Vasudev Sky High Project at Mira Road by Basudeo Builders Pvt.Ltd (P51700003503)
  • Rating: 4.2
  • (25)

Vasudev Sky High - Mira Road

Basudeo Builders Pvt.Ltd
Project Details, Configuration & Prices (Exclusive of Stamp Duty Charges, GST Charges, Registration Charges & Maintenance Charges)
Project overview
Vasudev Sky High Project at Mira Road by Basudeo Builders Pvt.Ltd (P51700003503) a Sold Out Project with 1 BHK apartments / Flats starting from ₹ 47.73 Lakh onwards

Vasudev Sky High is a project developed by Basudeo Builders Pvt.Ltd which is located in Mira Road. It offers 1 bhk & 2 bhk Flats For Sale in Mira Road with basic amenities.
Vasudev Sky High QR Code
Vasudev Sky High
MahaRERA - P51700003503

Goldstar Decent Homes

₹ 1.11 Crs. onwards
Mira Road
2 BHK apartments
View Details

Aaradhya Parkwood

₹ 85.17 Lacs. onwards
Mira Road
1/2 BHK apartments
View Details

Maruti Square

₹ 1.58 Crs. onwards
Mira Road
Office BHK apartments
View Details

127 Raj Homes Tower A

₹ 76 Lacs. onwards
Mira Road
1/2 BHK apartments
View Details

127 Raj Homes Tower B & C

₹ 76 Lacs. onwards
Mira Road
1/2 BHK apartments
View Details

Crescent Western Trade Center Phase 2

₹ 71.4 Lacs. onwards
Mira Road
Office BHK apartments
View Details

Reyansh Ventura

₹ 1 Crs. onwards
Mira Road
Office BHK apartments
View Details

Reyansh Luxuria

₹ 86 Lacs. onwards
Mira Road
1/2 BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    Vasudev Sky High
  • Location:
  • Mira Road, 5A, Mira Road East, Mira Bhayandar
  • Const. Stage:
    Sold Out
  • Possession:
  • Floors:
    14
Developer Details

Basudeo Builders Pvt.Ltd

  • Developer:
    Basudeo Builders Pvt.Ltd
  • Phone:
    022 28131222
  • Website:
    www.vasudev.in
  • Address:
  • B-22,G-2,Sector 1,Shanti Nagar, Opp Shubham Party Hall, Mira Road (East), Dist: Thane,Pin : 401107.
Project Ratings
Project Amenities
Amenities offred in Vasudev Sky High
LIFESTYLE AMENITIES
High speed elevatorsKid's play areaIndoor GamesPower BackupVitrified flooringPOP finished wallsGranite Platform
Project RERA Details
RERA Project Status Ongoing
Proposed Possession 30 Jun 2019
Revised Possession 30 Jun 2019
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51700003503
RERA Project Name Vasudev Sky High
RERA Location Old Sno 304 New Sn0 177 Hissa No 2
RERA Developer Shree Prathamesh Developer
Architect Anish And Associates
Project RERA Details
Project Type Others
Funding Bank INDUSIND BANK
Last Modified 05 Aug 2017
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Mira Road

Facilities & Amenities
Facilities, Amenities & Common areas details of Vasudev Sky Highlast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space70% completed
70% Complete
Wip
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Done
Energy management
Na
Fire Protection And Fire Safety Requirements75% completed
75% Complete
Wip
Landscaping & Tree Planting70% completed
70% Complete
Wip
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Done
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Done
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Done
Water Supply
By Mbmc After Oc
Buildings / Wings in Vasudev Sky High
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Vasudev Sky Highby Basudeo Builders Pvt.Ltdlast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

197412 Sq. ft.

Project Area

15009 Sq. ft.

Recreational Open Space

Total 5

Wings / Towers in Project

Apartments Statistics

485 apartments in total
Total
485
Booked
134
Available
351

Saleable Area Statistics (Sq. ft.)

192940 Total
Total
192940
Booked
57690
Available
135250
Total 485 apartments in project. 134 apartments booked. 27% apartments booked.
Total 17924.55 saleable area. 5359.53 apartments booked.
30% area booked.

Anant Bldg - 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Anant Bldg - 3Jan 1900151010011
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
COMMERCIAL11.43 Sq.mts. ( 123 Sq.ft. )2
None Booked0% Booked
0% Booked
COMMERCIAL13.29 Sq.mts. ( 143 Sq.ft. )2
1 Booked50% Booked
50% Booked
COMMERCIAL14.49 Sq.mts. ( 156 Sq.ft. )4
2 Booked50% Booked
50% Booked
COMMERCIAL15.89 Sq.mts. ( 171 Sq.ft. )3
None Booked0% Booked
0% Booked
COMMERCIAL16.63 Sq.mts. ( 179 Sq.ft. )2
1 Booked50% Booked
50% Booked
COMMERCIAL18.58 Sq.mts. ( 200 Sq.ft. )2
1 Booked50% Booked
50% Booked
COMMERCIAL19.88 Sq.mts. ( 214 Sq.ft. )4
None Booked0% Booked
0% Booked
RESIDENTIAL35.3 Sq.mts. ( 380 Sq.ft. )23
22 Booked95% Booked
95% Booked
RESIDENTIAL36.51 Sq.mts. ( 393 Sq.ft. )20
18 Booked90% Booked
90% Booked
RESIDENTIAL38.28 Sq.mts. ( 412 Sq.ft. )15
12 Booked80% Booked
80% Booked
RESIDENTIAL56.95 Sq.mts. ( 613 Sq.ft. )15
12 Booked80% Booked
80% Booked
92 total apartments / 69 apartments booked. 75% apartments booked.
Work Description in Building Anant Bldg - 3Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress98% done
98% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress98% done
98% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Gopal

