Ruparel Stardom Project at Malad West by Ruparel Realty (P51800055521)
  • Rating:
  • ()

Ruparel Stardom - Malad West

Ruparel Realty
Project Details, Configuration & Prices
1 BHK441 Sq.ft. Carpet ₹ 1.21 Cr All In
2 BHK744 Sq.ft. Carpet ₹ 2.25 Cr All In
3 BHK833 Sq.ft. Carpet ₹ 2.69 Cr All In
3 BHK1259 Sq.ft. Carpet ₹ 3.80 Cr All In
Project overview
Ruparel Stardom Project at Malad West by Ruparel Realty (P51800055521) is a RERA approved Under Construction Project with RERA ID P51800055521 slated to be ready for possession by Jun 2028 with 1/2/3 BHK apartments / Flats starting from ₹ 1.21 Crs onwards

Ruparel Stardom, nestled in the lifestyle capital of Malad, Evershine Nagar, epitomizes luxury and convenience. Its prestigious locale in Evershine Nagar offers an elegant and successful living experience. This address combines sophistication with vibrant social avenues and a pulsating cultural scene, making it highly desirable. With its perfect blend of elegance, space, and style, Ruparel Stardom promises a blockbuster life. Enjoying the convenience of Malad's lifestyle hub, residents can immerse themselves in a luxurious ambiance. Ruparel Stardom stands as a symbol of elegance, offering residents a truly remarkable living experience in the heart of Evershine Nagar.
Ruparel Stardom QR Code
Ruparel Stardom
MahaRERA - P51800055521

Marina Enclave

₹ 1.41 Crs. onwards
Malad West
2/3 BHK apartments
View Details

9 Business Bay

₹ 1.41 Crs. onwards
Malad West
Office BHK apartments
View Details

Auris Clara

₹ 1.79 Crs. onwards
Malad West
2/3 BHK apartments
View Details

Raheja Exotica Siena

₹ 85 Lacs. onwards
Malad West
1 BHK apartments
View Details

Arkade Eden

₹ 2.24 Crs. onwards
Malad West
2/3 BHK apartments
View Details

Auris Ilaria

₹ 1.08 Crs. onwards
Malad West
1/2/3 BHK apartments
View Details

Sheth Irene

₹ 1.1 Crs. onwards
Malad West
1/2 BHK apartments
View Details

Raheja Exotica Verona

₹ 3.4 Crs. onwards
Malad West
3/4 BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    Ruparel Stardom
  • Location:
  • Malad West, New Link Road
  • Const. Stage:
    Under Construction
  • Possession:
    Jun 2028
  • Floors:
    49
Developer Details

Ruparel Realty

  • Developer:
    Ruparel Realty
  • Phone:
  • Website:
    www.ruparel.in
  • Address:
  • Ruparel Realty, Ruparel Iris, Senapati Bapad Marg, Next to Big Bazaar, Opp Matunga Road West Station, Matunga West
Project Ratings
Project Brochures
Brochures of Ruparel Stardomby Ruparel Realty
Project Brochures
  • MPE/Brochures/30917/ruparel brochure.pdf
  • MPE/Brochures/30917/plans.pdf
Project Amenities
Amenities offred in Ruparel Stardom
LIFESTYLE AMENITIES
Power BackupIndoor GamesAir Conditioned LobbyAir ConditionersAluminium Sliding WindowsImported Sanitary FittingsConcealed PlumbingKitchen CabinetsGranite PlatformSecurity Help DeskReception Desk
Project RERA Details
RERA Project Status New
Proposed Possession 30 Jun 2028
Revised Possession
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800055521
RERA Project Name Ruparel Stardom
RERA Location 307/13, 307/14, 307/15
RERA Developer Ami Modispaces Llp
Architect Rahul Kamati
Project RERA Details
Project Type Residential / Group Housing
Funding Bank ICICI BANK LIMITED
Last Modified 02 Apr 2024
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Malad West

Facilities & Amenities
Facilities, Amenities & Common areas details of Ruparel Stardomlast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Before Oc
Energy management
Na
Fire Protection And Fire Safety Requirements
Before Oc
Landscaping & Tree Planting
Before Oc
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Na
Solid Waste Management And Disposal
Before Oc
Storm Water Drains
Before Oc
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Before Oc
Water Supply
Before Oc
Buildings / Wings in Ruparel Stardom
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Ruparel Stardomby Ruparel Realtylast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

123808 Sq. ft.

Project Area

11537 Sq. ft.

Recreational Open Space

Total 5

Wings / Towers in Project

Apartments Statistics

770 apartments in total
Total
770
Booked
0
Available
770

Saleable Area Statistics (Sq. ft.)

391947 Total
Total
391947
Booked
0
Available
391947
Total 770 apartments in project. 0 apartments booked. 0% apartments booked.
Total 36412.79 saleable area. 0 apartments booked.
0% area booked.

