The Gateway Project at Vashi by Lakhanis Builders And Developers (P51700050451)
  • Rating:
  • ()

The Gateway - Vashi

Lakhanis Builders And Developers
Project Details, Configuration & Prices
Project overview
The Gateway Project at Vashi by Lakhanis Builders And Developers (P51700050451) is a RERA approved Under Construction Project with RERA ID P51700050451 slated to be ready for possession by Mar 2029 with 3/4/6 BHK apartments / Flats starting from N/A onwards

THE-GATEWAY is a 30-storey affluent community landmark offering exclusive 3, 4 & 6 bedroom oceanfront residences and duplexes, crafted for those who seek absolute luxury and breathtaking views of the Arabian Sea and lush mangroves. These bespoke residences feature 11 ft clear ceiling heights, creating grand, light-filled living spaces that redefine modern coastal luxury. Designed with architectural excellence and meticulous detailing, THE-GATEWAY stands as a symbol of prestige, elegance, and elite urban living. Residents enjoy a 7-star private club experience with signature-class wellness and recreation avenues, including a fully equipped gym, swimming pool, party area, landscaped lawn, indoor games arena, and luxury lobby. A 5-tier advanced security system ensures unmatched safety and peace of mind within the premises. Created as a sanctuary for discerning homeowners, THE-GATEWAY is a rare luxury address that blends panoramic sea views, elite lifestyle amenities, and world-class residential standards—making it an ideal choice for high-net-worth buyers seeking a timeless coastal legacy.
The Gateway QR Code
The Gateway
MahaRERA - P51700050451

Godrej Bayview

₹ 2.45 Crs. onwards
Vashi
2/3 BHK apartments
View Details

Raheja Lunaris

₹ 1.13 Crs. onwards
Vashi
1½/2/2½ BHK apartments
View Details

La Vita

₹ 72.6 Lacs. onwards
Vashi
2/Office BHK apartments
View Details

10 Marina Bay

₹ 1.64 Crs. onwards
Vashi
2/3 BHK apartments
View Details

Arihant Advika

₹ 1.79 Crs. onwards
Vashi
2/3 BHK apartments
View Details

Goodwill Wisteria

₹ 3.71 Crs. onwards
Vashi
3/3½/4½/5½ BHK apartments
View Details
Vashi
3/4 BHK apartments
View Details
Vashi
Office BHK apartments
View Details
Project Details
Project details were last updated in Dec 2025
  • Project:
    The Gateway
  • Location:
  • Vashi, Sahitya Mandir Marg, Sector 6, Next to Navratri Utsav maidan
  • Const. Stage:
    Under Construction
  • Possession:
    Mar 2029
  • Floors:
    30
Developer Details

Lakhanis Builders And Developers

  • Developer:
    Lakhanis Builders And Developers
  • Phone:
    022 27833011
  • Website:
    www.lakhanibuilders.in
  • Address:
  • Satra Plaza, 18th floor, Plot No.20,Sector - 19-D, Vashi, Navi Mumbai - 400 705.
Project Ratings
Project Amenities
Amenities offred in The Gateway
LIFESTYLE AMENITIES
Power BackupIndoor GamesAir Conditioned LobbyKid's play areaHigh speed elevatorsGrand entrance lobbyGymnasiumClub HouseSwimming PoolIntercom/CCTVConcealed PlumbingConcealed WiringVitrified flooringGranite PlatformSecurity Help DeskMulti Purpose Hall
Project RERA Details
RERA Project Status New
Proposed Possession 31 Mar 2029
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51700050451
RERA Project Name The Gateway
RERA Location 03
RERA Developer Metricon Realty Llp
Architect Soyuztalib
Project RERA Details
Project Type Residential / Group Housing
Funding Bank IDBI BANK
Last Modified 12 Apr 2023
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Vashi

Facilities & Amenities
Facilities, Amenities & Common areas details of The Gatewaylast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
In Later Scope Of Work
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
In Later Scope Of Work
Energy management
In Later Scope Of Work
Fire Protection And Fire Safety Requirements
In Later Scope Of Work
Landscaping & Tree Planting
In Later Scope Of Work
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
In Later Scope Of Work
Solid Waste Management And Disposal
In Later Scope Of Work
Storm Water Drains
In Later Scope Of Work
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
In Later Scope Of Work
Water Conservation, Rain water Harvesting
In Later Scope Of Work
Water Supply
In Later Scope Of Work
Buildings / Wings in The Gateway
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of The Gatewayby Lakhanis Builders And Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

81300 Sq. ft.

Project Area

18659 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

448 apartments in total
Total
448
Booked
17
Available
431

Saleable Area Statistics (Sq. ft.)

