Pinnacle Residency Project at Kamothe by Pinnacle Construction Company (P51700016288)
  • Rating: 4.3
  • (2)

Pinnacle Residency - Kamothe

Project Details, Configuration & Prices (Exclusive of Stamp Duty Charges, GST Charges, Registration Charges & Maintenance Charges)
Project overview
Pinnacle Residency Project at Kamothe by Pinnacle Construction Company (P51700016288) a Sold Out Project with 2 BHK apartments / Flats starting from N/A onwards

Pinnacle Infrastructure & Projects, brings to you a home constructed to give you the perfect synergy of comfort, peace & space, in Kamothe where there is an Excellent connectivity to Sion-Panvel Expressway, CST Mumbai & Thane through buses & trains.
Pinnacle Residency QR Code
Pinnacle Residency
MahaRERA - P51700016288
Project Details
Project details were last updated in Nov 2025
  • Project:
    Pinnacle Residency
  • Location:
  • Kamothe, Plot No. 28, Sector-35,
  • Const. Stage:
    Sold Out
  • Possession:
  • Parking:
    Open;
  • Floors:
    7
Developer Details

  • Developer:
    Pinnacle Construction Company
  • Phone:
  • Website:
  • Address:
  • Taloja, Plot No.3, Sector 16,Navi Mumbai.
Project Ratings
Project Amenities
Amenities offred in Pinnacle Residency
LIFESTYLE AMENITIES
POP finished wallsVitrified flooring
Project RERA Details
RERA Project Status New
Proposed Possession 30 Sep 2020
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51700016288
RERA Project Name Pinnacle Residency
RERA Location Plot No. 114, Sector-21, Ghansoli
RERA Developer Lalji Hirji Arethiya
Architect Edge Architect
Project RERA Details
Project Type Residential / Group Housing
Funding Bank G P PARSIK BANK
Last Modified 15 May 2018
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Kamothe

Facilities & Amenities
Facilities, Amenities & Common areas details of Pinnacle Residencylast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Electric Meter Room Will Be Provided
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Chamber
Solid Waste Management And Disposal
Na
Storm Water Drains
Line Is Provided
Street Lighting
As Per Nmmc Norms
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
Provide Uoto Site By Cidco
Buildings / Wings in Pinnacle Residency
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Pinnacle Residencyby Pinnacle Construction Companylast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

2145 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

9 apartments in total
Total
9
Booked
0
Available
9

Saleable Area Statistics (Sq. ft.)

2885 Total
Total
2885
Booked
0
Available
2885
Total 9 apartments in project. 0 apartments booked. 0% apartments booked.
Total 268.03 saleable area. 0 apartments booked.
0% area booked.

Kripa Park

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Kripa ParkMar 20205101015
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK22.01 Sq.mts. ( 237 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK22.92 Sq.mts. ( 247 Sq.ft. )4
None Booked0% Booked
0% Booked
2 BHK44.11 Sq.mts. ( 475 Sq.ft. )3
None Booked0% Booked
0% Booked
9 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Kripa ParkCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Project Consultants
Channel Partners Registered by Developer
Pinnacle Construction Company
for Project
Pinnacle Residency
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Pinnacle Construction Company