Project overview
Oregon Hills Project at Goregaon West by Supreme Infrastructure Ltd. (P51800006729) a Sold Out Project with 2/3 BHK apartments / Flats starting from ₹ 1.42 Crs onwards

Oregon Hills is a 42 storied Under Construction Project and the location is Yashwant Nagar, S.V. Road, Near Patkar College, Goregaon West and is developed by Supreme Infrastructure Ltd.. Oregon Hills was launched in Nov 2016 and the possession of the same is likely to be in Dec 2020. Oregon Hills is RERA approved has the Registration Number bearing P51800006729. Oregon Hills is tagged as Investors Delight / Self Use / RERA Approved. Supreme Infrastructure Ltd. also has other under construction and ready possession and sold out projects like Supreme Aishwarya, Anamika, Oregon Hills. The property prices in Goregaon West are in the range of 14000 to 19500 for Outright for ready and under construction projects. Supreme Infrastructure Ltd. currently has 1 Ready Possession, 1 Under Construction projects. Oregon Hills has good reviews and the ratings of this project are approximately 4 out of 5. You can download the brochure of Oregon Hills and you can see the latest digital pictures, Floor Plans, Location Plans & Rate History on our website. The Bookings for the Under Construction project Oregon Hills are open and we can set up a Site Visit any time at your Convenience. Oregon Hills is approved by most of the Banks and for more details on the approved bank list, please connect with us.
Oregon Hills QR Code
Oregon Hills
MahaRERA - P51800006729

Kalpataru Radiance

₹ 3.79 Crs. onwards
Goregaon West
2/3 BHK apartments
View Details

Ekta Tripolis

₹ 3.86 Crs. onwards
Goregaon West
2½/3 BHK apartments
View Details

DGS Sheetal Kiara

₹ 99 Lacs. onwards
Goregaon West
1/2 BHK apartments
View Details

H. Rishabraj Jakalyan Society

₹ 2.27 Crs. onwards
Goregaon West
2/3 BHK apartments
View Details

Sanghvi Crystal

₹ 1.25 Crs. onwards
Goregaon West
1/2/3 BHK apartments
View Details

Riviera

₹ 1.08 Crs. onwards
Goregaon West
1/2 BHK apartments
View Details

H Rishabhraj Opulence

₹ 1.03 Crs. onwards
Goregaon West
1/2 BHK apartments
View Details

37 Avenue

₹ 1.6 Crs. onwards
Goregaon West
2/4 BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    Oregon Hills
  • Location:
  • Goregaon West, Yashwant Nagar, S.V. Road, Near Patkar College
  • Const. Stage:
    Sold Out
  • Possession:
    Dec 2020
  • Floors:
    42
Developer Details

Supreme Infrastructure Ltd.

  • Developer:
    Supreme Infrastructure Ltd.
  • Phone:
    022 25794216
  • Website:
    www.supremeinfra.com
  • Address:
  • Supreme House,Plot No 94/C, Pratap Gad, Opp.IIT Main Gate, Powai, Mumbai - 400 076.
Project Ratings
Project Amenities
Amenities offred in Oregon Hills
LIFESTYLE AMENITIES
Swimming PoolClub HouseGymnasiumHigh speed elevatorsJogging TrackLandscaped gardenKid's play areaIndoor GamesPower BackupVitrified flooringPOP finished wallsIntercom/CCTVGranite PlatformModular Kitchen
Project RERA Details
RERA Project Status Ongoing
Proposed Possession 31 Jul 2028
Revised Possession 31 Jul 2028
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800006729
RERA Project Name 34 Park Estate
RERA Location 50 A Part, 55 Part, 49 Part
RERA Developer M/S Reddy Builders & Developers
Project RERA Details
Project Type Residential / Group Housing
Funding Bank ICICI BANK LIMITED
Last Modified 02 Mar 2020
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Goregaon West

Facilities & Amenities
Facilities, Amenities & Common areas details of Oregon Hillslast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings35% completed
35% Complete
-
Electrical Meter Room, Sub-Station, Receiving Station35% completed
35% Complete
-
Energy management
Na
Fire Protection And Fire Safety Requirements35% completed
35% Complete
-
Landscaping & Tree Planting35% completed
35% Complete
-
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)35% completed
35% Complete
-
society office
-
Solid Waste Management And Disposal35% completed
35% Complete
-
Storm Water Drains35% completed
35% Complete
-
Street Lighting35% completed
35% Complete
-
Treatment And Disposal Of Sewage And Sullage Water35% completed
35% Complete
-
Water Conservation, Rain water Harvesting35% completed
35% Complete
-
Water Supply35% completed
35% Complete
-
Buildings / Wings in Oregon Hills
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Oregon Hillsby Supreme Infrastructure Ltd.last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

207311 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 7

Wings / Towers in Project

Apartments Statistics

1285 apartments in total
Total
1285
Booked
959
Available
326

Saleable Area Statistics (Sq. ft.)

