

Total 8

Wings / Towers in Project

Apartments Statistics

336 apartments in total
Total
336
Booked
323
Available
13

Saleable Area Statistics (Sq. ft.)

294116 Total
Total
294116
Booked
283426
Available
10690
Total 336 apartments in project. 323 apartments booked. 96% apartments booked.
Total 27324.08 saleable area. 26330.93 apartments booked.
96% area booked.

Wing A - Ground To 15Th Floor

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing A - Ground To 15Th FloorJul 2024201014086
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK70.52 Sq.mts. ( 759 Sq.ft. )15
15 Booked100% Booked
100% Booked
2 BHK66.16 Sq.mts. ( 712 Sq.ft. )14
14 Booked100% Booked
100% Booked
2 BHK66.63 Sq.mts. ( 717 Sq.ft. )14
14 Booked100% Booked
100% Booked
3 BHK95.12 Sq.mts. ( 1024 Sq.ft. )15
15 Booked100% Booked
100% Booked
Ground Floor Shop 1111.74 Sq.mts. ( 1203 Sq.ft. )1
1 Booked100% Booked
100% Booked
Ground Floor Shop 268.62 Sq.mts. ( 739 Sq.ft. )1
1 Booked100% Booked
100% Booked
Ground Floor Shop 366.58 Sq.mts. ( 717 Sq.ft. )1
1 Booked100% Booked
100% Booked
61 total apartments / 61 apartments booked. 100% apartments booked.
Work Description in Building Wing A - Ground To 15Th FloorCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing A -16Th Floor

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing A -16Th FloorJul 20240000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK66.16 Sq.mts. ( 712 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK66.63 Sq.mts. ( 717 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK70.52 Sq.mts. ( 759 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK95.12 Sq.mts. ( 1024 Sq.ft. )1
1 Booked100% Booked
100% Booked
4 total apartments / 4 apartments booked. 100% apartments booked.
Work Description in Building Wing A -16Th FloorCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress60% done
60% Booked
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B - 15Th And 16Th Floor

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing B - 15Th And 16Th FloorJul 202420000210
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK70.47 Sq.mts. ( 759 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK70.55 Sq.mts. ( 759 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK95.05 Sq.mts. ( 1023 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK95.08 Sq.mts. ( 1023 Sq.ft. )2
2 Booked100% Booked
100% Booked
8 total apartments / 8 apartments booked. 100% apartments booked.
Work Description in Building Wing B - 15Th And 16Th FloorCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress60% done
60% Booked
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B - Ground To 14Th Floor

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing B - Ground To 14Th FloorJul 2024191014096
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK70.47 Sq.mts. ( 759 Sq.ft. )14
14 Booked100% Booked
100% Booked
2 BHK70.55 Sq.mts. ( 759 Sq.ft. )13
13 Booked100% Booked
100% Booked
3 BHK95.05 Sq.mts. ( 1023 Sq.ft. )14
14 Booked100% Booked
100% Booked
3 BHK95.08 Sq.mts. ( 1023 Sq.ft. )14
14 Booked100% Booked
100% Booked
Ground Floor Shop 478.65 Sq.mts. ( 847 Sq.ft. )1
1 Booked100% Booked
100% Booked
Ground Floor Shop 566.64 Sq.mts. ( 717 Sq.ft. )1
1 Booked100% Booked
100% Booked
Ground Floor Shop 668.47 Sq.mts. ( 737 Sq.ft. )1
1 Booked100% Booked
100% Booked
Ground Floor Shop 7111.74 Sq.mts. ( 1203 Sq.ft. )1
1 Booked100% Booked
100% Booked
59 total apartments / 59 apartments booked. 100% apartments booked.
Work Description in Building Wing B - Ground To 14Th FloorCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing C - 24 To 27 Floor

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing C - 24 To 27 FloorJan 202540000832
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK70.52 Sq.mts. ( 759 Sq.ft. )3
1 Booked33% Booked
33% Booked
2 BHK70.54 Sq.mts. ( 759 Sq.ft. )4
3 Booked75% Booked
75% Booked
3 BHK95.93 Sq.mts. ( 1033 Sq.ft. )3
3 Booked100% Booked
100% Booked
3 BHK95.97 Sq.mts. ( 1033 Sq.ft. )4
3 Booked75% Booked
75% Booked
3 BHK111.06 Sq.mts. ( 1195 Sq.ft. )1
1 Booked100% Booked
100% Booked
15 total apartments / 11 apartments booked. 73% apartments booked.
Work Description in Building Wing C - 24 To 27 FloorCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress95% done
95% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress49% done
49% Booked
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing C - Ground To 23Rd Floor

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing C - Ground To 23Rd FloorJan 20252810140135
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK70.52 Sq.mts. ( 759 Sq.ft. )23
19 Booked82% Booked
82% Booked
2 BHK70.54 Sq.mts. ( 759 Sq.ft. )22
22 Booked100% Booked
100% Booked
3 BHK95.93 Sq.mts. ( 1033 Sq.ft. )20
19 Booked95% Booked
95% Booked
3 BHK95.97 Sq.mts. ( 1033 Sq.ft. )22
22 Booked100% Booked
100% Booked
87 total apartments / 82 apartments booked. 94% apartments booked.
Work Description in Building Wing C - Ground To 23Rd FloorCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress95% done
95% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress79% done
79% Booked
Plinth
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing D - 23Rd To 27Th Floor

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing D - 23Rd To 27Th FloorJan 202550000936
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK70.47 Sq.mts. ( 759 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK70.54 Sq.mts. ( 759 Sq.ft. )5
2 Booked40% Booked
40% Booked
3 BHK95.96 Sq.mts. ( 1033 Sq.ft. )5
5 Booked100% Booked
100% Booked
3 BHK95.97 Sq.mts. ( 1033 Sq.ft. )4
4 Booked100% Booked
100% Booked
3 BHK111.06 Sq.mts. ( 1195 Sq.ft. )1
1 Booked100% Booked
100% Booked
19 total apartments / 16 apartments booked. 84% apartments booked.
Work Description in Building Wing D - 23Rd To 27Th FloorCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress95% done
95% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress95% done
95% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress95% done
95% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress95% done
95% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress49% done
49% Booked
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing D - Ground To 22Nd Floor

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing D - Ground To 22Nd FloorJan 20252710140129
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK66.2 Sq.mts. ( 713 Sq.ft. )18
18 Booked100% Booked
100% Booked
2 BHK70.47 Sq.mts. ( 759 Sq.ft. )22
22 Booked100% Booked
100% Booked
2 BHK70.54 Sq.mts. ( 759 Sq.ft. )3
3 Booked100% Booked
100% Booked
3 BHK95.96 Sq.mts. ( 1033 Sq.ft. )21
21 Booked100% Booked
100% Booked
3 BHK95.97 Sq.mts. ( 1033 Sq.ft. )19
18 Booked94% Booked
94% Booked
83 total apartments / 82 apartments booked. 98% apartments booked.
Work Description in Building Wing D - Ground To 22Nd FloorCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress95% done
95% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress95% done
95% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress95% done
95% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress79% done
79% Booked
Plinth
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Project Consultants
Channel Partners Registered by Developer
for Project
Verve
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation