Siddharth Enclave Project at Lower Parel by Siddharth Group (P51900001979)
  • Rating: 5.0
  • (14)

Siddharth Enclave - Lower Parel

Siddharth Group
Project Details, Configuration & Prices (Exclusive of Stamp Duty Charges, GST Charges, Registration Charges & Maintenance Charges)
1 BHK365 Sq.ft. Carpet ₹ 1.49 Crore
1 BHK514 Sq.ft. Carpet ₹ 2.10 Crore
1 BHK591 Sq.ft. Carpet ₹ 2.42 Crore
Project overview
Siddharth Enclave Project at Lower Parel by Siddharth Group (P51900001979) a Sold Out Project with 1 BHK apartments / Flats starting from ₹ 1.5 Crs onwards

Siddharth Enclave, a joint venture by Siddharth Group and Rathod Group, is a highly exclusive project set in an enviable well reached location and a major business destination, Lower Parel. This project boasts proximity to an elite well developed commercial hub of South Mumbai and it is within 20 minutes it lies midway between Nariman Point to South & Bandra-Kurla Complex to North. Efficiency, sometimes just means savings time. MahaRERA for Siddharth Enclave is P51900001979.
Siddharth Enclave QR Code
Siddharth Enclave
MahaRERA - P51900001979

Lodha World One

₹ 14.5 Crs. onwards
Lower Parel
3/4/6 BHK apartments
View Details

Lodha Signet

₹ 3 Crs. onwards
Lower Parel
Office BHK apartments
View Details

Indiabulls Sky Forest

₹ 8.38 Crs. onwards
Lower Parel
3/3½/4/4½ BHK apartments
View Details

Rishabh Platina

₹ 6.75 Crs. onwards
Lower Parel
3 BHK apartments
View Details

Lodha World Crest

₹ 15.3 Crs. onwards
Lower Parel
3/4 BHK apartments
View Details

Lodha World View

₹ 11.51 Crs. onwards
Lower Parel
3/4 BHK apartments
View Details

Fortuna Blue

₹ 2.03 Crs. onwards
Lower Parel
1/2 BHK apartments
View Details

Lodha Vista

₹ 3.58 Crs. onwards
Lower Parel
2/3 BHK apartments
View Details
Project Details
Project details were last updated in Nov 2025
  • Project:
    Siddharth Enclave
  • Location:
  • Lower Parel, Opp Marathon Nex Gen, Off Senapati Bapat Marg
  • Const. Stage:
    Sold Out
  • Possession:
    Dec 2019
  • Parking:
    Stilt;
  • Floors:
    14
Developer Details

Siddharth Group

  • Developer:
    Siddharth Group
  • Phone:
    022 22673445
  • Website:
    www.siddharth-group.com
  • Address:
  • 205, Commerce House,140 Nagindas Master Road,Fort,Mumbai-400 023.
Project Ratings
Project Amenities
Amenities offred in Siddharth Enclave
LIFESTYLE AMENITIES
Grand entrance lobbyHigh speed elevatorsLandscaped gardenPower BackupKid's play areaVitrified flooringImported Sanitary FittingsPOP finished wallsVideo Door PhonesIntercom/CCTVGranite PlatformPiped GasDry Areas
Project RERA Details
RERA Project Status Ongoing
Proposed Possession 31 Dec 2019
Revised Possession 31 Dec 2019
Extended Possession 30 Jun 2025
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51900001979
RERA Project Name Siddharth Enclave
RERA Location 158
RERA Developer Siddharth Developers
Architect Ms Wairkar And Associates
Project RERA Details
Project Type Residential / Group Housing
Funding Bank HDFC BANK
Last Modified 16 Jul 2023
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Lower Parel

Facilities & Amenities
Facilities, Amenities & Common areas details of Siddharth Enclavelast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Will Be Completed Before Occupation
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station97% completed
97% Complete
Work In Progress
Energy management
Na
Fire Protection And Fire Safety Requirements95% completed
95% Complete
Work In Progress
Landscaping & Tree Planting
Will Be Completed Before Occupation
Open Parking
Will Be Completed Before Occupation
Sewerage (Chamber, Lines, Septic Tank , STP)98% completed
98% Complete
Work In Progress
Solid Waste Management And Disposal
Na
Storm Water Drains98% completed
98% Complete
Work In Progress
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting90% completed
90% Complete
Work In Progress
Water Supply100% completed
95% Complete
To Be Provided By Bmc
Buildings / Wings in Siddharth Enclave
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Siddharth Enclaveby Siddharth Group last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

24993 Sq. ft.

Project Area

2067 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

68 apartments in total
Total
68
Booked
62
Available
6

Saleable Area Statistics (Sq. ft.)

25680 Total
Total
25680
Booked
23513
Available
2167
Total 68 apartments in project. 62 apartments booked. 91% apartments booked.
Total 2385.76 saleable area. 2184.43 apartments booked.
92% area booked.

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingDec 2019151010325
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.95 Sq.mts. ( 365 Sq.ft. )12
10 Booked83% Booked
83% Booked
1 BHK34.04 Sq.mts. ( 366 Sq.ft. )44
41 Booked93% Booked
93% Booked
56 total apartments / 51 apartments booked. 91% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress95% done
95% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress95% done
95% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress95% done
95% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress95% done
95% Booked
Sanitary Fittings within the flats / premises
work-in-progress95% done
95% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress90% done
90% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress90% done
90% Booked
Stilt Floor
work-in-progress97% done
97% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress95% done
95% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C WingDec 20209101037
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.31 Sq.mts. ( 337 Sq.ft. )6
5 Booked83% Booked
83% Booked
2 BHK48.79 Sq.mts. ( 525 Sq.ft. )6
6 Booked100% Booked
100% Booked
12 total apartments / 11 apartments booked. 91% apartments booked.
Work Description in Building C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress98% done
98% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress95% done
95% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress95% done
95% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress88% done
88% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress95% done
95% Booked
Sanitary Fittings within the flats / premises
work-in-progress95% done
95% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress95% done
95% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress95% done
95% Booked
Stilt Floor
work-in-progress97% done
97% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress98% done
98% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Project Consultants
Channel Partners Registered by Developer
Siddharth Group
for Project
Siddharth Enclave
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Siddharth Group

Siddharth Group Founded in 1990, The Siddharth Group has forayed into diverse arenas, setting unmatched benchmarks for quality and ingenuity in its ambit of operations, along the way we have carved out a formidable reputation for unflinching commitments to quality in the fields of real estate and property development and manangement. Today we are firmly entrenched in the world of lifestyle construction through our innovative offerings. Our repertoire consists of resorts, townships, second homes, Housing for all income levels, and commercial complexes.