Om Nandanvan Project at Mulund West by Oscar Infrastructure PVT LTD (P51800056240)
  • Rating:
  • ()

Om Nandanvan - Mulund West

Project Details, Configuration & Prices
2 BHK740 Sq.ft. Carpet ₹ 2.20 Cr All in
3 BHK1123 Sq.ft. Carpet ₹ 3.33 Cr All in
5 BHK1888 Sq.ft. Carpet ₹ 5.50 Cr All in
Project overview
Om Nandanvan Project at Mulund West by Oscar Infrastructure PVT LTD (P51800056240) is a RERA approved Under Construction Project with RERA ID P51800056240 slated to be ready for possession by Dec 2027 with 2/3/5 BHK apartments / Flats starting from N/A onwards

Oscar Om Nandanvan is a premium residential development by Oscar Infrastructure, thoughtfully planned on a 0.54-acre land parcel in the well-established neighbourhood of Mulund West, Mumbai. The project features a single elegant tower rising G+21 floors, offering spacious 2 BHK, 3 BHK and Jodi premium residences designed for modern urban living. With well-planned layouts and efficient space utilisation, the carpet areas range from 740 sq.ft to 1,888 sq.ft, catering to families seeking comfort, space, and long-term value. Strategically located near MG Road at Gavane Pada, Mulund West, Oscar Om Nandanvan enjoys excellent connectivity and daily convenience. R Mall is just about 950 metres away, Mulund Railway Station is approximately 1.1 km, and Apex Hospital is around 1.6 km from the project, making it an ideal choice for end-users as well as investors looking for a prime residential address in central suburbs. The project offers a well-balanced mix of internal and external amenities. Internally, the flats are equipped with vitrified tile flooring, granite kitchen platforms, gypsum-finished walls, stainless steel sinks, branded fittings, exhaust fans, CCTV surveillance, and video door phone systems, ensuring a refined and secure living experience. Externally, residents can enjoy over 10 lifestyle amenities including a gymnasium, multipurpose hall, indoor games area, yoga and meditation zones, jogging track, kids’ play area, senior citizen zone, amphitheatre, gazebo, party lawn, rock climbing wall, and community spaces designed to encourage social interaction and wellness. Oscar Om Nandanvan follows an efficient floor planning concept with only five flats per floor, supported by three lifts and a dedicated staircase, ensuring privacy and smooth vertical circulation. Podium-level car parking is provided, adding to convenience and safety. Monthly maintenance charges are approximately ?7,400 for 2 BHK, ?11,200 for 3 BHK, and ?18,700 for Jodi units, varying as per configuration and carpet area. The project is currently at a mid-stage of construction, with a target possession set for December 2026 and RERA possession by December 2027 (RERA No. P51800056240). There is no litigation on the project. While the sample flat is not yet ready for site viewing, the project has received positive feedback from visitors, with an overall rating of 4 out of 5, reflecting strong buyer confidence in the development. Oscar Om Nandanvan stands out as a well-located, amenity-rich residential project in Mulund West, ideal for families seeking a modern flat with strong connectivity, lifestyle amenities, and long-term growth potential.
Om Nandanvan QR Code
Om Nandanvan
MahaRERA - P51800056240

Oberoi Eternia

₹ 2.68 Crs. onwards
Mulund West
3 BHK apartments
View Details

Oberoi Enigma

₹ 3.55 Crs. onwards
Mulund West
3/4 BHK apartments
View Details

Ashford Regal

₹ 96 Lacs. onwards
Mulund West
1/2/3½ BHK apartments
View Details

Piramal Revanta Vana

₹ 2.59 Crs. onwards
Mulund West
2/2½/3 BHK apartments
View Details

Prestige Forest Hills

₹ 2.67 Crs. onwards
Mulund West
3/4 BHK apartments
View Details

Vardhan Bliss

₹ 1.81 Crs. onwards
Mulund West
2/2½/3 BHK apartments
View Details

Runwal The Sanctuary

₹ 1.69 Crs. onwards
Mulund West
2/3 BHK apartments
View Details

Piramal Revanta Ravin

₹ 1.26 Crs. onwards
Mulund West
1/2/3 BHK apartments
View Details
Project Details
Project details were last updated in Dec 2025
  • Project:
    Om Nandanvan
  • Location:
  • Mulund West, Bawa Praduman Singh Cross Road No. 1
  • Const. Stage:
    Under Construction
  • Possession:
    Dec 2027
  • Floors:
    21
Developer Details

