Tharwani Solitaire Project at Kalyan by Tharwani Realty (P51700005135)
  • Rating: 4.0
  • (17)

Tharwani Solitaire - Kalyan

Tharwani Realty
Project Details, Configuration & Prices (Exclusive of Stamp Duty Charges, GST Charges, Registration Charges & Maintenance Charges)
Project overview
Tharwani Solitaire Project at Kalyan by Tharwani Realty (P51700005135) a Sold Out Project with 2/3/4 BHK apartments / Flats starting from ₹ 0 onwards

Tharwani Solitaire is a 7 storied Under Construction Project and the location is Kalyan Murbad Road at Mharal, Kalyan and is developed by Tharwani Realty. Tharwani Solitaire was launched in Feb 2014 and the possession of the same is likely to be in Dec 2020. Tharwani Solitaire is RERA approved has the Registration Number bearing P51700004565. Tharwani Solitaire is tagged as Investors Delight / Self Use / RERA Approved Amenities like Swimming Pool Club House Gymnasium Grand entrance lobby High speed elevators Jogging Track Landscaped garden Kid's play area Indoor Games Outdoor Games Power Backup Vitrified flooring Concealed Wiring Concealed Plumbing Imported Sanitary Fittings POP finished walls Aluminium Sliding Windows Video Door Phones Intercom/CCTV Granite Platform are planned to be provided in Tharwani Solitaire.
Tharwani Solitaire QR Code
Tharwani Solitaire
MahaRERA - P51700005135

Lodha Palava Aquaville

₹ 46.21 Lacs. onwards
Kalyan
1/1½/2/2½/3/5 BHK apartments
View Details

Birla Vanya

₹ 63 Lacs. onwards
Kalyan
1/2/3/4 BHK apartments
View Details

Metroplex

₹ 42.5 Lacs. onwards
Kalyan
1/2/2½ BHK apartments
View Details

Raunak City Phase 6

₹ 39.77 Lacs. onwards
Kalyan
1/2/3/4 BHK apartments
View Details

Tycoons Orbis

₹ 89.99 Lacs. onwards
Kalyan
2 BHK apartments
View Details

Kalyan Vihar

₹ 32.99 Lacs. onwards
Kalyan
1 BHK apartments
View Details

Hiranandani Woodspring

₹ 62.3 Lacs. onwards
Kalyan
1/2 BHK apartments
View Details

Cornerstone

₹ 55.1 Lacs. onwards
Kalyan
1/2 BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    Tharwani Solitaire
  • Location:
  • Kalyan, Kalyan Murbad Road at Mharal
  • Const. Stage:
    Sold Out
  • Possession:
    Dec 2020
  • Floors:
    7
Developer Details

Tharwani Realty

  • Developer:
    Tharwani Realty
  • Phone:
    022 27895400
  • Website:
    www.tharwanirealty.com
  • Address:
  • 310 – 313, 3rd Floor, Persipolis Premises Co. Op. Society. Plot No. 74, Sector No. 17, Vashi, Navi Mumbai.
Project Ratings
Project Amenities
Amenities offred in Tharwani Solitaire
LIFESTYLE AMENITIES
Swimming PoolClub HouseGymnasiumGrand entrance lobbyHigh speed elevatorsJogging TrackLandscaped gardenKid's play areaIndoor GamesOutdoor GamesPower BackupVitrified flooringImported Sanitary FittingsPOP finished wallsVideo Door PhonesIntercom/CCTVGranite Platform
Project RERA Details
RERA Project Status Ongoing
Proposed Possession 30 Mar 2021
Revised Possession 30 Mar 2021
Extended Possession 29 Sep 2022
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51700005135
RERA Project Name Tharwani Solitaire Phase Iii
RERA Location 8/1, 8/2, 12/1-12/7, 13/1, 13/2, 14/1-14/4
RERA Developer Anil Hardasmal Tharwani
Architect Dinesh Bajaj
Project RERA Details
Project Type Others
Funding Bank BANK OF BARODA
Last Modified 09 Sep 2021
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Kalyan

Facilities & Amenities
Facilities, Amenities & Common areas details of Tharwani Solitairelast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
---
Community Buildings
---
Electrical Meter Room, Sub-Station, Receiving Station
Provided Two Nos Of Sub Station And Meter Room
Energy management
---
Fire Protection And Fire Safety Requirements
Provided As Per Fire Noc
Landscaping & Tree Planting
---
Open Parking
---
Sewerage (Chamber, Lines, Septic Tank , STP)
Provided Chamber Lines And Stp
Solid Waste Management And Disposal
Provided Owc
Storm Water Drains
Provided Catch Pits
Street Lighting
Provided Street Light
Treatment And Disposal Of Sewage And Sullage Water
After Treatment Used As Flushing Water
Water Conservation, Rain water Harvesting
Provided Rwh Tank
Water Supply
---
Buildings / Wings in Tharwani Solitaire
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Tharwani Solitaireby Tharwani Realtylast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

153387 Sq. ft.

Project Area

119623 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

130 apartments in total
Total
130
Booked
37
Available
93

Saleable Area Statistics (Sq. ft.)

528946 Total
Total
528946
Booked
35288
Available
493658
Total 130 apartments in project. 37 apartments booked. 28% apartments booked.
Total 49140.31 saleable area. 3278.35 apartments booked.
7% area booked.

Hiddenite

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
HiddeniteSep 2022710101018
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK74.51 Sq.mts. ( 802 Sq.ft. )14
12 Booked85% Booked
85% Booked
3 BHK77.25 Sq.mts. ( 832 Sq.ft. )14
14 Booked100% Booked
100% Booked
28 total apartments / 26 apartments booked. 92% apartments booked.
Work Description in Building HiddeniteCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress95% done
95% Booked
Sanitary Fittings within the flats / premises
work-in-progress95% done
95% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Opal

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
OpalSep 2022810101230
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
4 BHK118.43 Sq.mts. ( 1275 Sq.ft. )32
11 Booked34% Booked
34% Booked
32 total apartments / 11 apartments booked. 34% apartments booked.
Work Description in Building OpalCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress80% done
80% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress80% done
80% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress95% done
95% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress80% done
80% Booked
Sanitary Fittings within the flats / premises
work-in-progress80% done
80% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress90% done
90% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress90% done
90% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Quartz

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
QuartzJul 2021710101428
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK1379.56 Sq.mts. ( 14850 Sq.ft. )28
None Booked0% Booked
0% Booked
2 BHK to be approved371.63 Sq.mts. ( 4000 Sq.ft. )7
None Booked0% Booked
0% Booked
3 BHK TO BE APPROVED73.06 Sq.mts. ( 786 Sq.ft. )7
None Booked0% Booked
0% Booked
42 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building QuartzCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Ruby

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
RubyJan 1900710101414
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK TO BE APPROVED53.05 Sq.mts. ( 571 Sq.ft. )28
None Booked0% Booked
0% Booked
28 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building RubyCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Project Consultants
Channel Partners Registered by Developer
Tharwani Realty
for Project
Tharwani Solitaire Phase Iii
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Tharwani Realty

Tharwani Realty THARWANI REALTY is one of a leading infrastructure company, which have always come up with innovative and world class amenities. Over the last couple of decades, THARWANI REALTY has firmly established itself as one of the leading and most successful developers of real estate in around Mumbai by etching its invincible print across all asset classes. It is a thought that has been encapsulated by Mr. Anil Tharwani and backed up by his tremendous team. We are an organisation that is highly focused on delivering international quality products in a timely manner with utmost perfection.