Skycity Project at Andheri East by Mellora Infrastructure (P51800045767)
  • Rating:
  • ()

Skycity - Andheri East

Project Details, Configuration & Prices
Office1400 Sq.ft. Carpet ₹ 4.5 Cr++
Project overview
Skycity Project at Andheri East by Mellora Infrastructure (P51800045767) is a RERA approved Under Construction Project with RERA ID P51800045767 slated to be ready for possession by Apr 2026 with Office BHK apartments / Flats starting from ₹ 4.5 Crs onwards

Skycity is a Commercial Project Developed by the Mellora Infrastructure. It is located at Andheri East. 15 minutes from Andheri Railway Station and 5 minutes from Western Express Highway. Close proximity to Airport Road Metro Station and International Airport (T2 Terminal). 2 Basements + Ground & 1st Floor of Retail Space + 10 Floors for Premium Offices (G +11). Commercial spaces starting at carpet area 1400 Sq.Ft. with an option of entire floor spread across carpet area 14000 Sq.Ft. (approx). 2.65 Acres - (1.16 Acres for Commercial and Retail). Elegant Premium Commercial Tower with Sky Breakout Zone Amenities. Vastu Complaint Spaces. Self-contained offices with pantry & restroom. Common Restroom on each floor. Grand Entrance Lobby with Waiting Lounge. 11 ft floor-to-Ceiling height for each office. 3 branded passenger elevators & 1 service elevator. Provision for Electric Car Charge Station. The development comprises of most modern features for utmost business class.
Skycity QR Code
Skycity
MahaRERA - P51800045767

Vasant Blossom

₹ 1.7 Crs. onwards
Andheri East
2/3 BHK apartments
View Details

Lodha Acenza

₹ 4.88 Crs. onwards
Andheri East
3/4 BHK apartments
View Details

Dynamix Luma

₹ 2.19 Crs. onwards
Andheri East
2/3 BHK apartments
View Details

Horizon Heights

₹ 1.33 Crs. onwards
Andheri East
1/2/3 BHK apartments
View Details

Horizon Tower 1

₹ 2.81 Crs. onwards
Andheri East
3 BHK apartments
View Details

Ganga CHS

₹ 1.08 Crs. onwards
Andheri East
1/2/3 BHK apartments
View Details

Kalpataru Vivant North Wing B

₹ 2.16 Crs. onwards
Andheri East
2 BHK apartments
View Details

Kalpataru Vivant North Wing D

₹ 2.15 Crs. onwards
Andheri East
2 BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    Skycity
  • Location:
  • Andheri East, Next to Lalit Hotel
  • Const. Stage:
    Under Construction
  • Possession:
    Apr 2026
  • Floors:
    10
Developer Details

  • Developer:
    Mellora Infrastructure
  • Phone:
  • Website:
    https://www.mellorainfrastructure.com
  • Address:
  • Mittal Tower C, 13th floor, 135, Vidhan Bhavan Road, Nariman Point
Project Ratings
Project Amenities
Amenities offred in Skycity
LIFESTYLE AMENITIES
Power BackupHigh speed elevatorsGrand entrance lobbyIntercom/CCTVVideo Door PhonesAluminium Sliding WindowsPOP finished wallsImported Sanitary FittingsConcealed PlumbingConcealed WiringMarble flooringVitrified flooringReception Desk
Project RERA Details
RERA Project Status New
Proposed Possession 30 Apr 2026
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800045767
RERA Project Name The Skycity
RERA Location Cts No. 1405(Pt) Of Village Marol & Cts No. 1(Pt) Of Village Bapnala
RERA Developer Rappture Projects Private Limited
Architect Aakar Architects & Consultants
Project RERA Details
Project Type Commercial
Funding Bank STATE BANK OF INDIA
Last Modified 16 Jul 2025
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Andheri East

Facilities & Amenities
Facilities, Amenities & Common areas details of Skycitylast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
Only Transport Vehicles
Sewerage (Chamber, Lines, Septic Tank , STP)
Na
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
Na
Buildings / Wings in Skycity
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Skycityby Mellora Infrastructurelast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

50883 Sq. ft.

Project Area

7632 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

8 apartments in total
Total
8
Booked
0
Available
8

Saleable Area Statistics (Sq. ft.)

125495 Total
Total
125495
Booked
0
Available
125495
Total 8 apartments in project. 0 apartments booked. 0% apartments booked.
Total 11658.8 saleable area. 0 apartments booked.
0% area booked.

Skycity Commercial Building

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Skycity Commercial BuildingApr 20265130040
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Office space877.86 Sq.mts. ( 9449 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space1253.44 Sq.mts. ( 13492 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space1306.27 Sq.mts. ( 14061 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space1356.49 Sq.mts. ( 14601 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop280 Sq.mts. ( 3014 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop291.74 Sq.mts. ( 3140 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop328.89 Sq.mts. ( 3540 Sq.ft. )1
None Booked0% Booked
0% Booked
7 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Skycity Commercial BuildingCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Skycity Hotel Building

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Skycity Hotel BuildingApr 20261313000246
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
HOTEL5964.11 Sq.mts. ( 64198 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Skycity Hotel BuildingCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Project Consultants
Channel Partners Registered by Developer
Mellora Infrastructure
for Project
The Skycity
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Mellora Infrastructure