Seasons Green Project at Kalyan by Seasons Group (P51700051575)
  • Rating:
  • ()

Seasons Green - Kalyan

Project Details, Configuration & Prices
1 BHK367 Sq.ft. Carpet ₹ 39 Lacs All in
2 BHK507 Sq.ft. Carpet ₹ 59 Lacs All in
Project overview
Seasons Green Project at Kalyan by Seasons Group (P51700051575) is a RERA approved Under Construction Project with RERA ID P51700051575 slated to be ready for possession by Dec 2027 with 1/2 BHK apartments / Flats starting from ₹ 39 Lakh onwards

Seasons Green is a Residential Project Developed by the Seasons Group. It is located at Kalyan. Kalyan is well-connected to various parts of Mumbai and other regions. It has a major railway station, Kalyan Junction, which is one of the busiest railway stations in the MMR. It serves as a vital railway junction on the Central Line of the Mumbai Suburban Railway, providing easy access to Mumbai and beyond.Close proximity to the social infrastructure. The Project offers 1 and 2 BHK Residences. with greenery lifestyle. Amenities include Swimming pool, Jogging Track, Yoga & Meditation deck, Kids play area, Senior Sitting Area, Telescope Deck for Sky Gazing, Community hall, Gymnasium, Carrom Play, Chess, Working Desk and many more. Developer Possession: 2025
Seasons Green QR Code
Seasons Green
MahaRERA - P51700051575

Lodha Palava Aquaville

₹ 46.21 Lacs. onwards
Kalyan
1/1½/2/2½/3/5 BHK apartments
View Details

Birla Vanya

₹ 92.54 Lacs. onwards
Kalyan
2/3/4 BHK apartments
View Details

Metroplex

₹ 42.5 Lacs. onwards
Kalyan
1/2/2½ BHK apartments
View Details

Raunak City Phase 6

₹ 39.77 Lacs. onwards
Kalyan
1/2/3/4 BHK apartments
View Details

Tycoons Orbis

₹ 89.99 Lacs. onwards
Kalyan
2 BHK apartments
View Details

Kalyan Vihar

₹ 32.99 Lacs. onwards
Kalyan
1 BHK apartments
View Details

Hiranandani Woodspring

₹ 62.3 Lacs. onwards
Kalyan
1/2 BHK apartments
View Details

Cornerstone

₹ 55.1 Lacs. onwards
Kalyan
1/2 BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    Seasons Green
  • Location:
  • Kalyan, Opposite Green Acres Academy
  • Const. Stage:
    Under Construction
  • Possession:
    Dec 2027
Developer Details

  • Developer:
    Seasons Group
  • Phone:
  • Website:
  • Address:
  • Kalyan
Project Ratings
Project Brochures
Brochures of Seasons Greenby Seasons Group
Project Brochures
  • MPE/Brochures/30640/Season Green Brochure.pdf
Project Amenities
Amenities offred in Seasons Green
LIFESTYLE AMENITIES
Power BackupOutdoor GamesIndoor GamesKid's play areaJogging TrackHigh speed elevatorsGrand entrance lobbyGymnasiumSwimming PoolIntercom/CCTVVideo Door PhonesAluminium Sliding WindowsPOP finished wallsImported Sanitary FittingsConcealed PlumbingConcealed WiringMarble flooringVitrified flooringGranite PlatformSecurity Help DeskMulti Purpose HallYoga Room
Project RERA Details
RERA Project Status New
Proposed Possession 31 Dec 2027
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51700051575
RERA Project Name Seasons Green
RERA Location Survey No 16/2
RERA Developer Jai Balaji Sai Realtors
Architect Tejus Nirgude
Project RERA Details
Project Type Others
Funding Bank AXIS BANK
Last Modified 27 Jun 2023
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Kalyan

Facilities & Amenities
Facilities, Amenities & Common areas details of Seasons Greenlast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Na
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
Na
Buildings / Wings in Seasons Green
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Seasons Greenby Seasons Grouplast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

139555 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 8

Wings / Towers in Project

Apartments Statistics

489 apartments in total
Total
489
Booked
7
Available
482

Saleable Area Statistics (Sq. ft.)

