Ruparel Urbana Project at Kurla by Ruparel Realty (P51800077585)
  • Rating:
  • ()

Ruparel Urbana - Kurla

Ruparel Realty
Project Details, Configuration & Prices
1 BHK390 Sq.ft. Carpet ₹ 94.9 Lakhs All In
2 BHK454 Sq.ft. Carpet ₹ 1.15 Cr All In
2 BHK595 Sq.ft. Carpet ₹ 1.49 Cr All In
Project overview
Ruparel Urbana Project at Kurla by Ruparel Realty (P51800077585) is a RERA approved Under Construction Project with RERA ID P51800077585 slated to be ready for possession by Dec 2028 with 1/2 BHK apartments / Flats starting from ₹ 94.9 Lakh onwards

Welcome to Ruparel Urbana, a mega-lifestyle district that redefines modern living in Kurla (E), Off Eastern Express Highway. This premium development offers an unmatched combination of 1 & 2 BHK smartly designed residences, high-street retail spaces, and premium office hubs, making it the largest residential and commercial district in Kurla. Ideally located just 3 minutes from Eastern Express Highway and 10 minutes from BKC, it offers seamless connectivity while providing a lifestyle that’s both luxurious and accessible. Unlike traditional standalone towers, Ruparel Urbana is designed to be a self-sufficient urban hub, ensuring convenience, exclusivity, and a thriving community atmosphere. Ruparel Urbana features 20+ ultra-modern rooftop amenities above 200 feet, offering a sky-lifestyle experience like never before. From health and recreation avenues to premium club life, every detail has been thoughtfully planned to enhance everyday living. The project also introduces Kurla’s biggest high-street shopping district, bringing exclusive retail spaces and big-brand stores right to your doorstep. With efficiently designed homes, zero space wastage, and a pre-launch price significantly lower than neighboring Sion and Chembur, this is an unprecedented opportunity to live next to BKC at a fraction of the cost. Experience a lifestyle revolution at Ruparel Urbana, where luxury meets affordability in the heart of Mumbai.
Ruparel Urbana QR Code
Ruparel Urbana
MahaRERA - P51800077585

Jaswanti Bliss

₹ 1.98 Crs. onwards
Kurla
2 BHK apartments
View Details

Sayba Pearl Hans

₹ 1.02 Crs. onwards
Kurla
1/2 BHK apartments
View Details

Sayba Residency

₹ 99.22 Lacs. onwards
Kurla
1/2/3 BHK apartments
View Details

Advait Eternal

₹ 92 Lacs. onwards
Kurla
1/2 BHK apartments
View Details

Roha Vatika

₹ 99.5 Lacs. onwards
Kurla
1/2 BHK apartments
View Details

Saffron Residency

₹ 2.55 Crs. onwards
Kurla
2 BHK apartments
View Details

Shiv Vaibhav

₹ 58.96 Lacs. onwards
Kurla
1/1 RK/2 BHK apartments
View Details

East Point Plaza

₹ 99 Lacs. onwards
Kurla
Office BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    Ruparel Urbana
  • Location:
  • Kurla, Off EEH, Naik Nagar
  • Const. Stage:
    Under Construction
  • Possession:
    Dec 2028
  • Parking:
    Open Reserved;
  • Floors:
    18
Developer Details

Ruparel Realty

  • Developer:
    Ruparel Realty
  • Phone:
  • Website:
    www.ruparel.in
  • Address:
  • Ruparel Realty, Ruparel Iris, Senapati Bapad Marg, Next to Big Bazaar, Opp Matunga Road West Station, Matunga West
Project Ratings
Project Amenities
Amenities offred in Ruparel Urbana
LIFESTYLE AMENITIES
Air Conditioned LobbyHigh speed elevatorsGrand entrance lobbyAluminium Sliding WindowsPOP finished wallsImported Sanitary FittingsConcealed PlumbingConcealed WiringGranite PlatformSecurity Help DeskReception Desk
Project RERA Details
RERA Project Status New
Proposed Possession 31 Dec 2028
Revised Possession
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800077585
RERA Project Name Ruparel Urbana
RERA Location 112 & 113
RERA Developer R R Builders
Architect Mr Rahul Kamathi
Project RERA Details
Project Type Others
Funding Bank ICICI BANK LIMITED
Last Modified 15 Oct 2024
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Kurla

Facilities & Amenities
Facilities, Amenities & Common areas details of Ruparel Urbanalast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Prior To Oc
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Prior To Oc
Energy management
Prior To Oc
Fire Protection And Fire Safety Requirements
Prior To Oc
Landscaping & Tree Planting
Prior To Oc
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Prior To Oc
Solid Waste Management And Disposal
Prior To Oc
Storm Water Drains
Prior To Oc
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Prior To Oc
Water Conservation, Rain water Harvesting
Prior To Oc
Water Supply
Prior To Oc
Buildings / Wings in Ruparel Urbana
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Ruparel Urbanaby Ruparel Realtylast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

53811 Sq. ft.

Project Area

4305 Sq. ft.

Recreational Open Space

Total 7

Wings / Towers in Project

Apartments Statistics

490 apartments in total
Total
490
Booked
0
Available
490

Saleable Area Statistics (Sq. ft.)

265099 Total
Total
265099
Booked
0
Available
265099
Total 490 apartments in project. 0 apartments booked. 0% apartments booked.
Total 24628.28 saleable area. 0 apartments booked.
0% area booked.

