Runwal Pinnacle Project at Mulund West by Runwal Group (P51800021322)
  • Rating: 5.0
  • (30)

Runwal Pinnacle - Mulund West

Runwal Group
Project Details, Configuration & Prices
1 BHK461 Sq.ft. Carpet ₹ 1.29 Cr ++
2 BHK606 Sq.ft. Carpet ₹ 1.89 Cr ++
3 BHK861 Sq.ft. Carpet ₹ 2.21 Cr ++
3 BHK1005 Sq.ft. Carpet ₹ 2.60++
Project overview
Runwal Pinnacle Project at Mulund West by Runwal Group (P51800021322) is a RERA approved Under Construction Project with RERA ID P51800021322 slated to be ready for possession by Jun 2026 with 1/2/3 BHK apartments / Flats starting from ₹ 1.17 Crs onwards

Runwal Pinnacle is a residential project developed by Runwal Group, one of India's top real estate developers. It is located in Mulund West, Mumbai. The location of Runwal Pinnacle in Mulund West is one of its key advantages. Mulund West is a highly desirable neighbourhood in Mumbai that offers excellent connectivity to other parts of the city. It is well-connected to major roads, railway stations, metro stations, and bus stations, making commuting convenient for residents. The area also provides numerous options for retail shopping and fulfilling daily needs. It is a 67 storey tower with 1,2 and 3 BHK Residences. One of the tallest towers in Mumbai. Panoramic views of Mangroves and Sanjay Gandhi National Park. 9 levels of elevated car park. 2 levels dedicated to clubs and recreational amenities. The apartments are designed to provide a comfortable living experience with spacious rooms, high-quality finishes, and modern amenities. Runwal Group, the developer behind Runwal Pinnacle, is a renowned and trusted name in the real estate industry. They have a track record of delivering quality projects and ensuring customer satisfaction. Runwal Group focuses on creating homes that meet the highest standards of design, functionality, and comfort. Runwal Group, the developer behind Runwal Pinnacle, is a renowned and trusted name in the real estate industry. They have a track record of delivering quality projects and ensuring customer satisfaction. Runwal Group focuses on creating homes that meet the highest standards of design, functionality, and comfort.
Runwal Pinnacle QR Code
Runwal Pinnacle
MahaRERA - P51800021322

Oberoi Eternia

₹ 2.68 Crs. onwards
Mulund West
3 BHK apartments
View Details

Oberoi Enigma

₹ 3.55 Crs. onwards
Mulund West
3/4 BHK apartments
View Details

The Gateway

₹ 69.32 Lacs. onwards
Mulund West
Office BHK apartments
View Details

Ashford Regal

₹ 96 Lacs. onwards
Mulund West
1/2/3½ BHK apartments
View Details

Piramal Revanta Vana

₹ 2.59 Crs. onwards
Mulund West
2/2½/3 BHK apartments
View Details

Prestige Forest Hills

₹ 2.67 Crs. onwards
Mulund West
3/4 BHK apartments
View Details

Vardhan Bliss

₹ 93.15 Lacs. onwards
Mulund West
1/2/2½/3 BHK apartments
View Details

Runwal The Sanctuary

₹ 1.69 Crs. onwards
Mulund West
2/3 BHK apartments
View Details
Project Details
Project details were last updated in Dec 2025
  • Project:
    Runwal Pinnacle
  • Location:
  • Mulund West, Mulund Goregaon Link Road
  • Const. Stage:
    Under Construction
  • Possession:
    Jun 2026
  • Parking:
    Open Reserved;
  • Floors:
    67
Developer Details

Runwal Group

  • Developer:
    Runwal Group
  • Phone:
    02261133000
  • Website:
    www.runwal.com
  • Address:
  • Runwal & Omkar Esquare,4th Floor, Eastern Express HighwayOpp. Sion – Chunabhatti Signal, Sion (East)Mumbai – 400 022.
Project Ratings
Project Brochures
Brochures of Runwal Pinnacleby Runwal Group
Project Brochures
  • MPE/Brochures/28304/PinnacleBroucher.pdf
Project Amenities
Amenities offred in Runwal Pinnacle
LIFESTYLE AMENITIES
Power BackupOutdoor GamesIndoor GamesAir Conditioned LobbyBusiness CentreRecreationKid's play areaBalconyHigh speed elevatorsGrand entrance lobbyGymnasiumClub HouseSwimming PoolIntercom/CCTVVideo Door PhonesAir ConditionersPOP finished wallsImported Sanitary FittingsVitrified flooringKitchen CabinetsKitchen ChimneyModular KitchenGranite PlatformSecurity Help DeskReception Desk
Project RERA Details
RERA Project Status New
Proposed Possession 30 Jun 2026
Revised Possession 01 Jan 1900
Extended Possession 30 Jun 2027
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800021322
RERA Project Name Runwal Pinnacle
RERA Location Cts No. 681A/8B Pt.
RERA Developer Runwal Enterprises Private Limited
Project RERA Details
Project Type Residential / Group Housing
Funding Bank
Last Modified 02 Jul 2025
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Mulund West

