Mesacon Greens Project at Andheri West by Mesacon Group (P51800054234)
  • Rating:
  • ()

Mesacon Greens - Andheri West

Project Details, Configuration & Prices
2 BHK715 Sq.ft. Carpet ₹ 3.07 Cr ++
2 BHK771 Sq.ft. Carpet ₹ 3.31 Cr ++
3 BHK855 Sq.ft. Carpet ₹ 3.67 Cr ++
3 BHK979 Sq.ft. Carpet ₹ 4.20 Cr ++
3 BHK1265 Sq.ft. Carpet ₹ 5.43 Cr ++
4 BHK1517 Sq.ft. Carpet ₹ 6.52 Cr ++
4 BHK2048 Sq.ft. Carpet ₹ 8.80 Cr ++
Project overview
Mesacon Greens Project at Andheri West by Mesacon Group (P51800054234) is a RERA approved Under Construction Project with RERA ID P51800054234 slated to be ready for possession by Jun 2027 with 2/3/4 BHK apartments / Flats starting from ₹ 3.07 Crs onwards

Located on S.V. Road, Andheri West, Mesacon Greens is a 1.5-acre gated community offering 2, 3, and 4 BHK homes, duplexes, and penthouses. With ~12,000 sq. ft. of premium living spaces and 40+ amenities, including a swimming pool, zen garden, mini theatre, and gym, it sets a new standard for urban luxury. Surrounded by elite societies, top schools, healthcare, malls, and entertainment hubs, Andheri West offers seamless connectivity to all parts of Mumbai via metro, rail, and highways. Mesacon Greens combines sophisticated design, convenience, and exclusivity for the discerning few.
Mesacon Greens QR Code
Mesacon Greens
MahaRERA - P51800054234

Transcon Triumph - Tower 4

₹ 2.97 Crs. onwards
Andheri West
2/3 BHK apartments
View Details

Adani Linkbay Residences

₹ 3.25 Crs. onwards
Andheri West
2/3/4 BHK apartments
View Details

Bharat Altavistas

₹ 5.77 Crs. onwards
Andheri West
3/6 BHK apartments
View Details

Rustomjee Ocean Vista

₹ 19.67 Crs. onwards
Andheri West
4/5 BHK apartments
View Details

Parinee I

₹ 3 Crs. onwards
Andheri West
Office BHK apartments
View Details

DLF WestPark

₹ 4.2 Crs. onwards
Andheri West
3 BHK apartments
View Details
Andheri West
3/4 BHK apartments
View Details

Godrej Sky Shores

₹ 8.25 Crs. onwards
Andheri West
3/4 BHK apartments
View Details
Project Details
Project details were last updated in Oct 2025
  • Project:
    Mesacon Greens
  • Location:
  • Andheri West, Next to Shoppers Stop, SV Road
  • Const. Stage:
    Under Construction
  • Possession:
    Jun 2027
Developer Details

  • Developer:
    Mesacon Group
  • Phone:
    022 26705777
  • Website:
    www.mesacongroup.com
  • Address:
  • Mesacon Projects, C-21/22, Mesacon Jewel, Plot No.62, Lallubhai Shamaldas Rd, Andheri West, Mumbai - 400058
Project Ratings
Project Brochures
Brochures of Mesacon Greensby Mesacon Group
Project Brochures
  • MPE/Brochures/31261/Mesacon Greens E Brochure.pdf
Project Amenities
Amenities offred in Mesacon Greens
LIFESTYLE AMENITIES
High speed elevatorsGrand entrance lobbyAluminium Sliding WindowsPOP finished wallsImported Sanitary FittingsConcealed PlumbingConcealed WiringGranite PlatformSecurity Help DeskReception Desk
Project RERA Details
RERA Project Status New
Proposed Possession 30 Jun 2027
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800054234
RERA Project Name Mesacon Greens
RERA Location 551, 551/1 To 2
RERA Developer Mesacon Spaces Llp
Architect Ashim
Project RERA Details
Project Type Residential / Group Housing
Funding Bank HDFC BANK
Last Modified 15 Jul 2025
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Andheri West

Facilities & Amenities
Facilities, Amenities & Common areas details of Mesacon Greenslast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Work Not Yet Started
Energy management
Na
Fire Protection And Fire Safety Requirements
Work Not Yet Started
Landscaping & Tree Planting
Work Not Yet Started
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Work Not Yet Started
Solid Waste Management And Disposal
Work Not Yet Started
Storm Water Drains
Work Not Yet Started
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Work Not Yet Started
Water Supply
Work Not Yet Started
Buildings / Wings in Mesacon Greens
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Mesacon Greensby Mesacon Grouplast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

47915 Sq. ft.

Project Area

5242 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

128 apartments in total
Total
128
Booked
2
Available
126

Saleable Area Statistics (Sq. ft.)