  • Developer:
    Oscar Infrastructure PVT LTD
  • Phone:
    02225657999
  • Website:
    www.oscarinfra.com
  • Address:
  • 711, Corporate Center, Nirmal Lifestyle, LBS Road, Mulund West
Project Ratings
Project Amenities
Amenities offred in Om Nandanvan
LIFESTYLE AMENITIES
Indoor GamesGymnasiumClub HouseConcealed PlumbingConcealed WiringMarble flooringGranite PlatformSecurity Help DeskReception Desk
Project RERA Details
RERA Project Status New
Proposed Possession 31 Dec 2027
Revised Possession
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800056240
RERA Project Name Om Nandanvan
RERA Location 913 B
RERA Developer
Architect Sepco Architect Nitin Gunjal
Project RERA Details
Project Type Residential / Group Housing
Funding Bank KOTAK MAHINDRA BANK LIMITED
Last Modified 22 May 2024
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Mulund West

Facilities & Amenities
Facilities, Amenities & Common areas details of Om Nandanvanlast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Yet To Start
Energy management
Na
Fire Protection And Fire Safety Requirements
Yet To Start
Landscaping & Tree Planting
Only Tree Plantation (Yet To Start)
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Only Chamber Lines (Yet To Start)
Solid Waste Management And Disposal
Na
Storm Water Drains
Yet To Start
Street Lighting
Yet To Start
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Only Rain Water Harvesting (Yet To Start)
Water Supply
Yet To Start
Buildings / Wings in Om Nandanvan
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Om Nandanvanby Oscar Infrastructure PVT LTDlast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

22863 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

122 apartments in total
Total
122
Booked
0
Available
122

Saleable Area Statistics (Sq. ft.)

71863 Total
Total
71863
Booked
0
Available
71863
Total 122 apartments in project. 0 apartments booked. 0% apartments booked.
Total 6676.27 saleable area. 0 apartments booked.
0% area booked.

Om Nandanvan

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Om NandanvanDec 202721111200
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK71.44 Sq.mts. ( 769 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK75.99 Sq.mts. ( 818 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK76.09 Sq.mts. ( 819 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK77.29 Sq.mts. ( 832 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK68.47 Sq.mts. ( 737 Sq.ft. )8
None Booked0% Booked
0% Booked
2 BHK69.03 Sq.mts. ( 743 Sq.ft. )4
None Booked0% Booked
0% Booked
3 BHK104.7 Sq.mts. ( 1127 Sq.ft. )10
None Booked0% Booked
0% Booked
3 BHK127.74 Sq.mts. ( 1375 Sq.ft. )1
None Booked0% Booked
0% Booked
PTC 1RK27.88 Sq.mts. ( 300 Sq.ft. )59
None Booked0% Booked
0% Booked
Rehab 1BHK45.99 Sq.mts. ( 495 Sq.ft. )4
None Booked0% Booked
0% Booked
Rehab 2BHK68.04 Sq.mts. ( 732 Sq.ft. )1
None Booked0% Booked
0% Booked
Rehab 2BHK68.08 Sq.mts. ( 733 Sq.ft. )2
None Booked0% Booked
0% Booked
Rehab 2BHK72.28 Sq.mts. ( 778 Sq.ft. )2
None Booked0% Booked
0% Booked
Rehab 2BHK72.67 Sq.mts. ( 782 Sq.ft. )9
None Booked0% Booked
0% Booked
Rehab 2BHK73.75 Sq.mts. ( 794 Sq.ft. )1
None Booked0% Booked
0% Booked
Rehab 2BHK75.7 Sq.mts. ( 815 Sq.ft. )2
None Booked0% Booked
0% Booked
Rehab 2BHK70.8 Sq.mts. ( 762 Sq.ft. )3
None Booked0% Booked
0% Booked
Rehab 2BHK83.64 Sq.mts. ( 900 Sq.ft. )3
None Booked0% Booked
0% Booked
Rehab 2BHK83.74 Sq.mts. ( 901 Sq.ft. )1
None Booked0% Booked
0% Booked
Rehab 3BHK96.62 Sq.mts. ( 1040 Sq.ft. )8
None Booked0% Booked
0% Booked
122 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Om NandanvanCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Completed 100% done
100% Booked
Podiums (if any)
work-in-progress60% done
60% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
work-in-progress60% done
60% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Project Consultants
Channel Partners Registered by Developer
Oscar Infrastructure PVT LTD
for Project
Om Nandanvan
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Oscar Infrastructure PVT LTD