Shree Ram Nagar Complex Project at Virar by JSB Group (P99000048744)
  • Rating:
  • ()

Shree Ram Nagar Complex - Virar

JSB Group
Project Details, Configuration & Prices
Project overview
Shree Ram Nagar Complex Project at Virar by JSB Group (P99000048744) is a RERA approved Under Construction Project with RERA ID P99000048744 slated to be ready for possession by Dec 2026 with 1/2/3 BHK apartments / Flats starting from N/A onwards

Shree Ram Square is an iconic residential and commercial development spread across 0.99 acres in the well-connected neighbourhood of Shree Ram Nagar, Virar West. Designed as an integrated semi-commercial community, the project features a single premium tower with 65 exclusive units, offering a versatile mix of 1, 2 and 3 BHK apartments, villas, and commercial spaces under one address. Homes range from 292 sq.ft to 690 sq.ft, thoughtfully planned to provide comfort, efficiency and modern convenience. Scheduled for possession in December 2026, the project combines high-quality internal specifications such as concealed plumbing, branded sanitary ware, concealed copper wiring, tiled bathroom dado, standby power backup and 24x7 CCTV security. Residents and business owners can enjoy 25+ lifestyle amenities including a gymnasium, landscaped garden, kids' play area, gazebo seating zone, nested turf, a grand Level-3 podium, a plush entrance lobby, a spacious banquet hall and a dedicated parking tower. Seamlessly blending luxury living with commercial opportunities, Shree Ram Square offers a community where convenience, growth and modern living come together.
Shree Ram Nagar Complex QR Code
Shree Ram Nagar Complex
MahaRERA - P99000048744

Rustomjee Avenue L4

₹ 50.68 Lacs. onwards
Virar
1/2 BHK apartments
View Details
Virar
BHK apartments
View Details

Ekta Parksville

₹ 44.7 Lacs. onwards
Virar
2/3 BHK apartments
View Details

Brooklyn Park

₹ 44.27 Lacs. onwards
Virar
2 BHK apartments
View Details

Poonam Imperial

₹ 32 Lacs. onwards
Virar
1/2 BHK apartments
View Details

Sky City

₹ 37.35 Lacs. onwards
Virar
1/2 BHK apartments
View Details

Poonam Vista

₹ 40.6 Lacs. onwards
Virar
1/2/3 BHK apartments
View Details

Paradise Grandeur

₹ 71.8 Lacs. onwards
Virar
2/3 BHK apartments
View Details
Project Details
Project details were last updated in Dec 2025
  • Project:
    Shree Ram Nagar Complex
  • Location:
  • Virar, Sudham Shree Ram Nagar Complex
  • Const. Stage:
    Under Construction
  • Possession:
    Dec 2026
Developer Details

JSB Group

  • Developer:
    JSB Group
  • Phone:
    022 28746000
  • Website:
    www.jsbgroup.co.in
  • Address:
  • 1st Floor, Pratiek Plaza, S.V Road, Opp. Patel Pump, Goregaon (W), Mumbai - 400 062.
Project Ratings
Project Amenities
Amenities offred in Shree Ram Nagar Complex
LIFESTYLE AMENITIES
Indoor GamesKid's play areaGymnasiumClub HouseJogging TrackIntercom/CCTVPOP finished wallsConcealed PlumbingConcealed WiringGranite PlatformSecurity Help DeskReception Desk
Project RERA Details
RERA Project Status New
Proposed Possession 31 Dec 2026
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P99000048744
RERA Project Name Shree Ram Nagar Complex
RERA Location S. No. 302/1/1A, S. No. 302/1/1B, S. No. 302/1/1 Plot No. 1, S. No. 302/1/1 Plot No. 2, S. No. 302/ Plot No. 3, S No. 302/Plot No. 4, S. No. 302/ Plot No. 5 & S. No. 302/1/2/1
RERA Developer Sudham Lifespaces Llp
Architect Megha Urbanscapes
Project RERA Details
Project Type Others
Funding Bank HDFC BANK
Last Modified 17 Jan 2023
Last Retrived 28 Jul 2025

