Pali Carters Project at Khar West by M.R Infrastructure & Developers (P51800024803)
  • Rating:
  • ()

Pali Carters - Khar West

Project Details, Configuration & Prices
2 BHK675 Sq.ft. Carpet ₹ 4.18 Cr All In
3 BHK1350 Sq.ft. Carpet ₹ 8.37 Cr All In
Project overview
Pali Carters Project at Khar West by M.R Infrastructure & Developers (P51800024803) is a RERA approved Under Construction Project with RERA ID P51800024803 slated to be ready for possession by Oct 2025 with 2/3 BHK apartments / Flats starting from ₹ 4.18 Crs onwards

Pali Carters offers a blend of luxury and tranquillity in one of Bandra West’s most sought-after neighbourhoods. With thoughtfully designed homes ranging from 2BHKs with 675 sqft carpet area to spacious 3BHK and 4BHK homes at 1,350 sqft, these residences cater to a variety of lifestyle preferences. Flexible layout options like Jodi and Duplex homes ensure every family finds its perfect fit. Starting from the 6th floor, panoramic sea views create a serene backdrop to your everyday life, while a host of rooftop amenities—such as a yoga deck, gym, walking track, and observatory deck—take your living experience to new heights. Strategically located, Pali Carters keeps you close to everything you need. With Carter Road just 3 minutes away and essential hubs like Linking Road, multi-speciality hospitals, and renowned schools within a 5-minute drive, this project seamlessly integrates luxury living with urban convenience. Possession is expected in March 2025, with the structure already completed and fully compliant.
Pali Carters QR Code
Pali Carters
MahaRERA - P51800024803

New Light

₹ 30 Crs. onwards
Khar West
Pent House BHK apartments
View Details

Nivan Residency

₹ 3.85 Crs. onwards
Khar West
2 BHK apartments
View Details

K52

₹ 12.15 Crs. onwards
Khar West
4 BHK apartments
View Details

Platinum Avenue

₹ 4.94 Crs. onwards
Khar West
2/3/6 BHK apartments
View Details

Samyakth Bliss Tower B

₹ 2.58 Crs. onwards
Khar West
1/2 BHK apartments
View Details

Sosar Solaris

₹ 3.66 Crs. onwards
Khar West
2/3 BHK apartments
View Details

Crest Link

₹ 4.38 Crs. onwards
Khar West
2/3 BHK apartments
View Details

Platinum Oceanic

₹ 4.2 Crs. onwards
Khar West
2/3 BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    Pali Carters
  • Location:
  • Khar West, 20th B Road
  • Const. Stage:
    Under Construction
  • Possession:
    Oct 2025
  • Parking:
    Open Reserved;
Developer Details

  • Developer:
    M.R Infrastructure & Developers
  • Phone:
    02226608585
  • Website:
  • Address:
  • G-6, A-Wing, Rizvi Nagar, S.V Road, Santacruz (West), Mumbai - 400054
Project Ratings
Project Amenities
Amenities offred in Pali Carters
LIFESTYLE AMENITIES
Air Conditioned LobbyHigh speed elevatorsGrand entrance lobbyAluminium Sliding WindowsPOP finished wallsImported Sanitary FittingsConcealed PlumbingConcealed WiringGranite PlatformSecurity Help DeskReception Desk
Project RERA Details
RERA Project Status New
Proposed Possession 30 Mar 2023
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800024803
RERA Project Name M R Infrastructure And Developers
RERA Location E86-16
RERA Developer M. R. Infrastructure & Developers
Project RERA Details
Project Type Residential / Group Housing
Funding Bank ICICI BANK LIMITED
Last Modified 22 Jan 2025
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Khar West

Facilities & Amenities
Facilities, Amenities & Common areas details of Pali Carterslast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Not Yet Started
Energy management
Na
Fire Protection And Fire Safety Requirements
Not Yet Started
Landscaping & Tree Planting
Not Yet Started
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Not Yet Started
Solid Waste Management And Disposal
Na
Storm Water Drains
Not Yet Started
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Not Yet Started
Water Conservation, Rain water Harvesting
Na
Water Supply
Not Yet Started
Buildings / Wings in Pali Carters
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Pali Cartersby M.R Infrastructure & Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

8898 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

18 apartments in total
Total
18
Booked
0
Available
18

Saleable Area Statistics (Sq. ft.)

13049 Total
Total
13049
Booked
0
Available
13049
Total 18 apartments in project. 0 apartments booked. 0% apartments booked.
Total 1212.3 saleable area. 0 apartments booked.
0% area booked.

Khar Shakti - Tenants Wing - A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Khar Shakti - Tenants Wing - A WingMar 202216100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
00 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building Khar Shakti - Tenants Wing - A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress20% done
20% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress20% done
20% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress42% done
42% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Pali Carters - Sale Wing- B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Pali Carters - Sale Wing- B WingMar 202210100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK67.35 Sq.mts. ( 725 Sq.ft. )18
None Booked0% Booked
0% Booked
18 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Pali Carters - Sale Wing- B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress20% done
20% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress20% done
20% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress42% done
42% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Project Consultants
Channel Partners Registered by Developer
M.R Infrastructure & Developers
for Project
M R Infrastructure And Developers
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About M.R Infrastructure & Developers