Pride Panorama Project at Andheri East by Pride Group (P51800034548)
  • Rating: 3.9
  • (131)

Pride Panorama - Andheri East

Pride Group
Project Details, Configuration & Prices
1 BHK505 Sq.ft. Carpet ₹ 1.45 Cr All In
1 BHK621 Sq.ft. Carpet ₹ 1.80 Cr All In
2 BHK651 Sq.ft. Carpet ₹ 1.89 Cr All In
2 BHK703 Sq.ft. Carpet ₹ 2.43 Cr All In
3 BHK840 Sq.ft. Carpet ₹ 2.43 Cr All In
Project overview
Pride Panorama Project at Andheri East by Pride Group (P51800034548) is a RERA approved Under Construction Project with RERA ID P51800034548 slated to be ready for possession by Dec 2025 with 1/2/3 BHK apartments / Flats starting from ₹ 1.4 Crs onwards

Pride Panorama, Andheri East – A Premium Residential Offering by Pride Group Located in the bustling neighborhood of Sakinaka, Andheri East, Pride Panorama is a luxurious residential development that blends contemporary design with ultimate convenience. Strategically positioned on Andheri-Kurla Road, this project ensures seamless connectivity and access to key destinations in Mumbai. Amenities: Pride Panorama is designed to cater to every aspect of modern living, offering a range of world-class amenities: Infinity Swimming Pool with Deck Lounge Kids Pool and Outdoor Play Area Yoga and Meditation Zone Multi-level Basement Parking Cricket Pitch and Jogging Track Senior Citizen Area and Step Garden Indoor Games Room Spa & Massage Room and Steam Room Clubhouse with a Multi-Purpose Hall Stargazing Zone and Outdoor Chess Pet Play Area and Leisure Lawn Location Advantages: Pride Panorama offers unmatched convenience with its prime location in Sakinaka, Andheri East: Metro Station Proximity: Just 1 km from Sakinaka Metro Station, ensuring easy commutes across Mumbai. Airport Accessibility: Chhatrapati Shivaji Maharaj International Airport is only 2.5 km away. Healthcare: Close to Family Care Hospital (500 m) and Metro Hospital (550 m) for all medical needs. Education: Well-known schools like Eden Garden School (350 m) and Karthika High School & Junior College (2.2 km) are nearby. Entertainment: Shopping and leisure hubs such as Phoenix Marketcity (1.8 km) and D-Mart (3.1 km) are within easy reach. Description: Experience the epitome of urban living at Pride Panorama, a meticulously designed residential haven offering Studio, 1, 2, and 3 BHK apartments. With sizes ranging from 437 to 928 sq.ft, these homes are thoughtfully planned to maximize space, natural light, and ventilation. The development boasts a seamless blend of luxury and functionality, making it perfect for families, professionals, and investors. Residents can enjoy a host of premium amenities, including a serene infinity pool, landscaped gardens, wellness zones, and recreational areas. Its proximity to business hubs, top-notch educational institutions, healthcare centers, and entertainment zones ensures that every aspect of life is taken care of. Choose Pride Panorama, Andheri East, for a lifestyle of luxury, comfort, and connectivity. Live in a space that’s designed to elevate your living experience while keeping you close to everything Mumbai has to offer.
Pride Panorama QR Code
Pride Panorama
MahaRERA - P51800034548

Vasant Blossom

₹ 1.7 Crs. onwards
Andheri East
2/3 BHK apartments
View Details

Lodha Acenza

₹ 4.88 Crs. onwards
Andheri East
3/4 BHK apartments
View Details

Dynamix Luma

₹ 2.19 Crs. onwards
Andheri East
2/3 BHK apartments
View Details

Horizon Heights

₹ 1.33 Crs. onwards
Andheri East
1/2/3 BHK apartments
View Details

Horizon Tower 1

₹ 2.81 Crs. onwards
Andheri East
3 BHK apartments
View Details

Ganga CHS

₹ 1.08 Crs. onwards
Andheri East
1/2/3 BHK apartments
View Details

Kalpataru Vivant North Wing B

₹ 2.16 Crs. onwards
Andheri East
2 BHK apartments
View Details

Kalpataru Vivant North Wing D

₹ 2.15 Crs. onwards
Andheri East
2 BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    Pride Panorama
  • Location:
  • Andheri East, Andheri-Kurla Rd, Sakinaka
  • Const. Stage:
    Under Construction
  • Possession:
    Dec 2025
  • Floors:
    12
Developer Details

Pride Group

  • Developer:
    Pride Group
  • Phone:
    022 24218129
  • Website:
    www.pridegroup.net
  • Address:
  • 601, Orbit Plaza, New Prabhadevi Road, Prabhadevi, Mumbai - 400 025.
Project Ratings
Project Brochures
Brochures of Pride Panoramaby Pride Group
Project Brochures
  • MPE/Brochures/28667/Pride Panorama Brochure.pdf
Project Amenities
Amenities offred in Pride Panorama
LIFESTYLE AMENITIES
Outdoor GamesIndoor GamesKid's play areaLandscaped gardenJogging TrackHigh speed elevatorsGrand entrance lobbyGymnasiumHealth ClubClub HouseSwimming PoolIntercom/CCTVVideo Door PhonesPOP finished wallsImported Sanitary FittingsVitrified flooringPiped GasKitchen CabinetsModular KitchenGranite PlatformMulti Purpose HallMassage RoomPet Area
Project RERA Details
RERA Project Status New
Proposed Possession 31 Dec 2025
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800034548
RERA Project Name Pride Panorama
RERA Location 657, S. No 17 Hissa No 2
RERA Developer Landcare Realty Llp
Architect Mandviwala Qutub & Associates
Project RERA Details
Project Type Residential / Group Housing
Funding Bank HDFC BANK
Last Modified 11 Apr 2022
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Andheri East

