Sethia Imperial Avenue Project at Malad East by Sethia Infrastructure (P51800015798)
  • Rating: 4.4
  • (82)

Sethia Imperial Avenue - Malad East

Sethia Infrastructure
Project Details, Configuration & Prices
1 BHK308 Sq.ft. Carpet ₹ 93 Lacs All In
1 BHK330 Sq.ft. Carpet ₹ sold out
1 BHK365 Sq.ft. Carpet ₹ sold out
Project overview
Sethia Imperial Avenue Project at Malad East by Sethia Infrastructure (P51800015798) is a Ready Possession Project with 1 BHK apartments / Flats starting from ₹ 70.84 Lakh onwards

Sethia Imperial Avenue is a Residential Project Developed by the Sethia Infrastructure. It is located at Malad East. Great connectivity, the suburb is accessible through the Western Express Highway. Just 5 minutes from Malad Station and 1 minute from the Metro Station. Close proximity to the malls, educational institutes, healthcare, entertainments etc. It is a 40 storey tower offering 1 BHK fully furnished residences with home appliances. Air conditioners in Master bedroom. Modern amenities like swimming pool, indoor games, guest accommodation etc.
Sethia Imperial Avenue QR Code
Sethia Imperial Avenue
MahaRERA - P51800015798

Raheja Residency

₹ 1.95 Crs. onwards
Malad East
2 BHK apartments
View Details

Center Plaza

₹ 72.21 Lacs. onwards
Malad East
Office BHK apartments
View Details
Malad East
Office BHK apartments
View Details

Alta Monte Tower B

₹ 2.6 Crs. onwards
Malad East
2/3/4 BHK apartments
View Details

Omkar Signet

₹ 95 Lacs. onwards
Malad East
1/2 BHK apartments
View Details

Highland 1978

₹ 1.11 Crs. onwards
Malad East
1/2 BHK apartments
View Details

Tower 28 - F

₹ 96.75 Lacs. onwards
Malad East
1/2/3 BHK apartments
View Details

DGS Sheetal Shree Ramkunj

₹ 88.97 Lacs. onwards
Malad East
1/2/3 BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    Sethia Imperial Avenue
  • Location:
  • Malad East, W.E Highway. Opp Times Of India
  • Const. Stage:
    Ready Possession
  • Possession:
  • Parking:
    Podium;
  • Floors:
    40
Developer Details

Sethia Infrastructure

  • Developer:
    Sethia Infrastructure
  • Phone:
    2228844444
  • Website:
    www.sethiainfra.com
  • Address:
  • 701, Center Plaza, Shivaji Chowk Daftary Road, Malad (E), Mumbai- 400097
Project Ratings
Project Brochures
Brochures of Sethia Imperial Avenueby Sethia Infrastructure
Project Brochures
  • MPE/Brochures/24878/Sethia Imperial Avenue Brochure.pdf
Project Amenities
Amenities offred in Sethia Imperial Avenue
LIFESTYLE AMENITIES
Power BackupOutdoor GamesIndoor GamesKid's play areaJogging TrackHigh speed elevatorsGrand entrance lobbyGymnasiumSwimming PoolIntercom/CCTVVideo Door PhonesAir ConditionersAluminium Sliding WindowsPOP finished wallsImported Sanitary FittingsConcealed PlumbingConcealed WiringMarble flooringVitrified flooringGranite PlatformSecurity Help DeskReception DeskMulti Purpose HallYoga Room
Project RERA Details
RERA Project Status New
Proposed Possession 30 Dec 2023
Revised Possession 01 Jan 1900
Extended Possession 29 Dec 2024
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800015798
RERA Project Name Sethia Imperial Avenue
RERA Location 123A, 9, 9A, 9A/1 To 57
RERA Developer Sai Enterprises
Architect T N Hassan
Project RERA Details
Project Type Residential / Group Housing
Funding Bank ICICI BANK LIMITED
Last Modified 02 Jun 2025
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Malad East

Facilities & Amenities
Facilities, Amenities & Common areas details of Sethia Imperial Avenuelast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Done
Energy management
Na
Fire Protection And Fire Safety Requirements80% completed
80% Complete
Done
Fitness Center100% completed
95% Complete
Done
Landscaping & Tree Planting100% completed
95% Complete
Done
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Done
Solid Waste Management And Disposal
Done
Storm Water Drains70% completed
70% Complete
Done
Street Lighting
Na
Swimming Pool100% completed
95% Complete
Done
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Done
Water Conservation, Rain water Harvesting100% completed
95% Complete
Done
Water Supply
Done
Buildings / Wings in Sethia Imperial Avenue
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sethia Imperial Avenueby Sethia Infrastructurelast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

18697 Sq. ft.

Project Area

1496 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

453 apartments in total
Total
453
Booked
422
Available
31

Saleable Area Statistics (Sq. ft.)

170736 Total
Total
170736
Booked
158503
Available
12232
Total 453 apartments in project. 422 apartments booked. 93% apartments booked.
Total 15861.72 saleable area. 14725.3 apartments booked.
93% area booked.

Sethia Imperial Avenue

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sethia Imperial AvenueDec 20224210100110
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.61 Sq.mts. ( 308 Sq.ft. )108
95 Booked87% Booked
87% Booked
1 BHK30.47 Sq.mts. ( 328 Sq.ft. )39
38 Booked97% Booked
97% Booked
1 BHK30.66 Sq.mts. ( 330 Sq.ft. )104
100 Booked96% Booked
96% Booked
1 BHK33.91 Sq.mts. ( 365 Sq.ft. )117
113 Booked96% Booked
96% Booked
2 BHK39.72 Sq.mts. ( 428 Sq.ft. )5
5 Booked100% Booked
100% Booked
2 BHK52.86 Sq.mts. ( 569 Sq.ft. )80
71 Booked88% Booked
88% Booked
453 total apartments / 422 apartments booked. 93% apartments booked.
Work Description in Building Sethia Imperial AvenueCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress75% done
75% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress75% done
75% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress90% done
90% Booked
Sanitary Fittings within the flats / premises
work-in-progress90% done
90% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Project Consultants
Channel Partners Registered by Developer
Sethia Infrastructure
for Project
Sethia Imperial Avenue
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Sethia Infrastructure

Sethia Infrastructure Established in 2000, with a firm view of providing value for money solutions in real estate, the Sethia Group today is a multi-faceted entity with projects that span the spectrum of the industry verticals, ranging from construction of residential, commercial and industrial Parks. The Sethia Group has a strong presence in the Western Suburbs of Mumbai with more than 5 million square feet of ongoing and planned development to their credit and a satisfied customer base of more than 5,000 happy families.