Sai Orchid Project at Dombivali by Proviso Builder and Developers (P51700004806)
  • Rating: 3.8
  • (19)

Sai Orchid - Dombivali

Proviso Builder and Developers
Project Details, Configuration & Prices (Exclusive of Stamp Duty Charges, GST Charges, Registration Charges & Maintenance Charges)
Project overview
Sai Orchid Project at Dombivali by Proviso Builder and Developers (P51700004806) a Sold Out Project with 1/2 BHK apartments / Flats starting from ₹ 39 Lakh onwards

A place where you wake up with the chirping of birds, you enjoy meals with scenic beauty of mountains, cool breeze and twinkling stars are at your services to bring you deep slumber. Sai Orchid gives you a truly real lifestyle, a lifestyle that has the best to offer in terms of location, features and price. All the reasons you look for in a home are really all here. Welcome to Sai Orchid.
Sai Orchid QR Code
Sai Orchid
MahaRERA - P51700004806

Lodha Codename Central

₹ 49.82 Lacs. onwards
Dombivali
1/2/3 BHK apartments
View Details

Lodha Crown

₹ 36 Lacs. onwards
Dombivali
1/3 BHK apartments
View Details

Lodha Serenity

₹ 1.5 Crs. onwards
Dombivali
3/Duplex/Pent House BHK apartments
View Details

Runwal Gardens - Phase 1&2

₹ 79 Lacs. onwards
Dombivali
2/3 BHK apartments
View Details

Runwal My City - Phase 2

₹ 45 Lacs. onwards
Dombivali
1/2/3 BHK apartments
View Details

Sai world Dreams

₹ 48 Lacs. onwards
Dombivali
1/2/2½/3 BHK apartments
View Details

Central Avenue

₹ 45.5 Lacs. onwards
Dombivali
1/2 BHK apartments
View Details

Runwal My City - Cluster 5

₹ 41.5 Lacs. onwards
Dombivali
1/2/3 BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    Sai Orchid
  • Location:
  • Dombivali, Survey No – 120/7 A Behind, Regency Estate, Shiphata Kalyan Road, Village Dawadi
  • Const. Stage:
    Sold Out
  • Possession:
    Dec 2018
  • Floors:
    G+7
Developer Details

Proviso Builder and Developers

  • Developer:
    Proviso Builder and Developers
  • Phone:
    022 267676605
  • Website:
    www.proviso.in
  • Address:
  • 1201, 1202 Bhoomiraj Costa-rica Commercial Complex, Plot No. 1 & 1A, Sec.18, Off Palm Beach Road, Sanpada, Navi Mumbai. Maharashtra. India.
Project Ratings
Project Amenities
Amenities offred in Sai Orchid
LIFESTYLE AMENITIES
Health ClubGymnasiumHigh speed elevatorsLandscaped gardenKid's play areaSwimming PoolClub HouseIndoor GamesPower BackupVitrified flooringImported Sanitary FittingsPOP finished wallsIntercom/CCTVGranite Platform
Project RERA Details
RERA Project Status Ongoing
Proposed Possession 30 Jun 2021
Revised Possession 30 Jun 2021
Extended Possession 30 Jun 2024
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51700004806
RERA Project Name Sai Orchid Phase 1
RERA Location 120/7A
RERA Developer Gupta Builders And Developers
Architect Dilip Deshmukh And Associates Architect And Environment Planner
Project RERA Details
Project Type Residential / Group Housing
Funding Bank INDIAN OVERSEAS BANK
Last Modified 28 Apr 2023
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Dombivali

Facilities & Amenities
Facilities, Amenities & Common areas details of Sai Orchidlast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Open Area Available
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station50% completed
50% Complete
Work In Progress
Energy management50% completed
50% Complete
Work In Progress
Fire Protection And Fire Safety Requirements95% completed
95% Complete
On The Verge Of Completion
Landscaping & Tree Planting75% completed
75% Complete
Work In Progress
Open Parking100% completed
95% Complete
Open Parking Available
Sewerage (Chamber, Lines, Septic Tank , STP)95% completed
95% Complete
Works Almost Over
Solid Waste Management And Disposal
Na
Storm Water Drains90% completed
90% Complete
On The Verge Of Completion
Street Lighting50% completed
50% Complete
Eork In Progress
Treatment And Disposal Of Sewage And Sullage Water50% completed
50% Complete
Work In Progress
Water Conservation, Rain water Harvesting95% completed
95% Complete
On The Verge Of Completion
Water Supply80% completed
80% Complete
On The Verge Of Completion
Buildings / Wings in Sai Orchid
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sai Orchidby Proviso Builder and Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

91356 Sq. ft.

Project Area

9688 Sq. ft.

Recreational Open Space

Total 8

Wings / Towers in Project

Apartments Statistics

239 apartments in total
Total
239
Booked
141
Available
98

Saleable Area Statistics (Sq. ft.)

