Udaan Aria Project at Karjat by Udaan Builders & Developers (P52000008827)
  • Rating: 3.6
  • (17)

Udaan Aria - Karjat

Udaan Builders & Developers
Project Details, Configuration & Prices (Exclusive of Stamp Duty Charges, GST Charges, Registration Charges & Maintenance Charges)
1 RK-390 Sq.ft.
₹11.11 Lacs
1 RK-422 Sq.ft.
₹12.02 Lacs
1 BHK-581 Sq.ft.
₹16.55 Lacs
1 BHK-596 Sq.ft.
₹16.98 Lacs
1 BHK-645 Sq.ft.
₹18.38 Lacs
Project overview
Udaan Aria Project at Karjat by Udaan Builders & Developers (P52000008827) a Sold Out Project with 1/1 RK BHK apartments / Flats starting from ₹ 11.12 Lakh onwards

Udaan Aria is a 7 storied Under Construction Project and the location is Survey No. 13pt., Chinchavali, Bhivpuri railway station (E), Nr. Chinchavali Fatak., Karjat and is developed by Udaan Builders & Developers. Udaan Aria was launched in Oct 2014 and the possession of the same is likely to be in Dec 2018. The car parking is open for this project. Udaan Aria is RERA approved has the Registration Number bearing P52000008827. Udaan Aria is tagged as Investors Delight / Self Use / RERA Approved. Amenities like Club House Swimming Pool Gymnasium Grand entrance lobby High speed elevators Kid's play area Landscaped garden Indoor Games Jogging Track Power Backup Vitrified flooring Temple Concealed Wiring Aluminium Sliding Windows Intercom/CCTV Granite Platform Modular Kitchen are planned to be provided in Udaan Aria.Udaan Builders & Developers also has other under construction and ready possession and sold out projects like Udaan Aria, Udaan Aurum, Udaan Avenue, Udaan Aura. The property prices in Karjat are in the range of to for Outright for ready and under construction projects. Udaan Builders & Developers currently has 2 Under Construction projects. Udaan Aria has good reviews and the ratings of this project are approximately 2 out of 5. You can download the brochure of Udaan Aria and you can see the latest digital pictures, Floor Plans, Location Plans & Rate History on our website. The Bookings for the Under Construction project Udaan Aria are open and we can set up a Site Visit any time at your Convenience. Udaan Aria is approved by most of the Banks and for more details on the approved bank list, please connect with us.
Udaan Aria QR Code
Udaan Aria
MahaRERA - P52000008827

Kalpataru Aria

₹ 80.75 Lacs. onwards
Karjat
Row House BHK apartments
View Details

Skyline Riverside

₹ 16.2 Lacs. onwards
Karjat
1/2 BHK apartments
View Details

Unimont Aurum

₹ 25.27 Lacs. onwards
Karjat
1/2 BHK apartments
View Details
Project Details
Project details were last updated in Nov 2025
  • Project:
    Udaan Aria
  • Location:
  • Karjat, Survey No. 13pt., Chinchavali, Bhivpuri railway station (E), Nr. Chinchavali Fatak.
  • Const. Stage:
    Sold Out
  • Possession:
    Dec 2018
  • Floors:
    7
Developer Details

Udaan Builders & Developers

  • Developer:
    Udaan Builders & Developers
  • Phone:
    022 27885555
  • Website:
    www.udaanhomes.com
  • Address:
  • Off. No. 65, 4th floor, Mahavir Center, Plot No. 77, Sector 17, Vashi 400703.
Project Ratings
Project Amenities
Amenities offred in Udaan Aria
LIFESTYLE AMENITIES
Club HouseSwimming PoolGymnasiumGrand entrance lobbyHigh speed elevatorsKid's play areaLandscaped gardenIndoor GamesJogging TrackPower BackupTempleIntercom/CCTVVitrified flooringGranite PlatformModular Kitchen
Project RERA Details
RERA Project Status Ongoing
Proposed Possession 31 Jul 2022
Revised Possession 31 Jul 2022
Extended Possession 31 Jul 2024
Litigations No Litigations
Project RERA Details
MAHA RERA No: P52000008827
RERA Project Name Udaan Aria
RERA Location 13-Pt
RERA Developer Udaan Builders And Developers
Architect Structils Consultants Pvt Ltd
Project RERA Details
Project Type Others
Funding Bank INDUSIND BANK
Last Modified 26 May 2025
Last Retrived 28 Jul 2025

Most active Channel Partners, Real Estate Agents in Karjat

Facilities & Amenities
Facilities, Amenities & Common areas details of Udaan Arialast updated on 28 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Club House and Swimming Pool100% completed
95% Complete
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station60% completed
60% Complete
Na
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting80% completed
80% Complete
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)90% completed
90% Complete
Na
Solid Waste Management And Disposal
Na
Storm Water Drains90% completed
90% Complete
Na
Street Lighting90% completed
90% Complete
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply90% completed
90% Complete
Na
Buildings / Wings in Udaan Aria
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Udaan Ariaby Udaan Builders & Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA. Disclaimer

132505 Sq. ft.

Project Area

16933 Sq. ft.

Recreational Open Space

Total 7

Wings / Towers in Project

Apartments Statistics

372 apartments in total
Total
372
Booked
239
Available
133

Saleable Area Statistics (Sq. ft.)

