Swayam Project at Matunga by Gala Habitats (P51900033034)
  • Rating:
  • ()

Swayam - Matunga

Project Details, Configuration & Prices
1 BHK386 Sq.ft. Carpet ₹ 1.75 Cr++
Project overview
Swayam Project at Matunga by Gala Habitats (P51900033034) a Sold Out Project with 1 BHK apartments / Flats starting from ₹ 1.75 Crs onwards

Swayam is a Residential Project Developed by the Gala Habitats, Matunga West. Matunga West is well-connected to other parts of Mumbai. It is served by the Matunga Railway Station, which is part of the Central Line of the Mumbai Suburban Railway, providing easy access to various parts of the city. Additionally, it is located near major roadways, including the Eastern Express Highway and the King's Circle Flyover, offering convenient road access. Well connected to the upcoming metro station, Eastern/Western Express Highway. Close Mahim and Matunga Railway Station. Close proximity to the social infrastructure. The Project offers 1 BHK residencies with Mesmerizing views of Bandra Worli Sea Link. Limited Edition Sea View. Vastu complaint Homes. High speed elevators in the building. Amenities include Elegant Entrance Lobby, Senior Citizen Area, Barbeque Zone, Walking/Jogging Track, Home Automation, Bells Carts in Lobby, Sky Level Amenities.
Swayam QR Code
Swayam
MahaRERA - P51900033034

Kalpataru Matru Ashish

₹ 10.02 Crs. onwards
Matunga
3/Duplex BHK apartments
View Details

Godrej Five Gardens

₹ 10.26 Crs. onwards
Matunga
3 BHK apartments
View Details

Lodha Divino

₹ 4.22 Crs. onwards
Matunga
2/3/4 BHK apartments
View Details

Lodha Vero

₹ 11.34 Crs. onwards
Matunga
3/4/5 BHK apartments
View Details

Rustomjee 180 Bayview

₹ 4.15 Crs. onwards
Matunga
2/3/4 BHK apartments
View Details

EL Mejor

₹ 2.37 Crs. onwards
Matunga
1½/2/3 BHK apartments
View Details

Tridhaatu Athena

₹ 6.92 Crs. onwards
Matunga
3/Duplex BHK apartments
View Details

Ruparel Iris

₹ 4.15 Crs. onwards
Matunga
2 BHK apartments
View Details
Project Details
Project details were last updated in Nov 2025
  • Project:
    Swayam
  • Location:
  • Matunga, Zara Habitats, L.J Road
  • Const. Stage:
    Sold Out
  • Possession:
    Dec 2025
  • Parking:
    Podium
  • Floors:
    22
Developer Details

  • Developer:
    Gala Habitats
  • Phone:
  • Website:
    www.galahabitats.com
  • Address:
  • Unit no. 2, Ground floor, A-wing Baba Nagar, St. Peter’s Road, O Hill Road, Bandra West
Project Ratings
Project Brochures
Brochures of Swayamby Gala Habitats
Project Brochures
  • MPE/Brochures/30633/Swayam Brochure.pdf
Project Amenities
Amenities offred in Swayam
LIFESTYLE AMENITIES
Power BackupOutdoor GamesKid's play areaHigh speed elevatorsGrand entrance lobbyGymnasiumIntercom/CCTVVideo Door PhonesAluminium Sliding WindowsPOP finished wallsImported Sanitary FittingsConcealed PlumbingConcealed WiringMarble flooringVitrified flooringGranite PlatformSecurity Help DeskMulti Purpose Hall
Project RERA Details
RERA Project Status New
Proposed Possession 31 Dec 2025
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51900033034
RERA Project Name Swayam
RERA Location 104
RERA Developer Gala Habitats Llp
Architect The Design Studio
Project RERA Details
Project Type Others
Funding Bank HDFC BANK
Last Modified 12 Dec 2024
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Matunga

Facilities & Amenities
Facilities, Amenities & Common areas details of Swayamlast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station30% completed
30% Complete
Before Occupation
Energy management
Na
Fire Protection And Fire Safety Requirements10% completed
10% Complete
Before Completion
Fitness Center
Before Occupation
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)30% completed
30% Complete
No Stp Proposed
Solid Waste Management And Disposal
Na
Storm Water Drains
Rest Before Occupation
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting30% completed
30% Complete
Before Completion
Water Supply
Provided By Mcgm
Buildings / Wings in Swayam
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Swayamby Gala Habitatslast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

7393 Sq. ft.

Project Area

5242 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

25 apartments in total
Total
25
Booked
19
Available
6

Saleable Area Statistics (Sq. ft.)

11646 Total
Total
11646
Booked
7672
Available
3974
Total 25 apartments in project. 19 apartments booked. 76% apartments booked.
Total 1081.92 saleable area. 712.72 apartments booked.
66% area booked.

Swayam

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
SwayamDec 2025221110043
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.89 Sq.mts. ( 386 Sq.ft. )17
16 Booked94% Booked
94% Booked
1 BHK36.66 Sq.mts. ( 395 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK37.86 Sq.mts. ( 408 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK50.31 Sq.mts. ( 542 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop186.67 Sq.mts. ( 2009 Sq.ft. )1
None Booked0% Booked
0% Booked
25 total apartments / 19 apartments booked. 76% apartments booked.
Work Description in Building SwayamCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress70% done
70% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress69% done
69% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress65% done
65% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress72% done
72% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress86% done
86% Booked
Project Consultants
Channel Partners Registered by Developer
Gala Habitats
for Project
Swayam
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Gala Habitats