Niharika Absolute Project at Kharghar by Juhi Developers (P52000020033)
  • Rating:
  • ()

Niharika Absolute - Kharghar

Project Details, Configuration & Prices
1 BHK417 Sq.ft. Carpet ₹ Call for Price
2 BHK636 Sq.ft. Carpet ₹ Call for Price
Project overview
Niharika Absolute Project at Kharghar by Juhi Developers (P52000020033) is a RERA approved Under Construction Project with RERA ID P52000020033 with 1/2 BHK apartments / Flats starting from N/A onwards

Juhi Niharika Absolute, Kharghar is a well-planned residential development by Juhi Infrabuild, located in one of Navi Mumbai’s most sought-after nodes. Spread across 2.29 acres, the project offers thoughtfully designed 1 BHK and 2 BHK flats that reflect a fine balance of elegance, simplicity, and modern urban living. With construction progressing steadily, the project is targeted for completion by January 2025, and bookings are currently open. The flats at Juhi Niharika Absolute are designed to maximise space, light, and ventilation, with airy rooms, well-positioned windows, and balconies that enhance everyday comfort. Carpet areas range from approximately 417 sq.ft. to 735 sq.ft., making the homes suitable for both end users and investors looking for compact yet efficient layouts. The project features three open-side properties, ensuring better airflow and openness across the residences. Strategically located in Kharghar, Navi Mumbai, the project enjoys excellent connectivity. The Kharghar railway station is just about 2 km away, while the upcoming Navi Mumbai International Airport is approximately 7 km from the site, significantly boosting future value. Kharghar’s well-developed infrastructure, educational institutions, and commercial growth make it a preferred residential destination within the Navi Mumbai region. Juhi Niharika Absolute offers a secure and comfortable lifestyle within a gated community, complemented by lifestyle amenities such as a landscaped garden and children’s play area. The project blends contemporary architecture with practical features, making it an attractive choice for homebuyers seeking long-term value. Prices at Juhi Niharika Absolute start from ?67 Lakhs onwards*, with 1 BHK and 2 BHK flats available for sale. Backed by the reputation of Juhi Developers, the project has received positive feedback for its location, design, and construction quality, positioning it as a solid residential and investment opportunity in Kharghar.
Niharika Absolute QR Code
Niharika Absolute
MahaRERA - P52000020033

Sai World Empire

₹ 1.07 Crs. onwards
Kharghar
2/3/4 BHK apartments
View Details

Arihant Clan Aalishan - Phase 1

₹ 75.43 Lacs. onwards
Kharghar
1 RK/2/3 BHK apartments
View Details

Trishul Symphony

₹ 1.5 Crs. onwards
Kharghar
2/3 BHK apartments
View Details

Arihant Clan Aalishan - Phase 2

₹ 1.06 Crs. onwards
Kharghar
2/3 BHK apartments
View Details

SM Acumen

₹ 1.45 Crs. onwards
Kharghar
2/3 BHK apartments
View Details

Tricity Aspire

₹ 99.5 Lacs. onwards
Kharghar
2/3 BHK apartments
View Details
Kharghar
2/2½/3 BHK apartments
View Details
Kharghar
2/3 BHK apartments
View Details
Project Details
Project details were last updated in Dec 2025
  • Project:
    Niharika Absolute
  • Location:
  • Kharghar, Sector-39 A
  • Const. Stage:
    Under Construction
  • Possession:
  • Parking:
    Podium;
Developer Details

  • Developer:
    Juhi Developers
  • Phone:
    02227841523
  • Website:
    www.juhidevelopers.com
  • Address:
  • 1605/1606, The Ambience Court, Plot No.2, Sector 19 D, Opp.RTO Office, Vashi, Navi Mumbai 400 703.
Project Ratings
Project Amenities
Amenities offred in Niharika Absolute
LIFESTYLE AMENITIES
Indoor GamesHealth ClubSwimming PoolIntercom/CCTVConcealed PlumbingConcealed WiringMarble flooringGranite PlatformSecurity Help DeskReception Desk
Project RERA Details
RERA Project Status New
Proposed Possession 30 Jan 2026
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P52000020033
RERA Project Name Niharika Absolute
RERA Location A-10, Sector-39 A
RERA Developer Juhi Infrabuild Llp
Architect Triarch Design Studio
Project RERA Details
Project Type Residential / Group Housing
Funding Bank KOTAK MAHINDRA BANK LIMITED
Last Modified 19 Mar 2019
Last Retrived 28 Jul 2025