Ruparel Urbana Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ruparel Urbana Wing ADec 2028181100028
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1.5 BHK Tenants42.15 Sq.mts. ( 454 Sq.ft. )66
None Booked0% Booked
0% Booked
Dep. Store Sale Comm2097.59 Sq.mts. ( 22578 Sq.ft. )1
None Booked0% Booked
0% Booked
67 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Ruparel Urbana Wing ACompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Ruparel Urbana Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ruparel Urbana Wing BDec 2028181100028
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1.5 BHK Tenants42.09 Sq.mts. ( 453 Sq.ft. )15
None Booked0% Booked
0% Booked
1.5 BHK Tenants42.15 Sq.mts. ( 454 Sq.ft. )50
None Booked0% Booked
0% Booked
2 BHK Sale Resi55.04 Sq.mts. ( 592 Sq.ft. )1
None Booked0% Booked
0% Booked
66 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Ruparel Urbana Wing BCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Ruparel Urbana Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ruparel Urbana Wing CDec 2028181100084
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK Sale Resi36.25 Sq.mts. ( 390 Sq.ft. )36
None Booked0% Booked
0% Booked
2 BHK Sale Resi55.31 Sq.mts. ( 595 Sq.ft. )30
None Booked0% Booked
0% Booked
2.5 BHK Sale Resi71.09 Sq.mts. ( 765 Sq.ft. )1
None Booked0% Booked
0% Booked
67 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Ruparel Urbana Wing CCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Ruparel Urbana Wing D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ruparel Urbana Wing DDec 2028181100098
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK Sale Resi36.25 Sq.mts. ( 390 Sq.ft. )33
None Booked0% Booked
0% Booked
2 BHK Sale Resi55.45 Sq.mts. ( 597 Sq.ft. )16
None Booked0% Booked
0% Booked
2 BHK Sale Resi55.68 Sq.mts. ( 599 Sq.ft. )15
None Booked0% Booked
0% Booked
2 BHK Sale Resi56.71 Sq.mts. ( 610 Sq.ft. )16
None Booked0% Booked
0% Booked
80 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Ruparel Urbana Wing DCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Ruparel Urbana Wing E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ruparel Urbana Wing EDec 2028181000080
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK Sale Resi36.24 Sq.mts. ( 390 Sq.ft. )18
None Booked0% Booked
0% Booked
2 BHK Sale Resi55.31 Sq.mts. ( 595 Sq.ft. )51
None Booked0% Booked
0% Booked
2.5 BHK Sale Resi71.09 Sq.mts. ( 765 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop Sale Commercial37.55 Sq.mts. ( 404 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop Sale Commercial37.66 Sq.mts. ( 405 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop Sale Commercial18.15 Sq.mts. ( 195 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop Sale Commercial27.89 Sq.mts. ( 300 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop Sale Commercial30.5 Sq.mts. ( 328 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop Sale Commercial34.08 Sq.mts. ( 367 Sq.ft. )1
None Booked0% Booked
0% Booked
76 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Ruparel Urbana Wing ECompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Ruparel Urbana Wing F

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ruparel Urbana Wing FDec 2028181000060
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK Sale Resi36.25 Sq.mts. ( 390 Sq.ft. )16
None Booked0% Booked
0% Booked
1 BHK Sale Resi39.28 Sq.mts. ( 423 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK Sale Resi55.26 Sq.mts. ( 595 Sq.ft. )18
None Booked0% Booked
0% Booked
2 BHK Sale Resi55.31 Sq.mts. ( 595 Sq.ft. )17
None Booked0% Booked
0% Booked
Shop Sale commercial11.4 Sq.mts. ( 123 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop Sale Commercial15.23 Sq.mts. ( 164 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop Sale Commercial15.57 Sq.mts. ( 168 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop Sale Commercial17.35 Sq.mts. ( 187 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop Sale Commercial17.96 Sq.mts. ( 193 Sq.ft. )1
None Booked0% Booked
0% Booked
57 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Ruparel Urbana Wing FCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Ruparel Urbana Wing G

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ruparel Urbana Wing GDec 2028181000080
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK Sale Resi36.24 Sq.mts. ( 390 Sq.ft. )18
None Booked0% Booked
0% Booked
2 BHK Sale Resi55.31 Sq.mts. ( 595 Sq.ft. )51
None Booked0% Booked
0% Booked
2.5 BHK Sale Resi71.09 Sq.mts. ( 765 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop Sale Commercial40.06 Sq.mts. ( 431 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop Sale Commercial18.15 Sq.mts. ( 195 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop Sale Commercial18.45 Sq.mts. ( 199 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop Sale Commercial25.26 Sq.mts. ( 272 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop Sale Commercial26.2 Sq.mts. ( 282 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop Sale Commercial27.29 Sq.mts. ( 294 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop Sale Commercial32.08 Sq.mts. ( 345 Sq.ft. )1
None Booked0% Booked
0% Booked
77 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Ruparel Urbana Wing GCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Project Consultants
Channel Partners Registered by Developer
Ruparel Realty
for Project
Ruparel Urbana
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Ruparel Realty

Ruparel Realty Established in the year 2000, Ruparel Realty, has been constructing numerous Residential & Commercial marvels that have carved a unique niche in the world of construction. The group is currently constructing 2 million sq.ft in the prime lands of Mumbai Metropolitan Region with 2.5 lac delivered sq.ft in Navi Mumbai Metropolitan Region.The Group works with the top names in Real Estate like JW Consultants, Aakar Architects & Consultants, Eskayem Consultants, ACC and Skyway RMC to ensure timely completion of projects with no compromise in quality standards with latest construction technologies.Since its inception the company has launched 9 projects, with notable developments like Ruparel Ariana, Ruparel Iris, Ruparel Orion and Sea Palace. In the past 18 months, the group has acquired 20 acre land in Kandivali west, 5 acre lands in Parel and other developments in Western and Central suburbs. With its mass presence across the most desired areas in Mumbai, the group is on the road of substantial success.