128923 Total
Total
128923
Booked
1466
Available
127457
Total 128 apartments in project. 2 apartments booked. 1% apartments booked.
Total 11977.26 saleable area. 136.2 apartments booked.
1% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingJun 202712101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK71.65 Sq.mts. ( 771 Sq.ft. )5
None Booked0% Booked
0% Booked
2 BHK66.43 Sq.mts. ( 715 Sq.ft. )4
1 Booked25% Booked
25% Booked
3 BHK91 Sq.mts. ( 980 Sq.ft. )3
None Booked0% Booked
0% Booked
3 BHK117.52 Sq.mts. ( 1265 Sq.ft. )5
None Booked0% Booked
0% Booked
3 BHK79.43 Sq.mts. ( 855 Sq.ft. )3
None Booked0% Booked
0% Booked
3 BHK83.15 Sq.mts. ( 895 Sq.ft. )3
None Booked0% Booked
0% Booked
3 BHK105.82 Sq.mts. ( 1139 Sq.ft. )1
None Booked0% Booked
0% Booked
5 BHK & more511.42 Sq.mts. ( 5505 Sq.ft. )1
None Booked0% Booked
0% Booked
EXISTING MEMBER98.19 Sq.mts. ( 1057 Sq.ft. )1
None Booked0% Booked
0% Booked
EXISTING MEMBER66.43 Sq.mts. ( 715 Sq.ft. )2
None Booked0% Booked
0% Booked
EXISTING MEMBER83.15 Sq.mts. ( 895 Sq.ft. )7
None Booked0% Booked
0% Booked
EXISTING MEMBER83.33 Sq.mts. ( 897 Sq.ft. )10
None Booked0% Booked
0% Booked
EXISTING MEMBER86.12 Sq.mts. ( 927 Sq.ft. )1
None Booked0% Booked
0% Booked
EXISTING MEMBER87.79 Sq.mts. ( 945 Sq.ft. )1
None Booked0% Booked
0% Booked
EXISTING MEMBER79.43 Sq.mts. ( 855 Sq.ft. )4
None Booked0% Booked
0% Booked
EXISTING MEMBER79.52 Sq.mts. ( 856 Sq.ft. )1
None Booked0% Booked
0% Booked
EXISTING MEMBER105.82 Sq.mts. ( 1139 Sq.ft. )4
None Booked0% Booked
0% Booked
56 total apartments / 1 apartments booked. 1% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress30% done
30% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress50% done
50% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingJun 20279101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK69.77 Sq.mts. ( 751 Sq.ft. )3
1 Booked33% Booked
33% Booked
3 BHK74.88 Sq.mts. ( 806 Sq.ft. )3
None Booked0% Booked
0% Booked
3 BHK93.74 Sq.mts. ( 1009 Sq.ft. )5
None Booked0% Booked
0% Booked
EXISTING MEMBER93.74 Sq.mts. ( 1009 Sq.ft. )4
None Booked0% Booked
0% Booked
EXISTING MEMBER74.88 Sq.mts. ( 806 Sq.ft. )4
None Booked0% Booked
0% Booked
EXISTING MEMBER69.77 Sq.mts. ( 751 Sq.ft. )3
None Booked0% Booked
0% Booked
EXISTING MEMBER69.79 Sq.mts. ( 751 Sq.ft. )1
None Booked0% Booked
0% Booked
23 total apartments / 1 apartments booked. 4% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress40% done
40% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress60% done
60% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress70% done
70% Booked
X number of Podiums
X number of Slabs of Super Structure

C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C WingJun 202712101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK52.03 Sq.mts. ( 560 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK74.88 Sq.mts. ( 806 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK81.75 Sq.mts. ( 880 Sq.ft. )5
None Booked0% Booked
0% Booked
3 BHK92.06 Sq.mts. ( 991 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK112.41 Sq.mts. ( 1210 Sq.ft. )5
None Booked0% Booked
0% Booked
4 BHK140.93 Sq.mts. ( 1517 Sq.ft. )2
None Booked0% Booked
0% Booked
4 BHK163.52 Sq.mts. ( 1760 Sq.ft. )2
None Booked0% Booked
0% Booked
EXISTING MEMBER623.64 Sq.mts. ( 6713 Sq.ft. )1
None Booked0% Booked
0% Booked
EXISTING MEMBER112.41 Sq.mts. ( 1210 Sq.ft. )3
None Booked0% Booked
0% Booked
EXISTING MEMBER129.51 Sq.mts. ( 1394 Sq.ft. )1
None Booked0% Booked
0% Booked
EXISTING MEMBER93.27 Sq.mts. ( 1004 Sq.ft. )7
None Booked0% Booked
0% Booked
EXISTING MEMBER96.35 Sq.mts. ( 1037 Sq.ft. )1
None Booked0% Booked
0% Booked
EXISTING MEMBER81.75 Sq.mts. ( 880 Sq.ft. )2
None Booked0% Booked
0% Booked
EXISTING MEMBER91.14 Sq.mts. ( 981 Sq.ft. )1
None Booked0% Booked
0% Booked
EXISTING MEMBER74.88 Sq.mts. ( 806 Sq.ft. )7
None Booked0% Booked
0% Booked
EXISTING MEMBER52.03 Sq.mts. ( 560 Sq.ft. )7
None Booked0% Booked
0% Booked
EXISTING MEMBER57.32 Sq.mts. ( 617 Sq.ft. )1
None Booked0% Booked
0% Booked
49 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress46% done
46% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress65% done
65% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress85% done
85% Booked
X number of Podiums
X number of Slabs of Super Structure
Project Consultants
Channel Partners Registered by Developer
Mesacon Group
for Project
Mesacon Greens
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Mesacon Group