Trishabh Signet Project at Chembur by Trishabh Group (P51800001222)
  • Rating:
  • ()

Trishabh Signet - Chembur

Project Details, Configuration & Prices
4 BHK1267 Sq.ft. Carpet ₹ 4.51 Cr++
Project overview
Trishabh Signet Project at Chembur by Trishabh Group (P51800001222) a Sold Out Project with 4 BHK apartments / Flats starting from ₹ 4.51 Crs onwards

Trishabh Signet is a Residential Project Developed by the Trishabh Group. It is located at Chembur East. Close proximity to all social facilities. Just 10 minutes from Chembur Station and 5 minutes from Monorail Station and Bus Stop. Close to school and colleges. Well-connected with Sion-Trombay Road and Eastern Express Highway, just minutes away from Eastern Freeway and Chembur-Santacruz Link Road and more to this walking distance to Jain Mandir. The Project offers lavish 3 and 4 BHK Residences. 3 Side open apartments and per floor 1 flat. 2 Hi- speed elevators. Well designed apartments with modern amenities and facilities. OC Received.
Trishabh Signet QR Code
Trishabh Signet
MahaRERA - P51800001222

Safal Montbay

₹ 6.69 Crs. onwards
Chembur
4/5/Duplex BHK apartments
View Details
Chembur
3 BHK apartments
View Details

The Epicentre

₹ 1.98 Crs. onwards
Chembur
Office BHK apartments
View Details

Hubtown Seasons

₹ 2.82 Crs. onwards
Chembur
2/4 BHK apartments
View Details

Dukes Horizon

₹ 1.8 Crs. onwards
Chembur
2/3 BHK apartments
View Details

Rustomjee Chembur

₹ 7.56 Crs. onwards
Chembur
3/4/5 BHK apartments
View Details

Supreme Boulevard

₹ 2.7 Crs. onwards
Chembur
2/3/4 BHK apartments
View Details

Golf Walk

₹ 5.23 Crs. onwards
Chembur
3 BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    Trishabh Signet
  • Location:
  • Chembur, D.K Sandu Marg, Chembur Naka
  • Const. Stage:
    Sold Out
  • Possession:
Developer Details

  • Developer:
    Trishabh Group
  • Phone:
    022-25293344
  • Website:
    https://trishabh.com
  • Address:
  • 4, Rishabh Shopping Centre, Opp. Gulmarg Society, Nr. V.N.P & R.C. Marg Monorail station, Chembur Naka, Chembur (E)
Project Ratings
Project Brochures
Brochures of Trishabh Signetby Trishabh Group
Project Brochures
  • MPE/Brochures/30514/Trishabh Signet Brochure.pdf
Project Amenities
Amenities offred in Trishabh Signet
LIFESTYLE AMENITIES
Power BackupHigh speed elevatorsGrand entrance lobbyGymnasiumIntercom/CCTVVideo Door PhonesAluminium Sliding WindowsPOP finished wallsImported Sanitary FittingsConcealed PlumbingConcealed WiringMarble flooringVitrified flooringGranite PlatformSecurity Help Desk
Project RERA Details
RERA Project Status Ongoing
Proposed Possession 31 Dec 2019
Revised Possession 31 Dec 2019
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800001222
RERA Project Name Trishabh Signet
RERA Location 1295
RERA Developer Dimension Housing Realty Llp
Architect Mr Kirti Khushal Shah
Project RERA Details
Project Type Residential / Group Housing
Funding Bank BHARAT COOPERATIVE BANK MUMBAI LIMITED
Last Modified 27 Jul 2017
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Chembur

Facilities & Amenities
Facilities, Amenities & Common areas details of Trishabh Signetlast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Shall Be Done Prior To Oc
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Shall Be Done Prior To Oc
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Shall Be Done Prior To Oc
Solid Waste Management And Disposal
Na
Storm Water Drains
No Septic Tank &Amp; Stp
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
Shall Be Done Prior To Oc
Buildings / Wings in Trishabh Signet
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Trishabh Signetby Trishabh Grouplast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

5746 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

12 apartments in total
Total
12
Booked
12
Available
0

Saleable Area Statistics (Sq. ft.)

13332 Total
Total
13332
Booked
13332
Available
0
Total 12 apartments in project. 12 apartments booked. 100% apartments booked.
Total 1238.54 saleable area. 1238.54 apartments booked.
100% area booked.

Trishabh Signet

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Trishabh SignetDec 201913101031
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK92.4 Sq.mts. ( 995 Sq.ft. )6
6 Booked100% Booked
100% Booked
3 BHK104.88 Sq.mts. ( 1129 Sq.ft. )3
3 Booked100% Booked
100% Booked
4 BHK117.68 Sq.mts. ( 1267 Sq.ft. )1
1 Booked100% Booked
100% Booked
4 BHK125.91 Sq.mts. ( 1355 Sq.ft. )2
2 Booked100% Booked
100% Booked
12 total apartments / 12 apartments booked. 100% apartments booked.
Work Description in Building Trishabh SignetCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress89% done
89% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress90% done
90% Booked
Sanitary Fittings within the flats / premises
work-in-progress90% done
90% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Project Consultants
Channel Partners Registered by Developer
Trishabh Group
for Project
Trishabh Signet
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Trishabh Group