Mount Bliss Project at Belapur by Today Royal Group (P51700055627)
  • Rating:
  • ()

Mount Bliss - Belapur

Today Royal Group
Project Details, Configuration & Prices
2 BHK1360 Sq.ft. Carpet ₹ 2.15 Cr ++
3 BHK2090 Sq.ft. Carpet ₹ 3.22 Cr ++
Project overview
Mount Bliss Project at Belapur by Today Royal Group (P51700055627) is a RERA approved Under Construction Project with RERA ID P51700055627 slated to be ready for possession by Dec 2027 with 2/3 BHK apartments / Flats starting from N/A onwards

Mount Bliss, located at Plot No. 01, Sector 30/31, CBD Belapur, is a thoughtfully crafted residential address that reflects elegance, comfort, and a refined lifestyle. Designed for those who value meaningful living, the project embodies the philosophy that your home is a true extension of your personality, achievements, and aspirations. From the very entrance, Mount Bliss creates a warm and positive first impression, setting the tone for a home that feels naturally welcoming and serene. The residences are intelligently designed with floor-to-ceiling full-length windows that invite abundant natural light and offer soothing views of the surroundings. Mornings begin with the calming hues of the orange-tinted sky, while lush greenery below and the evolving skyline create a sense of peaceful luxury throughout the day. Every corner of the home is planned to enhance comfort, positivity, and a seamless connection with nature. While the entire project radiates tranquility, the swimming pool stands out as a personal retreat where residents can truly unwind. It offers a perfect escape from daily stress, allowing you to relax, rejuvenate, and immerse yourself in moments of calm. At Mount Bliss, everyday living is elevated into an experience where precious moments are cherished and life flows at a gentler, more fulfilling pace. The project features high-quality specifications that ensure durability and refined aesthetics. All rooms are finished with vitrified flooring, while kitchens come equipped with granite platforms, stainless steel sinks, and ceramic tile dado up to beam level. The external façade is finished with acrylic paint, and interiors are coated with premium plastic emulsion paint, enhancing both appearance and longevity. Doors are designed with laminate finishes, wooden frames for main and bedroom doors, and granite frames for bathroom doors, complemented by good-quality hardware and decorative handles. Powder-coated aluminium sliding windows with tinted glass extend from top to bottom, enhancing ventilation and visual appeal. Bathrooms are fitted with ceramic dado tiles, concealed plumbing, and premium CP and sanitary fittings for a clean and modern finish. Electrical systems include concealed copper wiring with ELCB and MCB safety features, along with adequate electrical points and premium modular switches across all rooms. The project is supported by underground and overhead water tanks with ample storage capacity, and the terrace is treated with special waterproofing to ensure long-term protection and peace of mind.
Mount Bliss QR Code
Mount Bliss
MahaRERA - P51700055627

Bhumiraj Hills Tower 2 & 3

₹ 1 Crs. onwards
Belapur
1/2 BHK apartments
View Details

Gami Erica

₹ 80.02 Lacs. onwards
Belapur
1/2 BHK apartments
View Details
Belapur
Office BHK apartments
View Details
Belapur
2/3 BHK apartments
View Details

Bhumiraj Hills Tower 4

₹ 1 Crs. onwards
Belapur
1/2 BHK apartments
View Details
Project Details
Project details were last updated in Dec 2025
  • Project:
    Mount Bliss
  • Location:
  • Belapur, Sector No- 31
  • Const. Stage:
    Under Construction
  • Possession:
    Dec 2027
  • Parking:
    Podium;
Developer Details