269722 Total
Total
269722
Booked
18179
Available
251543
Total 448 apartments in project. 17 apartments booked. 3% apartments booked.
Total 25057.78 saleable area. 1688.89 apartments booked.
7% area booked.

Building - A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building - AMar 20293110160206
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK82.465 Sq.mts. ( 888 Sq.ft. )14
None Booked0% Booked
0% Booked
3 BHK91.22 Sq.mts. ( 982 Sq.ft. )24
8 Booked33% Booked
33% Booked
3 BHK106.57 Sq.mts. ( 1147 Sq.ft. )24
9 Booked37% Booked
37% Booked
3 BHK122.95 Sq.mts. ( 1323 Sq.ft. )5
None Booked0% Booked
0% Booked
67 total apartments / 17 apartments booked. 25% apartments booked.
Work Description in Building Building - ACompletion
Basement (if any)
work-in-progress75% done
75% Booked
Excavation
work-in-progress80% done
80% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
work-in-progress75% done
75% Booked
Podiums (if any)
work-in-progress60% done
60% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
work-in-progress36% done
36% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building - B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building - BMar 20293110160206
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK82.49 Sq.mts. ( 888 Sq.ft. )14
None Booked0% Booked
0% Booked
3 BHK91.22 Sq.mts. ( 982 Sq.ft. )24
None Booked0% Booked
0% Booked
3 BHK106.57 Sq.mts. ( 1147 Sq.ft. )24
None Booked0% Booked
0% Booked
3 BHK122.95 Sq.mts. ( 1323 Sq.ft. )5
None Booked0% Booked
0% Booked
67 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building - BCompletion
Basement (if any)
work-in-progress70% done
70% Booked
Excavation
work-in-progress80% done
80% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
work-in-progress70% done
70% Booked
Podiums (if any)
work-in-progress60% done
60% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress32% done
32% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
work-in-progress20% done
20% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building - C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building - CMar 20293710140378
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.31 Sq.mts. ( 380 Sq.ft. )29
None Booked0% Booked
0% Booked
1 BHK38.6 Sq.mts. ( 415 Sq.ft. )285
None Booked0% Booked
0% Booked
314 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building - CCompletion
Basement (if any)
work-in-progress70% done
70% Booked
Excavation
work-in-progress90% done
90% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress48% done
48% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
work-in-progress70% done
70% Booked
Podiums (if any)
work-in-progress75% done
75% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
work-in-progress30% done
30% Booked
Slabs of Super Structure
work-in-progress60% done
60% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress20% done
20% Booked
Stilt Floor
work-in-progress70% done
70% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Project Consultants
Channel Partners Registered by Developer
Lakhanis Builders And Developers
for Project
The Gateway
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Lakhanis Builders And Developers

Lakhanis Builders And Developers Watching a city grow in front of our eyes is an achievement as well as a memorable experience. Since its inception, Lakhani’s has witnessed the steps of development across Navi Mumbai cityscape. While this is the smallest part of the picture, the city has been in the hemisphere of real estate development for more than two decades. Marking its presence across the urban skyline of Mumbai, Navi Mumbai, Ulwe, Khopoli, Lonavala and Pune with more than 60 projects both commercial as well as residential, the sole aim has been to create benchmarks with consistent development in customer satisfaction and value-addition. In the coming years, Lakhani’s is poised to add many more landmarks of excellence to the already existing array of illustrious projects while simultaneously raising the bar of quality, innovation and progressive outlook.