Phancode Bliss Project at Mulund West by Shreeji Buildcon Group (P51800014738)
  • Rating:
  • ()

Phancode Bliss - Mulund West

Shreeji Buildcon Group
Project Details, Configuration & Prices
2 BHK793 Sq.ft. Carpet ₹ 2.41 Cr All in
2 BHK820 Sq.ft. Carpet ₹ 2.49 Cr All in
3 BHK1020 Sq.ft. Carpet ₹ 3.10 Cr All in
Project overview
Phancode Bliss Project at Mulund West by Shreeji Buildcon Group (P51800014738) is a Ready Possession Project with 2/3 BHK apartments / Flats starting from ₹ 1.91 Crs onwards

Phancode Bliss is a Residential Project Developed by the Shreeji Buildcon Group. It is located at Mulund West. The locality is well-connected to other parts of Mumbai and the surrounding areas. The Mulund Railway Station which is just 5 minutes away is a part of the Central Line of Mumbai's suburban railway network, connects Mulund West to the city's central business districts and other suburbs. Additionally, the Eastern Express Highway provides road connectivity to different parts of Mumbai and Thane. Just 3 minutes from LBS Marg and 10 minutes from Eastern Expressway. Close proximity to the business hubs of Powai, Thane, Navi Mumbai and BKC. It is a G+16 storey tower offering 2 and 3 BHK Residences. Amenities include kid's playzone, hang out zone, fitness studio, gazebo, landscape garden and many more.
Phancode Bliss QR Code
Phancode Bliss
MahaRERA - P51800014738

Oberoi Eternia

₹ 2.68 Crs. onwards
Mulund West
3 BHK apartments
View Details

Oberoi Enigma

₹ 3.55 Crs. onwards
Mulund West
3/4 BHK apartments
View Details

The Gateway

₹ 69.32 Lacs. onwards
Mulund West
Office BHK apartments
View Details

Ashford Regal

₹ 96 Lacs. onwards
Mulund West
1/2/3½ BHK apartments
View Details

Piramal Revanta Vana

₹ 2.59 Crs. onwards
Mulund West
2/2½/3 BHK apartments
View Details

Prestige Forest Hills

₹ 2.67 Crs. onwards
Mulund West
3/4 BHK apartments
View Details

Vardhan Bliss

₹ 93.15 Lacs. onwards
Mulund West
1/2/2½/3 BHK apartments
View Details

Runwal The Sanctuary

₹ 1.69 Crs. onwards
Mulund West
2/3 BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    Phancode Bliss
  • Location:
  • Mulund West, Near Ambaji Dham, M.G Road
  • Const. Stage:
    Ready Possession
  • Possession:
  • Floors:
    16
Developer Details

Shreeji Buildcon Group

  • Developer:
    Shreeji Buildcon Group
  • Phone:
  • Website:
  • Address:
Project Ratings
Project Brochures
Brochures of Phancode Blissby Shreeji Buildcon Group
Project Brochures
  • MPE/Brochures/30463/Bliss Brochure.pdf
Project Amenities
Amenities offred in Phancode Bliss
LIFESTYLE AMENITIES
Power BackupOutdoor GamesKid's play areaLandscaped gardenJogging TrackHigh speed elevatorsGrand entrance lobbyGymnasiumIntercom/CCTVVideo Door PhonesAluminium Sliding WindowsPOP finished wallsImported Sanitary FittingsConcealed PlumbingConcealed WiringMarble flooringVitrified flooringGranite PlatformReception DeskMulti Purpose Hall
Project RERA Details
RERA Project Status New
Proposed Possession 28 Aug 2022
Revised Possession 01 Jan 1900
Extended Possession 28 Aug 2025
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800014738
RERA Project Name Kailash Residency
RERA Location 927-1 To 5, Cts No 926, 927
RERA Developer Tridev Shreeji Associates
Architect Vijay Turbadkar
Project RERA Details
Project Type Others
Funding Bank KARUR VYSYA BANK
Last Modified 20 Aug 2024
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Mulund West

Facilities & Amenities
Facilities, Amenities & Common areas details of Phancode Blisslast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station50% completed
50% Complete
Before Occ
Energy management
Na
Fire Protection And Fire Safety Requirements50% completed
50% Complete
B Wing Completed
Landscaping & Tree Planting
Na
Open Parking
Yet To Start
Sewerage (Chamber, Lines, Septic Tank , STP)50% completed
50% Complete
B Wing Completed
Solid Waste Management And Disposal
Yet To Start
Storm Water Drains50% completed
50% Complete
Yet To Start
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Yet To Start
Water Supply50% completed
50% Complete
B Wing Completed
Buildings / Wings in Phancode Bliss
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Phancode Blissby Shreeji Buildcon Grouplast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

13060 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

64 apartments in total
Total
64
Booked
62
Available
2

Saleable Area Statistics (Sq. ft.)

38010 Total
Total
38010
Booked
36256
Available
1754
Total 64 apartments in project. 62 apartments booked. 96% apartments booked.
Total 3531.22 saleable area. 3368.28 apartments booked.
95% area booked.

Kailash Residency

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Kailash ResidencyAug 2021171010075
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK46.75 Sq.mts. ( 503 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK38.76 Sq.mts. ( 417 Sq.ft. )14
14 Booked100% Booked
100% Booked
1RK23.99 Sq.mts. ( 258 Sq.ft. )8
8 Booked100% Booked
100% Booked
2 BHK58.27 Sq.mts. ( 627 Sq.ft. )12
12 Booked100% Booked
100% Booked
2 BHK64.35 Sq.mts. ( 693 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK68.32 Sq.mts. ( 735 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK68.35 Sq.mts. ( 736 Sq.ft. )4
3 Booked75% Booked
75% Booked
2 BHK73.67 Sq.mts. ( 793 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK74.55 Sq.mts. ( 802 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK76.23 Sq.mts. ( 821 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK88.36 Sq.mts. ( 951 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK94.59 Sq.mts. ( 1018 Sq.ft. )4
3 Booked75% Booked
75% Booked
4 BHK144.74 Sq.mts. ( 1558 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office space145.18 Sq.mts. ( 1563 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office space123.27 Sq.mts. ( 1327 Sq.ft. )1
1 Booked100% Booked
100% Booked
Office space5.7 Sq.mts. ( 61 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop16.73 Sq.mts. ( 180 Sq.ft. )3
3 Booked100% Booked
100% Booked
Shop26.17 Sq.mts. ( 282 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop41.32 Sq.mts. ( 445 Sq.ft. )1
1 Booked100% Booked
100% Booked
64 total apartments / 62 apartments booked. 96% apartments booked.
Work Description in Building Kailash ResidencyCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress84% done
84% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress78% done
78% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress78% done
78% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress77% done
77% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress77% done
77% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress59% done
59% Booked
Sanitary Fittings within the flats / premises
work-in-progress59% done
59% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress90% done
90% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress90% done
90% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress84% done
84% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Project Consultants
Channel Partners Registered by Developer
Shreeji Buildcon Group
for Project
Kailash Residency
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Shreeji Buildcon Group

Shreeji Buildcon Group