Today Royal Group

  • Developer:
    Today Royal Group
  • Phone:
    022 27579898
  • Website:
    www.todayroyal.com
  • Address:
  • Office No. 201, Plot No. 17, Mayuresh Square, Sec No.15, CBD Belapur, Navi Mumbai - 400614.
Project Ratings
Project Amenities
Amenities offred in Mount Bliss
LIFESTYLE AMENITIES
Indoor GamesKid's play areaBalconyJogging TrackGymnasiumClub HouseConcealed PlumbingConcealed WiringMarble flooringGranite PlatformSecurity Help DeskReception Desk
Project RERA Details
RERA Project Status New
Proposed Possession 30 Dec 2027
Revised Possession
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51700055627
RERA Project Name Mount Bliss
RERA Location Plot No- 1, Sector No- 31, Belapur
RERA Developer Today Royal Buildcon
Project RERA Details
Project Type Others
Funding Bank AXIS BANK
Last Modified 04 Apr 2024
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Belapur

Facilities & Amenities
Facilities, Amenities & Common areas details of Mount Blisslast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Electrical Meter Room Substation And Dg Set
Energy management
Na
Fire Protection And Fire Safety Requirements
Not Commenced. Will Be Provided As Per Udcpr.
Landscaping & Tree Planting
28 Nos. Of Trees To Be Planted
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Stp
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Not Commenced. Will Be Provided As Per Udcpr.
Water Supply
After Completion From Nmmc
Buildings / Wings in Mount Bliss
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Mount Blissby Today Royal Grouplast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

30436 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

38 apartments in total
Total
38
Booked
4
Available
34

Saleable Area Statistics (Sq. ft.)

29552 Total
Total
29552
Booked
2629
Available
26924
Total 38 apartments in project. 4 apartments booked. 10% apartments booked.
Total 2745.48 saleable area. 244.21 apartments booked.
9% area booked.

Wing A And Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing A And Wing BDec 2027111310116194
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK68.05 Sq.mts. ( 732 Sq.ft. )6
None Booked0% Booked
0% Booked
2 BHK72.79 Sq.mts. ( 784 Sq.ft. )6
None Booked0% Booked
0% Booked
3 BHK101.81 Sq.mts. ( 1096 Sq.ft. )2
None Booked0% Booked
0% Booked
3 BHK102.26 Sq.mts. ( 1101 Sq.ft. )3
None Booked0% Booked
0% Booked
3 BHK106.82 Sq.mts. ( 1150 Sq.ft. )3
None Booked0% Booked
0% Booked
Office space71.52 Sq.mts. ( 770 Sq.ft. )6
None Booked0% Booked
0% Booked
Shop92.3 Sq.mts. ( 994 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop33.5 Sq.mts. ( 361 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop34.5 Sq.mts. ( 371 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop39 Sq.mts. ( 420 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop44.8 Sq.mts. ( 482 Sq.ft. )2
None Booked0% Booked
0% Booked
Shop46.58 Sq.mts. ( 501 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop51.1 Sq.mts. ( 550 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop60.77 Sq.mts. ( 654 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop65.84 Sq.mts. ( 709 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop66.5 Sq.mts. ( 716 Sq.ft. )1
1 Booked100% Booked
100% Booked
38 total apartments / 4 apartments booked. 10% apartments booked.
Work Description in Building Wing A And Wing BCompletion
Basement (if any)
Excavation
work-in-progress90% done
90% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Project Consultants
Channel Partners Registered by Developer
Today Royal Group
for Project
Mount Bliss
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Today Royal Group

Today Royal Group The year 2014 marks the completion of 25 years of Today Royal Group's steadfast commitment to excellence. What began as a small enterprise in two decades ago, is now an extraordinaire - a force to reckon with. Since inception, we have strived for benchmark quality, customer centric approach, robust engineering, in-house research, uncompromising business ethics, timeless values and transparency in all spheres of business conduct, making Today Royal Group a most preferred brand. We are acutely conscious of the fact that due to rapid urbanization, there are huge challenges and as responsible player we shall continue to provide intelligent solutions in a manner which is sustainable. We rely on our people, their capacities to innovate and use of technology to create immense value for all our stakeholders. We will continue to raise the bar and set new standards in the industry we deal in to strengthen this goal of ours.