82491 Total
Total
82491
Booked
52795
Available
29696
Total 372 apartments in project. 239 apartments booked. 64% apartments booked.
Total 7663.59 saleable area. 4904.78 apartments booked.
64% area booked.

A Type 01

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A Type 01Jul 202381000140
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK23.86 Sq.mts. ( 257 Sq.ft. )12
9 Booked75% Booked
75% Booked
1 BHK24.53 Sq.mts. ( 264 Sq.ft. )60
53 Booked88% Booked
88% Booked
72 total apartments / 62 apartments booked. 86% apartments booked.
Work Description in Building A Type 01Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress60% done
60% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress85% done
85% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress85% done
85% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

B Type 04

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B Type 04Jul 202381000146
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK23.86 Sq.mts. ( 257 Sq.ft. )23
6 Booked26% Booked
26% Booked
1 BHK24.53 Sq.mts. ( 264 Sq.ft. )25
5 Booked20% Booked
20% Booked
1 BHK25.05 Sq.mts. ( 270 Sq.ft. )8
1 BHK25.21 Sq.mts. ( 271 Sq.ft. )6
6 Booked100% Booked
100% Booked
1RK18.78 Sq.mts. ( 202 Sq.ft. )4
None Booked0% Booked
0% Booked
Shop20.01 Sq.mts. ( 215 Sq.ft. )4
3 Booked75% Booked
75% Booked
Shop8.1 Sq.mts. ( 87 Sq.ft. )6
3 Booked50% Booked
50% Booked
Shop16.97 Sq.mts. ( 183 Sq.ft. )2
1 Booked50% Booked
50% Booked
78 total apartments / 25 apartments booked. 32% apartments booked.
Work Description in Building B Type 04Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress30% done
30% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
work-in-progress40% done
40% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked

C Type 02 Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C Type 02 Wing AJul 202381000140
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK20.57 Sq.mts. ( 221 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK21.41 Sq.mts. ( 230 Sq.ft. )1
1 Booked100% Booked
100% Booked
1RK16.56 Sq.mts. ( 178 Sq.ft. )25
19 Booked76% Booked
76% Booked
1RK17.16 Sq.mts. ( 185 Sq.ft. )5
4 Booked80% Booked
80% Booked
1RK17.33 Sq.mts. ( 187 Sq.ft. )6
2 Booked33% Booked
33% Booked
1RK17.57 Sq.mts. ( 189 Sq.ft. )15
8 Booked53% Booked
53% Booked
54 total apartments / 34 apartments booked. 62% apartments booked.
Work Description in Building C Type 02 Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress65% done
65% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress55% done
55% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress90% done
90% Booked
Stilt Floor
Completed 100% done
100% Booked

C Type 02 Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C Type 02 Wing BJul 202381000140
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK21.1 Sq.mts. ( 227 Sq.ft. )4
2 Booked50% Booked
50% Booked
1 BHK24.16 Sq.mts. ( 260 Sq.ft. )24
17 Booked70% Booked
70% Booked
1 BHK24.42 Sq.mts. ( 263 Sq.ft. )7
5 Booked71% Booked
71% Booked
1 BHK25.1 Sq.mts. ( 270 Sq.ft. )20
14 Booked70% Booked
70% Booked
1 BHK25.54 Sq.mts. ( 275 Sq.ft. )5
4 Booked80% Booked
80% Booked
60 total apartments / 42 apartments booked. 70% apartments booked.
Work Description in Building C Type 02 Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress20% done
20% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress60% done
60% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress90% done
90% Booked
Stilt Floor
Completed 100% done
100% Booked

Club House

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Club HouseJul 20231100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
CLUB HOUSE84 Sq.mts. ( 904 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building Club HouseCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress90% done
90% Booked
Stilt Floor
Completed 100% done
100% Booked

D Type 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D Type 3Jul 202381000140
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1RK16.29 Sq.mts. ( 175 Sq.ft. )108
76 Booked70% Booked
70% Booked
108 total apartments / 76 apartments booked. 70% apartments booked.
Work Description in Building D Type 3Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress60% done
60% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress75% done
75% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress45% done
45% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress80% done
80% Booked
Stilt Floor
Completed 100% done
100% Booked

Temple

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
TempleJul 20231100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Temple40 Sq.mts. ( 431 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building TempleCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Project Consultants
Channel Partners Registered by Developer
Udaan Builders & Developers
for Project
Udaan Aria
last updated on 28 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Udaan Builders & Developers

Udaan Builders & Developers UDAAN Builders, began in the year 2013 and since then we have been carving a smooth path between the clients and their dream property. We have set benchmarks in the domain of real estate with our team of expert professionals who have been helping thousands of people in getting to their dream property.