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
GopalJan 190015101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
COMMERCIAL13 Sq.mts. ( 140 Sq.ft. )15
None Booked0% Booked
0% Booked
COMMERCIAL16 Sq.mts. ( 172 Sq.ft. )15
None Booked0% Booked
0% Booked
RESIDENTIAL37 Sq.mts. ( 398 Sq.ft. )62
None Booked0% Booked
0% Booked
RESIDENTIAL57 Sq.mts. ( 614 Sq.ft. )28
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building GopalCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress20% done
20% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Keshav Bldg - 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Keshav Bldg - 2Jan 1900151010012
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
COMMERCIAL14.49 Sq.mts. ( 156 Sq.ft. )4
1 Booked25% Booked
25% Booked
COMMERCIAL15.51 Sq.mts. ( 167 Sq.ft. )2
None Booked0% Booked
0% Booked
COMMERCIAL15.89 Sq.mts. ( 171 Sq.ft. )1
None Booked0% Booked
0% Booked
COMMERCIAL16.63 Sq.mts. ( 179 Sq.ft. )2
1 Booked50% Booked
50% Booked
COMMERCIAL18.58 Sq.mts. ( 200 Sq.ft. )4
None Booked0% Booked
0% Booked
COMMERCIAL19.88 Sq.mts. ( 214 Sq.ft. )2
1 Booked50% Booked
50% Booked
RESIDENTIAL35.3 Sq.mts. ( 380 Sq.ft. )10
7 Booked70% Booked
70% Booked
RESIDENTIAL36.51 Sq.mts. ( 393 Sq.ft. )14
11 Booked78% Booked
78% Booked
RESIDENTIAL56.95 Sq.mts. ( 613 Sq.ft. )48
21 Booked43% Booked
43% Booked
87 total apartments / 42 apartments booked. 48% apartments booked.
Work Description in Building Keshav Bldg - 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress98% done
98% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress98% done
98% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Krishna

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
KrishnaJan 190015101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
COMMERCIAL13 Sq.mts. ( 140 Sq.ft. )15
None Booked0% Booked
0% Booked
COMMERCIAL16 Sq.mts. ( 172 Sq.ft. )15
None Booked0% Booked
0% Booked
RESIDENTIAL37 Sq.mts. ( 398 Sq.ft. )62
None Booked0% Booked
0% Booked
RESIDENTIAL57 Sq.mts. ( 614 Sq.ft. )28
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building KrishnaCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Madhav Bldg-1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Madhav Bldg-1Jan 1900131010010
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
COMMERCIAL11.43 Sq.mts. ( 123 Sq.ft. )2
None Booked0% Booked
0% Booked
COMMERCIAL14.49 Sq.mts. ( 156 Sq.ft. )4
None Booked0% Booked
0% Booked
COMMERCIAL14.68 Sq.mts. ( 158 Sq.ft. )1
None Booked0% Booked
0% Booked
COMMERCIAL15.89 Sq.mts. ( 171 Sq.ft. )4
2 Booked50% Booked
50% Booked
COMMERCIAL16.63 Sq.mts. ( 179 Sq.ft. )3
1 Booked33% Booked
33% Booked
COMMERCIAL18.58 Sq.mts. ( 200 Sq.ft. )2
None Booked0% Booked
0% Booked
RESIDENTIAL35.3 Sq.mts. ( 380 Sq.ft. )6
2 Booked33% Booked
33% Booked
RESIDENTIAL36.51 Sq.mts. ( 393 Sq.ft. )13
5 Booked38% Booked
38% Booked
RESIDENTIAL38.28 Sq.mts. ( 412 Sq.ft. )17
8 Booked47% Booked
47% Booked
RESIDENTIAL40.41 Sq.mts. ( 435 Sq.ft. )14
5 Booked35% Booked
35% Booked
66 total apartments / 23 apartments booked. 34% apartments booked.
Work Description in Building Madhav Bldg-1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress90% done
90% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress90% done
90% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress90% done
90% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress85% done
85% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress90% done
90% Booked
Sanitary Fittings within the flats / premises
work-in-progress90% done
90% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress90% done
90% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress90% done
90% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress90% done
90% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Project Consultants
Channel Partners Registered by Developer
Basudeo Builders Pvt.Ltd
for Project
Vasudev Sky High
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Basudeo Builders Pvt.Ltd

Basudeo Builders Pvt.Ltd Basudeo Builder are established in the construction since 1990. We are the pioneers in the construction line.The main workforce is lead by Mr. Basudev Agarwal & Mr. Amit Agarwal who are the masters in this area. We develop Residential Complex and Commercial Complex in Mira Road, Bhayander, Kanakia & Mulund. The Project Plan is taken in to consideration keeping in mind the growing needs of population in the areas surrounding. All our buildings are constructed with the state of art technology. Each Flat is crafted with utmost care and attention with all the modern amenities. Our company engages services of reputed and well-known Architects/Interior Designers for planning and designing of the project. The company keeps monitor and control on quality of construction in progress and also on material used they’re of through its technical staff. The work contract is ever awarded to specialized and reputed agencies for execution of the entire project. The company has ever planned the work progress in time frame schedule and has endeavored to meet with same. Our Group is associated with leading suppliers of High quality of Construction Materials viz. L&T, JK Cement, Ambhe Ferro Metals, RAK, Nitco & Kajaria Tiles, Nitco Paints, Jaguar, Otis Elevators etc.