674120 Total
Total
674120
Booked
501931
Available
172189
Total 1285 apartments in project. 959 apartments booked. 74% apartments booked.
Total 62627.27 saleable area. 46630.53 apartments booked.
74% area booked.

Rehab - 4 Yet To Be Approved

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rehab - 4 Yet To Be ApprovedJan 19000000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
SRA UNIT25 Sq.mts. ( 269 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building Rehab - 4 Yet To Be ApprovedCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing AJun 20264010030130
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK57.32 Sq.mts. ( 617 Sq.ft. )72
62 Booked86% Booked
86% Booked
3 BHK76.18 Sq.mts. ( 820 Sq.ft. )66
48 Booked72% Booked
72% Booked
138 total apartments / 110 apartments booked. 79% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress65% done
65% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress65% done
65% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress65% done
65% Booked
Stilt Floor
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BJun 20264010030400
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK36.33 Sq.mts. ( 391 Sq.ft. )379
305 Booked80% Booked
80% Booked
2 BHK45.8 Sq.mts. ( 493 Sq.ft. )62
59 Booked95% Booked
95% Booked
2 BHK55.74 Sq.mts. ( 600 Sq.ft. )36
34 Booked94% Booked
94% Booked
477 total apartments / 398 apartments booked. 83% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress65% done
65% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress65% done
65% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress65% done
65% Booked
Stilt Floor
Completed 100% done
100% Booked

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CJun 20264010030204
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK36.33 Sq.mts. ( 391 Sq.ft. )108
68 Booked62% Booked
62% Booked
2 BHK55.74 Sq.mts. ( 600 Sq.ft. )144
135 Booked93% Booked
93% Booked
252 total apartments / 203 apartments booked. 80% apartments booked.
Work Description in Building Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress65% done
65% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress65% done
65% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress65% done
65% Booked
Stilt Floor
Completed 100% done
100% Booked

Wing D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing DJun 20274010030216
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK36.32 Sq.mts. ( 391 Sq.ft. )29
22 Booked75% Booked
75% Booked
2 BHK45.9 Sq.mts. ( 494 Sq.ft. )26
24 Booked92% Booked
92% Booked
2 BHK46.26 Sq.mts. ( 498 Sq.ft. )31
29 Booked93% Booked
93% Booked
2 BHK56.11 Sq.mts. ( 604 Sq.ft. )36
35 Booked97% Booked
97% Booked
2 BHK56.2 Sq.mts. ( 605 Sq.ft. )36
35 Booked97% Booked
97% Booked
2 BHK56.86 Sq.mts. ( 612 Sq.ft. )72
70 Booked97% Booked
97% Booked
3 BHK78.59 Sq.mts. ( 846 Sq.ft. )36
33 Booked91% Booked
91% Booked
266 total apartments / 248 apartments booked. 93% apartments booked.
Work Description in Building Wing DCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress65% done
65% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress65% done
65% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress65% done
65% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress65% done
65% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress65% done
65% Booked
Stilt Floor
Completed 100% done
100% Booked

Wing E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing EJul 20284010010104
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK57.32 Sq.mts. ( 617 Sq.ft. )54
None Booked0% Booked
0% Booked
3 BHK76.17 Sq.mts. ( 820 Sq.ft. )50
None Booked0% Booked
0% Booked
104 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing ECompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Wing F

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing FJul 2028301010015
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.25 Sq.mts. ( 304 Sq.ft. )48
None Booked0% Booked
0% Booked
48 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing FCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Project Consultants
Channel Partners Registered by Developer
Supreme Infrastructure Ltd.
for Project
34 Park Estate
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Supreme Infrastructure Ltd.

Supreme Infrastructure Ltd. SUPREME INFRASTRUCTURE INDIA LIMITED is one of the promising companies in India having turnover of Rs. 19910 millions as of 31-3-2013. The company has been formed to undertake engineering works of unrestricted value with most of the Government departments, public & private sector organisations. It is tribute to the company’s outstanding performance that national & international contractors have expressed their interests for partnership on equal footing for mega size projects.Apart from the latest methods and techniques, the company has introduced automation in its working styles. Use of QA / QC methods, Project Management & Control Tools, Safety Manuals, is the hallmark of company’s operations. As an organisation, it is always on the move to improve its productivity further by resorting to new management of tools as they become available.The company does not rest on the laurels and continues to endeavor towards the future progress & development to reach the peaks of the engineering professions viz, Excellence, Expediency and Economy. And, by doing this, it is proud to say that it can carry out the construction works in keeping with these three E's.