Most active Channel Partners, Real Estate Agents in Kharghar

Facilities & Amenities
Facilities, Amenities & Common areas details of Niharika Absolutelast updated on 28 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Na
Energy management100% completed
95% Complete
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Na
Landscaping & Tree Planting100% completed
95% Complete
Na
Open Parking100% completed
95% Complete
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Na
Solid Waste Management And Disposal100% completed
95% Complete
Na
Storm Water Drains100% completed
95% Complete
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Na
Water Supply100% completed
95% Complete
Na
Buildings / Wings in Niharika Absolute
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Niharika Absoluteby Juhi Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA. Disclaimer

100105 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 6

Wings / Towers in Project

Apartments Statistics

342 apartments in total
Total
342
Booked
173
Available
169

Saleable Area Statistics (Sq. ft.)

136989 Total
Total
136989
Booked
71210
Available
65778
Total 342 apartments in project. 173 apartments booked. 50% apartments booked.
Total 12726.55 saleable area. 6615.602 apartments booked.
52% area booked.

Niharika Absolute- A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Niharika Absolute- A WingJan 202515102100
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK26.937 Sq.mts. ( 290 Sq.ft. )12
9 Booked75% Booked
75% Booked
1 BHK31.848 Sq.mts. ( 343 Sq.ft. )12
7 Booked58% Booked
58% Booked
1 BHK32.45 Sq.mts. ( 349 Sq.ft. )11
1 BHK34.343 Sq.mts. ( 370 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK36.69 Sq.mts. ( 395 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK38.2 Sq.mts. ( 411 Sq.ft. )11
None Booked0% Booked
0% Booked
2 BHK39.993 Sq.mts. ( 430 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK40.082 Sq.mts. ( 431 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK40.442 Sq.mts. ( 435 Sq.ft. )11
None Booked0% Booked
0% Booked
61 total apartments / 19 apartments booked. 31% apartments booked.
Work Description in Building Niharika Absolute- A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Niharika Absolute- B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Niharika Absolute- B WingJan 202515102102
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK23.41 Sq.mts. ( 252 Sq.ft. )11
4 Booked36% Booked
36% Booked
1 BHK24 Sq.mts. ( 258 Sq.ft. )12
3 Booked25% Booked
25% Booked
1 BHK29.5 Sq.mts. ( 318 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK45.13 Sq.mts. ( 486 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK47.54 Sq.mts. ( 512 Sq.ft. )12
10 Booked83% Booked
83% Booked
2 BHK50.43 Sq.mts. ( 543 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK42.45 Sq.mts. ( 457 Sq.ft. )11
8 Booked72% Booked
72% Booked
49 total apartments / 28 apartments booked. 57% apartments booked.
Work Description in Building Niharika Absolute- B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Niharika Absolute- C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Niharika Absolute- C WingJan 202515102102
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK32.13 Sq.mts. ( 346 Sq.ft. )11
6 Booked54% Booked
54% Booked
1 BHK36.02 Sq.mts. ( 388 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK42.45 Sq.mts. ( 457 Sq.ft. )12
11 Booked91% Booked
91% Booked
2 BHK42.47 Sq.mts. ( 457 Sq.ft. )11
7 Booked63% Booked
63% Booked
2 BHK45.13 Sq.mts. ( 486 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK45.15 Sq.mts. ( 486 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK50.85 Sq.mts. ( 547 Sq.ft. )24
7 Booked29% Booked
29% Booked
61 total apartments / 31 apartments booked. 50% apartments booked.
Work Description in Building Niharika Absolute- C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Niharika Absolute- D Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Niharika Absolute- D WingJan 202515102102
