• Rating: 4.0
  • (15)

This project is no longer available in our database.
Please use the adjoining search tools to find similar propjects.

-

Project Details, Configuration & Prices
Project overview
with BHK apartments / Flats starting from N/A onwards

Windermere

₹ 80.5 Lacs. onwards
Bhayandar
1/2 BHK apartments
View Details

Kanakia Beverly Heights

₹ 97.75 Lacs. onwards
Bhayandar
2 BHK apartments
View Details

Opulence

₹ 3.91 Crs. onwards
Bhayandar
3/4/6 BHK apartments
View Details

Grand Empire

₹ 80.5 Lacs. onwards
Bhayandar
1/2 BHK apartments
View Details
Project Details
  • Project:
  • Location:
  • ,
  • Const. Stage:
  • Possession:
  • Parking:
  • Floors:
Developer Details

span group

  • Developer:
  • Phone:
  • Website:
  • Address:
Project Ratings
Project Brochures
Brochures of by
Project Brochures
Project Amenities
Amenities offred in
LIFESTYLE AMENITIES
Club HouseSwimming PoolKid's play areaPower BackupIndoor GamesIntercom/CCTVPOP finished wallsVideo Door PhonesVitrified flooringGranite PlatformModular Kitchen
Project RERA Details
RERA Project Status Ongoing
Proposed Possession 30 Dec 2027
Revised Possession 30 Dec 2027
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51700005406
RERA Project Name Span Trident Wing B
RERA Location Old Survey No 663 New Survey No 237
RERA Developer Span Venture
Architect Bharat Patel
Project RERA Details
Project Type Residential / Group Housing
Funding Bank STATE BANK OF INDIA
Last Modified 11 Aug 2017
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in

Facilities & Amenities
Facilities, Amenities & Common areas details of last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Not Completed
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Not Completed
Energy management
Not Completed
Fire Protection And Fire Safety Requirements
Not Completed
Landscaping & Tree Planting
Not Completed
Open Parking
Not Completed
Sewerage (Chamber, Lines, Septic Tank , STP)
Not Completed
Solid Waste Management And Disposal
Na
Storm Water Drains
Not Completed
Street Lighting
Not Completed
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Not Completed
Water Supply
Not Completed
Buildings / Wings in
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of by last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

60194 Sq. ft.

Project Area

9029 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

118 apartments in total
Total
118
Booked
5
Available
113

Saleable Area Statistics (Sq. ft.)

89518 Total
Total
89518
Booked
3966
Available
85552
Total 118 apartments in project. 5 apartments booked. 4% apartments booked.
Total 8316.46 saleable area. 368.47 apartments booked.
4% area booked.

Span Trident Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Span Trident Wing BJan 190023101216116
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK58.28 Sq.mts. ( 627 Sq.ft. )40
2.5 BHK69.86 Sq.mts. ( 752 Sq.ft. )40
None Booked0% Booked
0% Booked
3 BHK83.97 Sq.mts. ( 904 Sq.ft. )38
118 total apartments / 5 apartments booked. 4% apartments booked.
Work Description in Building Span Trident Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress33% done
33% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress25% done
25% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress25% done
25% Booked
Stilt Floor
work-in-progress25% done
25% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress33% done
33% Booked
Project Consultants
Channel Partners Registered by Developer
for Project
Span Trident Wing B
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation