Raj Kamal Park Project at Parel by Rishabh Developers (P51900010115)
  • Rating:
  • ()

Raj Kamal Park - Parel

Project Details, Configuration & Prices
1 BHK390 Sq.ft. Carpet ₹ 1.68 Cr All In
2 BHK582 Sq.ft. Carpet ₹ 2.50 Cr All In
Project overview
Raj Kamal Park Project at Parel by Rishabh Developers (P51900010115) is a Ready Possession Project with 1/2 BHK apartments / Flats starting from ₹ 1.63 Crs onwards

Raj Kamal Park presents affordable yet premium 1 BHK apartments in the heart of South Mumbai, offering a well-connected and comfortable lifestyle. Located in Parel East, near Gandhi Hospital and Raj Kamal Studio, this ready-to-move-in residential development with OC received is perfect for those seeking a modern and well-designed home. The project is equipped with earthquake-resistant RCC design, modern elevation, high-speed lifts, and a beautifully designed entrance, ensuring a secure and aesthetically pleasing living environment. With top educational institutions like JBCL School and M.D College, leading hospitals such as KEM, Tata, and Global Hospital, and entertainment spots like Ashok Garden in close proximity, Raj Kamal Park provides a seamless urban living experience. Excellent connectivity through the Monorail Station, Currey Road Railway Station, and Lower Parel Station ensures effortless commuting. Each apartment features vitrified flooring, powder-coated sliding windows, concealed copper wiring, modular switches, pre-wired internet, TV, and telephone connections, along with advanced security features like intercom systems and 24x7 security guards. Experience the perfect blend of comfort, convenience, and affordability at Raj Kamal Park, Parel East.
Raj Kamal Park QR Code
Raj Kamal Park
MahaRERA - P51900010115

Crescent Bay Tower 3

₹ 4.1 Crs. onwards
Parel
2 BHK apartments
View Details

Simana

₹ 3.85 Crs. onwards
Parel
2/3/4/5 BHK apartments
View Details

Crescent Bay Tower 6

₹ 10.5 Crs. onwards
Parel
4 BHK apartments
View Details

Tribeca The Edge

₹ 5.12 Crs. onwards
Parel
2/3/4 BHK apartments
View Details

Bhoomi Simana Tower C

₹ 4.32 Crs. onwards
Parel
3/4 BHK apartments
View Details

Sobha Inizio

₹ 4.49 Crs. onwards
Parel
2/3 BHK apartments
View Details

Neha Residency

₹ 2.21 Crs. onwards
Parel
2 BHK apartments
View Details

Ruparel Jewel

₹ 8.69 Crs. onwards
Parel
3/4 BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    Raj Kamal Park
  • Location:
  • Parel, Near Gandhi Hospital
  • Const. Stage:
    Ready Possession
  • Possession:
  • Parking:
    Open Reserved;
Developer Details

  • Developer:
    Rishabh Developers
  • Phone:
    022 6111 6666
  • Website:
  • Address:
Project Ratings
Project Brochures
Brochures of Raj Kamal Parkby Rishabh Developers
Project Brochures
  • MPE/Brochures/31552/Raj Kamal Park.PDF
Project Amenities
Amenities offred in Raj Kamal Park
LIFESTYLE AMENITIES
Air Conditioned LobbyHigh speed elevatorsGrand entrance lobbyAluminium Sliding WindowsPOP finished wallsImported Sanitary FittingsConcealed PlumbingConcealed WiringGranite PlatformSecurity Help DeskReception Desk
Project RERA Details
RERA Project Status Ongoing
Proposed Possession 30 Dec 2023
Revised Possession 30 Dec 2023
Extended Possession 29 Dec 2024
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51900010115
RERA Project Name Rajkamal Park
RERA Location 108
RERA Developer Prarthana Griha Nirman
Architect Chandrashekhar
Project RERA Details
Project Type Residential / Group Housing
Funding Bank AXIS BANK
Last Modified 17 Mar 2025
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Parel

Facilities & Amenities
Facilities, Amenities & Common areas details of Raj Kamal Parklast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
To Be Provided Before Completion Of Bldg
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting100% completed
95% Complete
To Be Provided Before Completion Of Bldg
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Sewerage Chamber &Amp; Lines Are To Be Completed On Si
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
To Be Provided Before Completion Of Bldg
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Ground Water Recharge Is To Be Provided.
Water Supply100% completed
95% Complete
Municipal Water Supply Is To Be Provided.
Buildings / Wings in Raj Kamal Park
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Raj Kamal Parkby Rishabh Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

33916 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

126 apartments in total
Total
126
Booked
96
Available
30

Saleable Area Statistics (Sq. ft.)

52264 Total
Total
52264
Booked
40130
Available
12134
Total 126 apartments in project. 96 apartments booked. 76% apartments booked.
Total 4855.48 saleable area. 3728.2 apartments booked.
77% area booked.

Composite Building No - 1 Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Composite Building No - 1 Wing BDec 20227101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK43.79 Sq.mts. ( 471 Sq.ft. )28
25 Booked89% Booked
89% Booked
28 total apartments / 25 apartments booked. 89% apartments booked.
Work Description in Building Composite Building No - 1 Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Rajkamal Park Wing - A , B, C, D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rajkamal Park Wing - A , B, C, DDec 20227101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.76 Sq.mts. ( 385 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK36.51 Sq.mts. ( 393 Sq.ft. )7
5 Booked71% Booked
71% Booked
1 BHK36.53 Sq.mts. ( 393 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK36.61 Sq.mts. ( 394 Sq.ft. )7
4 Booked57% Booked
57% Booked
1 BHK36.77 Sq.mts. ( 396 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK36.89 Sq.mts. ( 397 Sq.ft. )28
26 Booked92% Booked
92% Booked
1 BHK36.97 Sq.mts. ( 398 Sq.ft. )21
18 Booked85% Booked
85% Booked
1 BHK37.05 Sq.mts. ( 399 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK40.78 Sq.mts. ( 439 Sq.ft. )7
4 Booked57% Booked
57% Booked
98 total apartments / 71 apartments booked. 72% apartments booked.
Work Description in Building Rajkamal Park Wing - A , B, C, DCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress94% done
94% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress92% done
92% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress98% done
98% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress97% done
97% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress95% done
95% Booked
Sanitary Fittings within the flats / premises
work-in-progress96% done
96% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress96% done
96% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress97% done
97% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress93% done
93% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Project Consultants
Channel Partners Registered by Developer
Rishabh Developers
for Project
Rajkamal Park
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Rishabh Developers