Most active Channel Partners, Real Estate Agents in Virar

Facilities & Amenities
Facilities, Amenities & Common areas details of Shree Ram Nagar Complexlast updated on 28 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station25% completed
25% Complete
Na
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)25% completed
25% Complete
Na
Solid Waste Management And Disposal
0%
Storm Water Drains
Na
Street Lighting25% completed
25% Complete
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
Na
Buildings / Wings in Shree Ram Nagar Complex
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Shree Ram Nagar Complexby JSB Grouplast updated on 28 Jul 2025 as per information obtained from MARA RERA. Disclaimer

43468 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

209 apartments in total
Total
209
Booked
0
Available
209

Saleable Area Statistics (Sq. ft.)

90774 Total
Total
90774
Booked
0
Available
90774
Total 209 apartments in project. 0 apartments booked. 0% apartments booked.
Total 8433.08 saleable area. 0 apartments booked.
0% area booked.

1A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
1ADec 20263101101
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
CAFE6.29 Sq.mts. ( 68 Sq.ft. )2
None Booked0% Booked
0% Booked
CAFE10 Sq.mts. ( 108 Sq.ft. )1
None Booked0% Booked
0% Booked
CAFE11.7 Sq.mts. ( 126 Sq.ft. )1
None Booked0% Booked
0% Booked
CAFE35.13 Sq.mts. ( 378 Sq.ft. )1
None Booked0% Booked
0% Booked
CAFE17.9 Sq.mts. ( 193 Sq.ft. )1
None Booked0% Booked
0% Booked
CAFE20.68 Sq.mts. ( 223 Sq.ft. )2
None Booked0% Booked
0% Booked
Office space24.43 Sq.mts. ( 263 Sq.ft. )5
None Booked0% Booked
0% Booked
Office space24.77 Sq.mts. ( 267 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space31.74 Sq.mts. ( 342 Sq.ft. )32
None Booked0% Booked
0% Booked
Office space33.72 Sq.mts. ( 363 Sq.ft. )2
None Booked0% Booked
0% Booked
Office space468.21 Sq.mts. ( 5040 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space40.61 Sq.mts. ( 437 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space42.8 Sq.mts. ( 461 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space13.65 Sq.mts. ( 147 Sq.ft. )16
None Booked0% Booked
0% Booked
Office space13.85 Sq.mts. ( 149 Sq.ft. )2
None Booked0% Booked
0% Booked
Office space14.83 Sq.mts. ( 160 Sq.ft. )2
None Booked0% Booked
0% Booked
Office space14.97 Sq.mts. ( 161 Sq.ft. )16
None Booked0% Booked
0% Booked
Office space15.17 Sq.mts. ( 163 Sq.ft. )2
None Booked0% Booked
0% Booked
Office space16.16 Sq.mts. ( 174 Sq.ft. )2
None Booked0% Booked
0% Booked
Office space16.18 Sq.mts. ( 174 Sq.ft. )16
None Booked0% Booked
0% Booked
Office space16.19 Sq.mts. ( 174 Sq.ft. )16
None Booked0% Booked
0% Booked
Shop47.27 Sq.mts. ( 509 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop68.44 Sq.mts. ( 737 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop70.49 Sq.mts. ( 759 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop102.28 Sq.mts. ( 1101 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop111.92 Sq.mts. ( 1205 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop129.83 Sq.mts. ( 1397 Sq.ft. )4
None Booked0% Booked
0% Booked
Shop130.23 Sq.mts. ( 1402 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop23.3 Sq.mts. ( 251 Sq.ft. )1
None Booked0% Booked
0% Booked
134 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building 1ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress30% done
30% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress57% done
57% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress40% done
40% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress50% done
50% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