Facilities & Amenities
Facilities, Amenities & Common areas details of Pride Panoramalast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Layout Amenities To Be Handed Over To Apex Body
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Layout Amenities To Be Handed Over To Apex Body
Energy management
Layout Amenities To Be Handed Over To Apex Body
Fire Protection And Fire Safety Requirements
Layout Amenities To Be Handed Over To Apex Body
Landscaping & Tree Planting
Layout Amenities To Be Handed Over To Apex Body
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Layout Amenities To Be Handed Over To Apex Body
Solid Waste Management And Disposal
Layout Amenities To Be Handed Over To Apex Body
Storm Water Drains
Layout Amenities To Be Handed Over To Apex Body
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Layout Amenities To Be Handed Over To Apex Body
Water Conservation, Rain water Harvesting
Layout Amenities To Be Handed Over To Apex Body
Water Supply
Layout Amenities To Be Handed Over To Apex Body
Buildings / Wings in Pride Panorama
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Pride Panoramaby Pride Grouplast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

25855 Sq. ft.

Project Area

16151 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

133 apartments in total
Total
133
Booked
24
Available
109

Saleable Area Statistics (Sq. ft.)

92080 Total
Total
92080
Booked
15972
Available
76108
Total 133 apartments in project. 24 apartments booked. 18% apartments booked.
Total 8554.47 saleable area. 1483.84 apartments booked.
17% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingDec 202513121101
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK61.13 Sq.mts. ( 658 Sq.ft. )11
4 Booked36% Booked
36% Booked
2 BHK61.17 Sq.mts. ( 658 Sq.ft. )12
3 BHK81.06 Sq.mts. ( 873 Sq.ft. )12
3 BHK85.92 Sq.mts. ( 925 Sq.ft. )12
4 Booked33% Booked
33% Booked
Shop39.72 Sq.mts. ( 428 Sq.ft. )1
None Booked0% Booked
0% Booked
48 total apartments / 11 apartments booked. 22% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress55% done
55% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress45% done
45% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress54% done
54% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress60% done
60% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingDec 202513121101
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK47.41 Sq.mts. ( 510 Sq.ft. )11
4 Booked36% Booked
36% Booked
1 BHK49.95 Sq.mts. ( 538 Sq.ft. )12
2 BHK62.43 Sq.mts. ( 672 Sq.ft. )7
3 BHK78.07 Sq.mts. ( 840 Sq.ft. )8
Shop101.08 Sq.mts. ( 1088 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop23.68 Sq.mts. ( 255 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop39.43 Sq.mts. ( 424 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop46.62 Sq.mts. ( 502 Sq.ft. )1
1 Booked100% Booked
100% Booked
42 total apartments / 9 apartments booked. 21% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress55% done
55% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress45% done
45% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress54% done
54% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress60% done
60% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C WingDec 202513121101
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK60.54 Sq.mts. ( 652 Sq.ft. )11
2 BHK60.56 Sq.mts. ( 652 Sq.ft. )12
None Booked0% Booked
0% Booked
2 BHK60.59 Sq.mts. ( 652 Sq.ft. )8
3 BHK86.25 Sq.mts. ( 928 Sq.ft. )8
None Booked0% Booked
0% Booked
Shop28.61 Sq.mts. ( 308 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop33.91 Sq.mts. ( 365 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop40.34 Sq.mts. ( 434 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop40.99 Sq.mts. ( 441 Sq.ft. )1
None Booked0% Booked
0% Booked
43 total apartments / 4 apartments booked. 9% apartments booked.
Work Description in Building C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress55% done
55% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress45% done
45% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress54% done
54% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress60% done
60% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Club House

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Club HouseDec 20252001001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Club House65.15 Sq.mts. ( 701 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building Club HouseCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress90% done
90% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress90% done
90% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
work-in-progress90% done
90% Booked
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress90% done
90% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Project Consultants
Channel Partners Registered by Developer
Pride Group
for Project
Pride Panorama
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Pride Group

Pride Group The Pride Group is a leading property development conglomerate that is changing the cityscapes of Pune, Mumbai and Bangalore with its bold new designs, high engineering and ethical standards and professional outlook. A leading development firm in the residential & commercial space, Pride Group has various Information Technology parks and built-to-suit office space complexes to its credit. Pride Group is also a pioneer in the luxury hospitality segment and is the driving force behind the extensive chain of Pride Hotels across the country. Since the inception of the first Pride Hotel in Pune in 1988, under the able chairmanship of Mr. S.P. Jain and the skilled leadership of his brothers, Mr. D.P Jain and Mr. Arvind Jain, the Group has seen phenomenal growth.