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing AJun 20283910080899
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK39.1 Sq.mts. ( 421 Sq.ft. )9
None Booked0% Booked
0% Booked
1 BHK44.44 Sq.mts. ( 478 Sq.ft. )3
None Booked0% Booked
0% Booked
2 BHK49.41 Sq.mts. ( 532 Sq.ft. )3
None Booked0% Booked
0% Booked
2 BHK60.94 Sq.mts. ( 656 Sq.ft. )11
None Booked0% Booked
0% Booked
3 BHK75.56 Sq.mts. ( 813 Sq.ft. )7
None Booked0% Booked
0% Booked
Shop84.78 Sq.mts. ( 913 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop100.11 Sq.mts. ( 1078 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop119.39 Sq.mts. ( 1285 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop129.96 Sq.mts. ( 1399 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop145.03 Sq.mts. ( 1561 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop171.23 Sq.mts. ( 1843 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop207.38 Sq.mts. ( 2232 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop421.13 Sq.mts. ( 4533 Sq.ft. )1
None Booked0% Booked
0% Booked
Tenant71.58 Sq.mts. ( 770 Sq.ft. )24
None Booked0% Booked
0% Booked
Tenant55.62 Sq.mts. ( 599 Sq.ft. )16
None Booked0% Booked
0% Booked
Tenant47.79 Sq.mts. ( 514 Sq.ft. )59
None Booked0% Booked
0% Booked
Tenant42.27 Sq.mts. ( 455 Sq.ft. )15
None Booked0% Booked
0% Booked
Tenant42.88 Sq.mts. ( 462 Sq.ft. )41
None Booked0% Booked
0% Booked
Tenant36.17 Sq.mts. ( 389 Sq.ft. )48
None Booked0% Booked
0% Booked
246 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BJun 202828100800
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
PTC27.88 Sq.mts. ( 300 Sq.ft. )116
None Booked0% Booked
0% Booked
Shop148.92 Sq.mts. ( 1603 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop219.98 Sq.mts. ( 2368 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop234.97 Sq.mts. ( 2529 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop579.8 Sq.mts. ( 6241 Sq.ft. )1
None Booked0% Booked
0% Booked
120 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Excavation
work-in-progress80% done
80% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CJun 202827100800
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK68.3 Sq.mts. ( 735 Sq.ft. )38
None Booked0% Booked
0% Booked
2 BHK68.47 Sq.mts. ( 737 Sq.ft. )38
None Booked0% Booked
0% Booked
3 BHK105.08 Sq.mts. ( 1131 Sq.ft. )17
None Booked0% Booked
0% Booked
Shop132.48 Sq.mts. ( 1426 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop152.51 Sq.mts. ( 1642 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop161.56 Sq.mts. ( 1739 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop202.68 Sq.mts. ( 2182 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop239.09 Sq.mts. ( 2574 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop265.17 Sq.mts. ( 2854 Sq.ft. )1
None Booked0% Booked
0% Booked
99 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing CCompletion
Basement (if any)
work-in-progress80% done
80% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
work-in-progress80% done
80% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing DJun 202836100800
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK40.3 Sq.mts. ( 434 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK40.42 Sq.mts. ( 435 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK40.58 Sq.mts. ( 437 Sq.ft. )1
None Booked0% Booked
0% Booked
Rehab39.04 Sq.mts. ( 420 Sq.ft. )66
None Booked0% Booked
0% Booked
Rehab39.38 Sq.mts. ( 424 Sq.ft. )60
None Booked0% Booked
0% Booked
Rehab39.54 Sq.mts. ( 426 Sq.ft. )65
None Booked0% Booked
0% Booked
195 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing DCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing EJun 202823100800
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
PTC Tenant27.88 Sq.mts. ( 300 Sq.ft. )110
None Booked0% Booked
0% Booked
110 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing ECompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Project Consultants
Channel Partners Registered by Developer
Ruparel Realty
for Project
Ruparel Stardom
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Ruparel Realty

Ruparel Realty Established in the year 2000, Ruparel Realty, has been constructing numerous Residential & Commercial marvels that have carved a unique niche in the world of construction. The group is currently constructing 2 million sq.ft in the prime lands of Mumbai Metropolitan Region with 2.5 lac delivered sq.ft in Navi Mumbai Metropolitan Region.The Group works with the top names in Real Estate like JW Consultants, Aakar Architects & Consultants, Eskayem Consultants, ACC and Skyway RMC to ensure timely completion of projects with no compromise in quality standards with latest construction technologies.Since its inception the company has launched 9 projects, with notable developments like Ruparel Ariana, Ruparel Iris, Ruparel Orion and Sea Palace. In the past 18 months, the group has acquired 20 acre land in Kandivali west, 5 acre lands in Parel and other developments in Western and Central suburbs. With its mass presence across the most desired areas in Mumbai, the group is on the road of substantial success.