1B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
1BDec 20262001101
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Villa106.35 Sq.mts. ( 1145 Sq.ft. )8
None Booked0% Booked
0% Booked
Villa109.11 Sq.mts. ( 1174 Sq.ft. )1
None Booked0% Booked
0% Booked
Villa161.03 Sq.mts. ( 1733 Sq.ft. )1
None Booked0% Booked
0% Booked
10 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building 1BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress30% done
30% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress57% done
57% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress40% done
40% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress50% done
50% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

1C - Wing A And Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
1C - Wing A And Wing BDec 20262210112011
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34 Sq.mts. ( 366 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK34.07 Sq.mts. ( 367 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK34.7 Sq.mts. ( 374 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK34.73 Sq.mts. ( 374 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK34.79 Sq.mts. ( 374 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK35.01 Sq.mts. ( 377 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK36.73 Sq.mts. ( 395 Sq.ft. )1
None Booked0% Booked
0% Booked
1RK27.1 Sq.mts. ( 292 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK44.77 Sq.mts. ( 482 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK45.27 Sq.mts. ( 487 Sq.ft. )3
None Booked0% Booked
0% Booked
2 BHK46.16 Sq.mts. ( 497 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK46.17 Sq.mts. ( 497 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK46.18 Sq.mts. ( 497 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK46.24 Sq.mts. ( 498 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK46.67 Sq.mts. ( 502 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK46.73 Sq.mts. ( 503 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK47.3 Sq.mts. ( 509 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK47.33 Sq.mts. ( 509 Sq.ft. )4
None Booked0% Booked
0% Booked
2 BHK47.54 Sq.mts. ( 512 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK47.79 Sq.mts. ( 514 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK47.82 Sq.mts. ( 515 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK47.98 Sq.mts. ( 516 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK48.02 Sq.mts. ( 517 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK49.09 Sq.mts. ( 528 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK49.1 Sq.mts. ( 529 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK49.15 Sq.mts. ( 529 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK49.78 Sq.mts. ( 536 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK49.98 Sq.mts. ( 538 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK52.41 Sq.mts. ( 564 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK57.34 Sq.mts. ( 617 Sq.ft. )2
None Booked0% Booked
0% Booked
3 BHK57.4 Sq.mts. ( 618 Sq.ft. )3
None Booked0% Booked
0% Booked
3 BHK57.6 Sq.mts. ( 620 Sq.ft. )3
None Booked0% Booked
0% Booked
3 BHK59.04 Sq.mts. ( 636 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK60.03 Sq.mts. ( 646 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK62.74 Sq.mts. ( 675 Sq.ft. )5
None Booked0% Booked
0% Booked
3 BHK62.86 Sq.mts. ( 677 Sq.ft. )2
None Booked0% Booked
0% Booked
3 BHK63.06 Sq.mts. ( 679 Sq.ft. )4
None Booked0% Booked
0% Booked
3 BHK64.07 Sq.mts. ( 690 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK51.28 Sq.mts. ( 552 Sq.ft. )1
None Booked0% Booked
0% Booked
65 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building 1C - Wing A And Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress35% done
35% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress25% done
25% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress83% done
83% Booked
Project Consultants
Channel Partners Registered by Developer
JSB Group
for Project
Shree Ram Nagar Complex
last updated on 28 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About JSB Group

JSB Group JSB Group is a reputed property development firm, committed to delivering high quality real estate services to its clients. We believe in delivering our promise. That’s why we are focused on becoming a leading real estate developer who delivers in time, as per budget, every time. It’s our passion for quality that has earned us our great reputation. Our distinctive culture celebrates people, partnership and sustainability. We are always exploring new ways for the construction industry to work together on strategic issues such as adapting to new technologies, reducing cost and at the same time increasing quality and boosting skills. We’re here to offer an enjoyable experience to our customers looking to make their most cherished purchase, their home.