Facilities & Amenities
Facilities, Amenities & Common areas details of Runwal Pinnaclelast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
2 Level Gymnasium
For All Towers In The Project
5 level Common Basement
Common Basement For All Towers In The Project
9 level Common Podium
Common Podium For All Towers In The Project
Aerobics Room
For All Towers In The Project
Aggregate area of recreational Open Space
Na
BADMINTON COURT Open
For All Towers In The Project
Billiards/Pool Room
For All Towers In The Project
Business Centre
For All Towers In The Project
CCTV surveillance
For All Towers In The Project
Common Parking
Common Parking For All Towers In The Project
Community Buildings
2 Level Common Clubhouse Above Podium (All Towers)
Convenience Retail
For All Towers In The Project
Creche
For All Towers In The Project
DG Backup in Essential & Common Areas
For All Towers In The Project
Double height entrance lobbies
For All Towers In The Project
Electrical Meter Room, Sub-Station, Receiving Station
Electric Meter Room &Amp; Sub-Station Only
Energy management
For All Towers In The Project
Exclusive kids pool
For All Towers In The Project
Fire Protection And Fire Safety Requirements
For All Towers In The Project
Gaming Arena
For All Towers In The Project
Half-Basketball Court
For All Towers In The Project
High Speed lifts
For All Towers In The Project
Intercom facility from Lobby to apartment
For All Towers In The Project
Jacuzzi
For All Towers In The Project
Kids Play Area
For All Towers In The Project
Landscaped driveway
For All Towers In The Project
Landscaping & Tree Planting
For All Towers In The Project
Library
For All Towers In The Project
Mini Theatre
For All Towers In The Project
Open Parking
Na
Party Hall
For All Towers In The Project
Rainwater harvesting
For All Towers In The Project
RFID Tagged Entry Systems
For All Towers In The Project
Rooftop jogging track
For All Towers In The Project
Rooftop Sky Lounge
For All Towers In The Project
Sewage Treatment Plant
For All Towers In The Project
Sewerage (Chamber, Lines, Septic Tank , STP)
No Septic Tank
Sky Bbq Pavilion
For All Towers In The Project
Sky Deck Open Gym
For All Towers In The Project
Solid Waste Management And Disposal
For All Towers In The Project
Spa
For All Towers In The Project
Squash Court
For All Towers In The Project
Stargazing Deck with telescope
For All Towers In The Project
Storm Water Drains
For All Towers In The Project
Street Lighting
Na
Swimming pool with poolside decks
For All Towers In The Project
Table Tennis
For All Towers In The Project
Treatment And Disposal Of Sewage And Sullage Water
For All Towers In The Project
Water Conservation, Rain water Harvesting
For All Towers In The Project
Water Supply
For All Towers In The Project
Wifi Enabled Lobbies
For All Towers In The Project
Yoga Room
For All Towers In The Project
Buildings / Wings in Runwal Pinnacle
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Runwal Pinnacleby Runwal Grouplast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

53019 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 5

Wings / Towers in Project

Apartments Statistics

1107 apartments in total
Total
1107
Booked
629
Available
478

Saleable Area Statistics (Sq. ft.)

713921 Total
Total
713921
Booked
410233
Available
303687
Total 1107 apartments in project. 629 apartments booked. 56% apartments booked.
Total 66324.85 saleable area. 38111.6 apartments booked.
57% area booked.

Tower 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 1Jun 20255710000114
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK61.17 Sq.mts. ( 658 Sq.ft. )40
39 Booked97% Booked
97% Booked
2 BHK plus Deck61.65 Sq.mts. ( 664 Sq.ft. )14
None Booked0% Booked
0% Booked
3 BHK77.92 Sq.mts. ( 839 Sq.ft. )54
32 Booked59% Booked
59% Booked
3 BHK79.97 Sq.mts. ( 861 Sq.ft. )54
18 Booked33% Booked
33% Booked
3 BHK83.99 Sq.mts. ( 904 Sq.ft. )46
31 Booked67% Booked
67% Booked
Studio34.89 Sq.mts. ( 376 Sq.ft. )1
None Booked0% Booked
0% Booked
209 total apartments / 120 apartments booked. 57% apartments booked.
Work Description in Building Tower 1Completion
Basement (if any)
work-in-progress80% done
80% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress85% done
85% Booked
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress23% done
23% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
work-in-progress80% done
80% Booked

Tower 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 2Jun 20255710000139
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK42.48 Sq.mts. ( 457 Sq.ft. )54
22 Booked40% Booked
40% Booked
1 BHK42.85 Sq.mts. ( 461 Sq.ft. )54
32 Booked59% Booked
59% Booked
2 BHK54.63 Sq.mts. ( 588 Sq.ft. )33
25 Booked75% Booked
75% Booked
2 BHK54.94 Sq.mts. ( 591 Sq.ft. )28
28 Booked100% Booked
100% Booked
2 BHK59.02 Sq.mts. ( 635 Sq.ft. )21
None Booked0% Booked
0% Booked
2 BHK59.46 Sq.mts. ( 640 Sq.ft. )33
29 Booked87% Booked
87% Booked
2 BHK61.54 Sq.mts. ( 662 Sq.ft. )36
2 BHK64.05 Sq.mts. ( 689 Sq.ft. )21
13 Booked61% Booked
61% Booked
2 BHK plus Deck55.53 Sq.mts. ( 598 Sq.ft. )12
5 Booked41% Booked
41% Booked
292 total apartments / 161 apartments booked. 55% apartments booked.
Work Description in Building Tower 2Completion
Basement (if any)
work-in-progress80% done
80% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress85% done
85% Booked
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
work-in-progress80% done
80% Booked