82974 Total
Total
82974
Booked
47120
Available
35854
Total 239 apartments in project. 141 apartments booked. 58% apartments booked.
Total 7708.49 saleable area. 4377.6 apartments booked.
57% area booked.

A1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A1Dec 20218111008
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 bhk24.88 Sq.mts. ( 268 Sq.ft. )15
9 Booked60% Booked
60% Booked
1 bhk25.4 Sq.mts. ( 273 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 bhk25.46 Sq.mts. ( 274 Sq.ft. )13
13 Booked100% Booked
100% Booked
1 RK15.38 Sq.mts. ( 166 Sq.ft. )1
None Booked0% Booked
0% Booked
30 total apartments / 23 apartments booked. 76% apartments booked.
Work Description in Building A1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

A2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A2Dec 20208111108
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 bhk24.88 Sq.mts. ( 268 Sq.ft. )15
14 Booked93% Booked
93% Booked
1 bhk25.46 Sq.mts. ( 274 Sq.ft. )13
1 RK15.38 Sq.mts. ( 166 Sq.ft. )1
None Booked0% Booked
0% Booked
29 total apartments / 15 apartments booked. 51% apartments booked.
Work Description in Building A2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

B1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B1Dec 20208111208
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 bhk24.88 Sq.mts. ( 268 Sq.ft. )15
8 Booked53% Booked
53% Booked
1 bhk25.41 Sq.mts. ( 274 Sq.ft. )12
11 Booked91% Booked
91% Booked
1bhk25.14 Sq.mts. ( 271 Sq.ft. )2
2 Booked100% Booked
100% Booked
1RK15.33 Sq.mts. ( 165 Sq.ft. )1
None Booked0% Booked
0% Booked
30 total apartments / 21 apartments booked. 70% apartments booked.
Work Description in Building B1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

B2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B2Dec 20208111208
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 bhk24.88 Sq.mts. ( 268 Sq.ft. )16
11 Booked68% Booked
68% Booked
1 bhk25.41 Sq.mts. ( 274 Sq.ft. )14
14 Booked100% Booked
100% Booked
1 RK15.33 Sq.mts. ( 165 Sq.ft. )1
None Booked0% Booked
0% Booked
31 total apartments / 25 apartments booked. 80% apartments booked.
Work Description in Building B2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

C1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C1Dec 202081110014
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2bhk37.11 Sq.mts. ( 399 Sq.ft. )14
14 Booked100% Booked
100% Booked
2bhk42.11 Sq.mts. ( 453 Sq.ft. )14
10 Booked71% Booked
71% Booked
28 total apartments / 24 apartments booked. 85% apartments booked.
Work Description in Building C1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

C2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C2Dec 202081110014
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 bhk42.11 Sq.mts. ( 453 Sq.ft. )21
7 Booked33% Booked
33% Booked
2bhk37.11 Sq.mts. ( 399 Sq.ft. )14
4 Booked28% Booked
28% Booked
35 total apartments / 11 apartments booked. 31% apartments booked.
Work Description in Building C2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

D1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D1Dec 202081010117
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 bhk37.11 Sq.mts. ( 399 Sq.ft. )14
3 Booked21% Booked
21% Booked
2 bhk42.11 Sq.mts. ( 453 Sq.ft. )14
5 Booked35% Booked
35% Booked
28 total apartments / 8 apartments booked. 28% apartments booked.
Work Description in Building D1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

D2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D2Dec 202081010109
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 bhk37.11 Sq.mts. ( 399 Sq.ft. )14
6 Booked42% Booked
42% Booked
2 bhk42.11 Sq.mts. ( 453 Sq.ft. )14
8 Booked57% Booked
57% Booked
28 total apartments / 14 apartments booked. 50% apartments booked.
Work Description in Building D2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Project Consultants
Channel Partners Registered by Developer
Proviso Builder and Developers
for Project
Sai Orchid Phase 1
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Proviso Builder and Developers

Proviso Builder and Developers Proviso, a renowned name since 2 decades, is synonymous with quality and affordable housing in Navi Mumbai. Its founder and chairman, Mr. Brij Gupta, a graduate from IIT BHU believes in the business principle that we make profit only if our customers and investors make profit. Proviso’s core business principle is to give the best return on investment to our customers and investors. We value the hard-earned money they invest in our projects and we endeavour to ensure that their money has been invested absolutely safely. Our business primarily comes from repeat business as we believe not just in customer satisfaction but also in customer delight. Proviso’s main business assets and success are its customers.