Sayba Arcadia Project at Kurla by Sayba Group (P51800055257)
  • Rating:
  • ()

Sayba Arcadia - Kurla

Sayba Group
Project Details, Configuration & Prices
1 BHK387 Sq.ft. Carpet ₹ 90 Lacs ++
1 BHK406 Sq.ft. Carpet ₹ 95 Lakhs ++
1 BHK427 Sq.ft. Carpet ₹ 99 Lacs ++
1 BHK474 Sq.ft. Carpet ₹ 1.10 Cr ++
1 BHK513 Sq.ft. Carpet ₹ 1.19 Cr ++
Project overview
Sayba Arcadia Project at Kurla by Sayba Group (P51800055257) is a RERA approved Under Construction Project with RERA ID P51800055257 slated to be ready for possession by Mar 2026 with 1 BHK apartments / Flats starting from ₹ 0 onwards

Sayba Arcadia QR Code
Sayba Arcadia
MahaRERA - P51800055257

Jaswanti Bliss

₹ 1.98 Crs. onwards
Kurla
2 BHK apartments
View Details

Sayba Pearl Hans

₹ 1.02 Crs. onwards
Kurla
1/2 BHK apartments
View Details

Sayba Residency

₹ 99.22 Lacs. onwards
Kurla
1/2/3 BHK apartments
View Details

Advait Eternal

₹ 92 Lacs. onwards
Kurla
1/2 BHK apartments
View Details

Ruparel Urbana

₹ 94.9 Lacs. onwards
Kurla
1/2 BHK apartments
View Details

Roha Vatika

₹ 99.5 Lacs. onwards
Kurla
1/2 BHK apartments
View Details

Saffron Residency

₹ 2.55 Crs. onwards
Kurla
2 BHK apartments
View Details

Shiv Vaibhav

₹ 58.96 Lacs. onwards
Kurla
1/1 RK/2 BHK apartments
View Details
Project Details
Project details were last updated in Nov 2025
  • Project:
    Sayba Arcadia
  • Location:
  • Kurla, Vinobha Bhave Nagar, Premier Colony, Vidya Vihar Rd,
  • Const. Stage:
    Under Construction
  • Possession:
    Mar 2026
  • Floors:
    7
Developer Details

Sayba Group

  • Developer:
    Sayba Group
  • Phone:
  • Website:
  • Address:
  • Sayba Group, 3rd Floor, Star Heights, Bharat Cinema, Near Railway Station, Kurla- West, Kurla, Maharashtra, India 400070
Project Ratings
Project Amenities
Amenities offred in Sayba Arcadia
Project RERA Details
RERA Project Status New
Proposed Possession 31 Mar 2026
Revised Possession
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800055257
RERA Project Name Sayba Arcadia
RERA Location 917
RERA Developer Star Empire
Project RERA Details
Project Type Others
Funding Bank PUNJAB NATIONAL BANK
Last Modified 14 Mar 2024
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Kurla

Facilities & Amenities
Facilities, Amenities & Common areas details of Sayba Arcadialast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Wip
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Wip
Energy management
Na
Fire Protection And Fire Safety Requirements
Wip
Landscaping & Tree Planting
Wip
Open Parking
Wip
Sewerage (Chamber, Lines, Septic Tank , STP)
Wip
Solid Waste Management And Disposal90% completed
90% Complete
Wip
Storm Water Drains
Wip
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Wip
Water Supply
Wip
Buildings / Wings in Sayba Arcadia
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sayba Arcadiaby Sayba Grouplast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

13139 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

116 apartments in total
Total
116
Booked
0
Available
116

Saleable Area Statistics (Sq. ft.)

48185 Total
Total
48185
Booked
0
Available
48185
Total 116 apartments in project. 0 apartments booked. 0% apartments booked.
Total 4476.53 saleable area. 0 apartments booked.
0% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingMar 20262101005
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.83 Sq.mts. ( 386 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK37.71 Sq.mts. ( 406 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK39.63 Sq.mts. ( 427 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK40.49 Sq.mts. ( 436 Sq.ft. )7
None Booked0% Booked
0% Booked
Shop17.2 Sq.mts. ( 185 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop17.44 Sq.mts. ( 188 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop25.58 Sq.mts. ( 275 Sq.ft. )1
None Booked0% Booked
0% Booked
31 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress40% done
40% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress90% done
90% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress30% done
30% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress51% done
51% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress90% done
90% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress90% done
90% Booked

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingMar 20262101005
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.81 Sq.mts. ( 385 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK37.71 Sq.mts. ( 406 Sq.ft. )5
None Booked0% Booked
0% Booked
1 BHK39.63 Sq.mts. ( 427 Sq.ft. )6
None Booked0% Booked
0% Booked
1 BHK40.05 Sq.mts. ( 431 Sq.ft. )6
None Booked0% Booked
0% Booked
1 BHK40.25 Sq.mts. ( 433 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK40.59 Sq.mts. ( 437 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK53.44 Sq.mts. ( 575 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop36.59 Sq.mts. ( 394 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop13.15 Sq.mts. ( 142 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop22.69 Sq.mts. ( 244 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop24.26 Sq.mts. ( 261 Sq.ft. )1
None Booked0% Booked
0% Booked
31 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress40% done
40% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress90% done
90% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress30% done
30% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress51% done
51% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress90% done
90% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress90% done
90% Booked

C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C WingMar 20262101006
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.07 Sq.mts. ( 367 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK35.24 Sq.mts. ( 379 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK38.22 Sq.mts. ( 411 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK38.97 Sq.mts. ( 419 Sq.ft. )6
None Booked0% Booked
0% Booked
1 BHK41.19 Sq.mts. ( 443 Sq.ft. )6
None Booked0% Booked
0% Booked
1 BHK41.45 Sq.mts. ( 446 Sq.ft. )6
None Booked0% Booked
0% Booked
1 BHK46.73 Sq.mts. ( 503 Sq.ft. )7
None Booked0% Booked
0% Booked
28 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress40% done
40% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress90% done
90% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress30% done
30% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress51% done
51% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress90% done
90% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress90% done
90% Booked

D Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D WingMar 20262101006
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK40.55 Sq.mts. ( 436 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK41.45 Sq.mts. ( 446 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK47.65 Sq.mts. ( 513 Sq.ft. )7
None Booked0% Booked
0% Booked
Shop15.52 Sq.mts. ( 167 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop15.7 Sq.mts. ( 169 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop17.76 Sq.mts. ( 191 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop21.57 Sq.mts. ( 232 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop23.38 Sq.mts. ( 252 Sq.ft. )1
None Booked0% Booked
0% Booked
26 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building D WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress40% done
40% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress90% done
90% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress30% done
30% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress51% done
51% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress90% done
90% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress90% done
90% Booked
Project Consultants
Channel Partners Registered by Developer
Sayba Group
for Project
Sayba Arcadia
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Sayba Group

Sayba Group Sabya Group is a construction company that needs no introduction in the construction vertical. With a bounty of over 18 years of excellence in this Realty world, we, at Sayba Group have successfully completed 35 projects. We believe in delivering quality and strive to find better solutions for our clients. The priority of Sabya Group has been the timely delivery of projects. The Organization maintains a strong foundation of trust and mutual respect generated through positive relationship with clients, architects, engineers, subcontractors and suppliers.