Rashmi Signature Project at Malad West by Modis Navnirman (P51800077248)
  • Rating:
  • ()

Rashmi Signature - Malad West

Project Details, Configuration & Prices
Project overview
Rashmi Signature Project at Malad West by Modis Navnirman (P51800077248) is a RERA approved Under Construction Project with RERA ID P51800077248 slated to be ready for possession by Aug 2027 with 1/2/3 BHK apartments / Flats starting from N/A onwards

Rashmi Signature is a thoughtfully planned residential development in Malad West, featuring three premium towers rising up to 18 residential floors, designed to offer a lifestyle that balances wellness, recreation, and modern comfort. The project is curated with a wide range of lifestyle and fitness amenities that cater to all age groups, creating a vibrant community living environment. With well-planned open spaces, leisure zones, and fitness-focused amenities, Rashmi Signature delivers a wholesome residential experience in one of Malad West’s well-connected neighbourhoods.
Rashmi Signature QR Code
Rashmi Signature
MahaRERA - P51800077248

9 Business Bay

₹ 1.41 Crs. onwards
Malad West
Office BHK apartments
View Details

Auris Clara

₹ 1.79 Crs. onwards
Malad West
2/3 BHK apartments
View Details

Raheja Exotica Siena

₹ 85 Lacs. onwards
Malad West
1 BHK apartments
View Details

Arkade Eden

₹ 2.24 Crs. onwards
Malad West
2/3 BHK apartments
View Details

Polo Matrix Jaydeep

₹ 1.25 Crs. onwards
Malad West
2/3 BHK apartments
View Details

Auris Ilaria

₹ 1.08 Crs. onwards
Malad West
1/2/3 BHK apartments
View Details

Sheth Irene

₹ 1.1 Crs. onwards
Malad West
1/2 BHK apartments
View Details

Raheja Exotica Verona

₹ 3.4 Crs. onwards
Malad West
3/4 BHK apartments
View Details
Project Details
Project details were last updated in Dec 2025
  • Project:
    Rashmi Signature
  • Location:
  • Malad West, SV Road
  • Const. Stage:
    Under Construction
  • Possession:
    Aug 2027
  • Floors:
    18
Developer Details

  • Developer:
    Modis Navnirman
  • Phone:
    9819989100
  • Website:
  • Address:
  • Shop No. 1, Rashmi Heights, M.G.Road, Opp Kamala Nagar, Kandivali (West)
Project Ratings
Project Amenities
Amenities offred in Rashmi Signature
LIFESTYLE AMENITIES
Power BackupOutdoor GamesIndoor GamesKid's play areaLandscaped gardenJogging TrackGymnasiumIntercom/CCTVAluminium Sliding WindowsPOP finished wallsConcealed PlumbingConcealed WiringVitrified flooringGranite PlatformSecurity Help DeskYoga Room
Project RERA Details
RERA Project Status New
Proposed Possession 11 Aug 2027
Revised Possession
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800077248
RERA Project Name Rashmi Signature
RERA Location 33/18
RERA Developer Modi's Navnirman Limited
Architect Sanjay B Shah
Project RERA Details
Project Type Residential / Group Housing
Funding Bank KOTAK MAHINDRA BANK LIMITED
Last Modified 31 Jul 2024
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Malad West

Facilities & Amenities
Facilities, Amenities & Common areas details of Rashmi Signaturelast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Wip
Energy management
Wip
Fire Protection And Fire Safety Requirements
Wip
Landscaping & Tree Planting
Wip
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Wip
Solid Waste Management And Disposal
Wip
Storm Water Drains
Wip
Street Lighting
Wip
Treatment And Disposal Of Sewage And Sullage Water
Wip
Water Conservation, Rain water Harvesting
Wip
Water Supply
Wip
Buildings / Wings in Rashmi Signature
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Rashmi Signatureby Modis Navnirmanlast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

57848 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

210 apartments in total
Total
210
Booked
6
Available
204

Saleable Area Statistics (Sq. ft.)

137440 Total
Total
137440
Booked
5044
Available
132396
Total 210 apartments in project. 6 apartments booked. 2% apartments booked.
Total 12768.52 saleable area. 468.61 apartments booked.
4% area booked.

Wing - Gh1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing - Gh1Nov 2027111013069
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK57.04 Sq.mts. ( 614 Sq.ft. )6
None Booked0% Booked
0% Booked
3 BHK71.63 Sq.mts. ( 771 Sq.ft. )8
3 BHK81.48 Sq.mts. ( 877 Sq.ft. )5
3 Booked60% Booked
60% Booked
3 BHK76.27 Sq.mts. ( 821 Sq.ft. )11
TENANT76.27 Sq.mts. ( 821 Sq.ft. )7
None Booked0% Booked
0% Booked
TENANT81.48 Sq.mts. ( 877 Sq.ft. )11
None Booked0% Booked
0% Booked
TENANT71.63 Sq.mts. ( 771 Sq.ft. )10
None Booked0% Booked
0% Booked
TENANT57.04 Sq.mts. ( 614 Sq.ft. )12
None Booked0% Booked
0% Booked
70 total apartments / 6 apartments booked. 8% apartments booked.
Work Description in Building Wing - Gh1Completion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress40% done
40% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress36% done
36% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Wing -Gh2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing -Gh2Nov 2027111013069
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK45.43 Sq.mts. ( 489 Sq.ft. )5
None Booked0% Booked
0% Booked
2 BHK55.46 Sq.mts. ( 597 Sq.ft. )8
None Booked0% Booked
0% Booked
TENANT55.46 Sq.mts. ( 597 Sq.ft. )28
None Booked0% Booked
0% Booked
TENANT45.43 Sq.mts. ( 489 Sq.ft. )29
None Booked0% Booked
0% Booked
70 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing -Gh2Completion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress50% done
50% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress41% done
41% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Wing -Gh3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing -Gh3Nov 2027101013069
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK55.93 Sq.mts. ( 602 Sq.ft. )18
None Booked0% Booked
0% Booked
2 BHK56.58 Sq.mts. ( 609 Sq.ft. )16
None Booked0% Booked
0% Booked
2 BHK57.32 Sq.mts. ( 617 Sq.ft. )8
None Booked0% Booked
0% Booked
3 BHK71.72 Sq.mts. ( 772 Sq.ft. )7
None Booked0% Booked
0% Booked
TENANT71.72 Sq.mts. ( 772 Sq.ft. )11
None Booked0% Booked
0% Booked
TENANT57.32 Sq.mts. ( 617 Sq.ft. )10
None Booked0% Booked
0% Booked
70 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing -Gh3Completion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress40% done
40% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress27% done
27% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Project Consultants
Channel Partners Registered by Developer
Modis Navnirman
for Project
Rashmi Signature
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Modis Navnirman