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK32.13 Sq.mts. ( 346 Sq.ft. )11
8 Booked72% Booked
72% Booked
1 BHK34.56 Sq.mts. ( 372 Sq.ft. )12
5 Booked41% Booked
41% Booked
1 BHK36.13 Sq.mts. ( 389 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK42.45 Sq.mts. ( 457 Sq.ft. )12
10 Booked83% Booked
83% Booked
2 BHK42.58 Sq.mts. ( 458 Sq.ft. )11
9 Booked81% Booked
81% Booked
2 BHK45.13 Sq.mts. ( 486 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK45.26 Sq.mts. ( 487 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK49.19 Sq.mts. ( 529 Sq.ft. )12
8 Booked66% Booked
66% Booked
61 total apartments / 41 apartments booked. 67% apartments booked.
Work Description in Building Niharika Absolute- D WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Niharika Absolute- E Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Niharika Absolute- E WingJan 202515102102
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK22.47 Sq.mts. ( 242 Sq.ft. )12
4 Booked33% Booked
33% Booked
1 BHK26.54 Sq.mts. ( 286 Sq.ft. )11
10 Booked90% Booked
90% Booked
1 BHK29.38 Sq.mts. ( 316 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK42.45 Sq.mts. ( 457 Sq.ft. )11
11 Booked100% Booked
100% Booked
2 BHK45.13 Sq.mts. ( 486 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK47.54 Sq.mts. ( 512 Sq.ft. )12
9 Booked75% Booked
75% Booked
2 BHK50.43 Sq.mts. ( 543 Sq.ft. )1
1 Booked100% Booked
100% Booked
49 total apartments / 37 apartments booked. 75% apartments booked.
Work Description in Building Niharika Absolute- E WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Niharika Absolute- F Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Niharika Absolute- F WingJan 202515102102
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK25.4 Sq.mts. ( 273 Sq.ft. )12
4 Booked33% Booked
33% Booked
1 BHK31.84 Sq.mts. ( 343 Sq.ft. )12
1 BHK32.5 Sq.mts. ( 350 Sq.ft. )11
1 BHK33.89 Sq.mts. ( 365 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK38.84 Sq.mts. ( 418 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK39.83 Sq.mts. ( 429 Sq.ft. )12
6 Booked50% Booked
50% Booked
2 BHK39.92 Sq.mts. ( 430 Sq.ft. )11
None Booked0% Booked
0% Booked
2 BHK42.44 Sq.mts. ( 457 Sq.ft. )1
1 Booked100% Booked
100% Booked
61 total apartments / 17 apartments booked. 27% apartments booked.
Work Description in Building Niharika Absolute- F WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
Project Consultants
Channel Partners Registered by Developer
Juhi Developers
for Project
Niharika Absolute
last updated on 28 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Juhi Developers

Juhi Developers provides the most loyal and dedicated service in the Real Estate Industry. Client‘s satisfaction is our foremost concern and we implement this dedication towards building a long term client relationship. We are a team of committed professionals. Our approach always ensures that every client is important to us. Juhi Developers bring to each of our projects, Technological and Engineering excellence coupled with comfort and convenience that transcends conventional norms and sets the paradigm for quality and perfection in the current real estate scenario. With a Glorious Clientele, Network of Investors & Financers, Efficient Supply Chain and Banker Relations, we are set to achieve newer benchmarks in Real Estate industry. To make it possible for his clients to own houses, shops or offices, Mr.Vijay Bajaj thought like a buyer. His ability to step into his buyer’s thinking cap, has been the Juhi Developers has put its best efforts for buyer satisfaction through its upcoming recent projects with the help of world class amenities and facilities at the disposal of the buyers. Because we here in Juhi Developers aim at equalizing our customer’s satisfaction with ours. All possible with the imagination and hard work of Mr.Vijay Bajaj.