Tower 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 3Jun 2025571000095
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK42.48 Sq.mts. ( 457 Sq.ft. )40
24 Booked60% Booked
60% Booked
1 BHK42.92 Sq.mts. ( 462 Sq.ft. )40
23 Booked57% Booked
57% Booked
1 BHK plus Deck42.96 Sq.mts. ( 462 Sq.ft. )14
1.5 BHK plus Deck43.4 Sq.mts. ( 467 Sq.ft. )14
2 BHK55.39 Sq.mts. ( 596 Sq.ft. )28
28 Booked100% Booked
100% Booked
2 BHK plus Deck56.14 Sq.mts. ( 604 Sq.ft. )12
6 Booked50% Booked
50% Booked
2.5 BHK63.5 Sq.mts. ( 684 Sq.ft. )36
34 Booked94% Booked
94% Booked
184 total apartments / 119 apartments booked. 64% apartments booked.
Work Description in Building Tower 3Completion
Basement (if any)
work-in-progress80% done
80% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress85% done
85% Booked
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress75% done
75% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
work-in-progress80% done
80% Booked

Tower 4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 4Jun 20255710000111
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK46.63 Sq.mts. ( 502 Sq.ft. )54
32 Booked59% Booked
59% Booked
2 BHK63.64 Sq.mts. ( 685 Sq.ft. )36
30 Booked83% Booked
83% Booked
3 BHK79.52 Sq.mts. ( 856 Sq.ft. )28
26 Booked92% Booked
92% Booked
3 BHK87.57 Sq.mts. ( 943 Sq.ft. )54
36 Booked66% Booked
66% Booked
3 BHK plus Deck80.47 Sq.mts. ( 866 Sq.ft. )12
3 Booked25% Booked
25% Booked
184 total apartments / 127 apartments booked. 69% apartments booked.
Work Description in Building Tower 4Completion
Basement (if any)
work-in-progress80% done
80% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress85% done
85% Booked
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress77% done
77% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
work-in-progress80% done
80% Booked

Tower 5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 5Jun 2025571000082
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK42.48 Sq.mts. ( 457 Sq.ft. )54
25 Booked46% Booked
46% Booked
1 BHK42.85 Sq.mts. ( 461 Sq.ft. )54
25 Booked46% Booked
46% Booked
2 BHK60.52 Sq.mts. ( 651 Sq.ft. )28
27 Booked96% Booked
96% Booked
2 BHK61.14 Sq.mts. ( 658 Sq.ft. )36
2 BHK plus Deck61.17 Sq.mts. ( 658 Sq.ft. )12
3 BHK76.11 Sq.mts. ( 819 Sq.ft. )54
22 Booked40% Booked
40% Booked
238 total apartments / 102 apartments booked. 42% apartments booked.
Work Description in Building Tower 5Completion
Basement (if any)
work-in-progress80% done
80% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress85% done
85% Booked
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
work-in-progress80% done
80% Booked
Project Consultants
Channel Partners Registered by Developer
Runwal Group
for Project
Runwal Pinnacle
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Runwal Group

Runwal Group Runwal Group was established in 1978, It is one of Mumbai’s premier real estate developers, operating in the residential, commercial and organized retails verticals. With a robust track record of 65 delivered projects with over 20 thousand families happily living, the group has continuously striven to keep the ‘customer’ as a focal point in the designing, planning and construction of all its projects.Established in 1978, the Runwal Group is one of Mumbai’s premier real estate developers, operating in the residential, commercial and organized retails verticals. With a robust track record of 65 delivered projects with over 20 thousand families happily living, the group has continuously striven to keep the ‘customer’ as a focal point in the designing, planning and construction of all its projects.Operating in the Luxury, Premium and Large-Format Townships categories in residential development, the Runwal Group today also owns and manages the largest retail mall chain in Mumbai with over 2 million sq ft of GLA that includes Rcity, Ghatkopar (W) – which is Mumbai's Biggest Mall, R Mall, Mulund, R Mall, Thane and R Odeon, Ghatkopar (E). The Group currently manages a portfolio of 15 ongoing projects with almost 20mn sqft under development across Mumbai and the MMRDA region. One of the fastest growing entities in the sector the group claims to have operated with excellent customer care levels and the highest standards for the welfare of society and the environment since the last 3 decades.The Group has also been awarded as the “Star Realty – Lords of the Land award” for its excellence in the field of real estate along with other accolades such as the ‘CNBC AWAAZ Real Estate Award’ & the ‘Retail Property of the Year’, just to name a few. Today, the Group’s steadfast focus on 'quality' has led it to become an industry leader and a market-driven construction company renowned for trust and quality-on-time.