163969 Total
Total
163969
Booked
2521
Available
161448
Total 489 apartments in project. 7 apartments booked. 1% apartments booked.
Total 15233.1 saleable area. 234.23 apartments booked.
2% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingDec 20277101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK43.09 Sq.mts. ( 464 Sq.ft. )42
None Booked0% Booked
0% Booked
1 BHK33.08 Sq.mts. ( 356 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK42.8 Sq.mts. ( 461 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop10.28 Sq.mts. ( 111 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop10.81 Sq.mts. ( 116 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop11.08 Sq.mts. ( 119 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop12 Sq.mts. ( 129 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop12.95 Sq.mts. ( 139 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop13.36 Sq.mts. ( 144 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop15.48 Sq.mts. ( 167 Sq.ft. )6
None Booked0% Booked
0% Booked
58 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress25% done
25% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress87% done
87% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress20% done
20% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress20% done
20% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress37% done
37% Booked

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingDec 20277101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.61 Sq.mts. ( 319 Sq.ft. )49
1 BHK32.18 Sq.mts. ( 346 Sq.ft. )3
None Booked0% Booked
0% Booked
1RK20.66 Sq.mts. ( 222 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK42.68 Sq.mts. ( 459 Sq.ft. )7
None Booked0% Booked
0% Booked
Shop10.28 Sq.mts. ( 111 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop10.81 Sq.mts. ( 116 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop12 Sq.mts. ( 129 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop13.36 Sq.mts. ( 144 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop15.48 Sq.mts. ( 167 Sq.ft. )6
None Booked0% Booked
0% Booked
73 total apartments / 1 apartments booked. 1% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress25% done
25% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress87% done
87% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress20% done
20% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress20% done
20% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C WingDec 20277101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK33.08 Sq.mts. ( 356 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK42.8 Sq.mts. ( 461 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK43.09 Sq.mts. ( 464 Sq.ft. )42
Shop10.28 Sq.mts. ( 111 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop10.59 Sq.mts. ( 114 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop10.81 Sq.mts. ( 116 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop11.08 Sq.mts. ( 119 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop11.28 Sq.mts. ( 121 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop11.43 Sq.mts. ( 123 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop12 Sq.mts. ( 129 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop12.95 Sq.mts. ( 139 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop13.36 Sq.mts. ( 144 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop15.48 Sq.mts. ( 167 Sq.ft. )6
None Booked0% Booked
0% Booked
60 total apartments / 2 apartments booked. 3% apartments booked.
Work Description in Building C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress20% done
20% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress20% done
20% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress20% done
20% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

D Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D WingDec 20277101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.61 Sq.mts. ( 319 Sq.ft. )49
None Booked0% Booked
0% Booked
2 BHK42.68 Sq.mts. ( 459 Sq.ft. )7
None Booked0% Booked
0% Booked
Shop10.28 Sq.mts. ( 111 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop10.81 Sq.mts. ( 116 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop12 Sq.mts. ( 129 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop13.36 Sq.mts. ( 144 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop15.48 Sq.mts. ( 167 Sq.ft. )11
None Booked0% Booked
0% Booked
74 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building D WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress20% done
20% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress20% done
20% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

E Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E WingDec 20277101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.61 Sq.mts. ( 319 Sq.ft. )49
2 BHK42.68 Sq.mts. ( 459 Sq.ft. )7
None Booked0% Booked
0% Booked
56 total apartments / 4 apartments booked. 7% apartments booked.
Work Description in Building E WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress22% done
22% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress20% done
20% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress20% done
20% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

F Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
F WingDec 20277101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.61 Sq.mts. ( 319 Sq.ft. )49
None Booked0% Booked
0% Booked
2 BHK42.68 Sq.mts. ( 459 Sq.ft. )7
None Booked0% Booked
0% Booked
56 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building F WingCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress20% done
20% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress20% done
20% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

G Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
G WingDec 20277101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.61 Sq.mts. ( 319 Sq.ft. )49
None Booked0% Booked
0% Booked
2 BHK42.68 Sq.mts. ( 459 Sq.ft. )7
None Booked0% Booked
0% Booked
56 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building G WingCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress20% done
20% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress20% done
20% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

H Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
H WingDec 20277101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.61 Sq.mts. ( 319 Sq.ft. )49
None Booked0% Booked
0% Booked
2 BHK42.68 Sq.mts. ( 459 Sq.ft. )7
None Booked0% Booked
0% Booked
56 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building H WingCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress20% done
20% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress20% done
20% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Project Consultants
Channel Partners Registered by Developer
Seasons Group
for Project
Seasons Green
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Seasons Group